Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on July 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Solar Construction on New Building

Closed
1232SA26Q0880Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 14 hours ago

DEADLINE

in 18 days
NAICS: 237130
New
SLED
FTTP-PHASE 4 -IFB 16
Solicitation # IFB 16
Shrewsbury Electric and Cable Operations (SELCO) is soliciting bids for the Fiber to the Premises (FTTP) Network Upgrade Phase 4 in Shrewsbury, Massachusetts. The project involves the installation of approximately 15 miles of single-mode aerial and underground fiber optic cable, including signal transmission and distribution laterals from the existing backbone ring to splitter cabinets and public right-of-way access points. The scope of work encompasses cable installation, splicing, and bi-directional testing, with specific technical requirements for fiber characterization and the use of FieldSmart Fiber Scalability Center equipment. The contract will be awarded to the lowest responsible and eligible bidder, with bids due by September 29, 2026. The project is governed by Massachusetts General Laws, requiring compliance with prevailing wage rates, anti-discrimination statutes, and debarment certifications. Bidders must provide a 5% bid deposit and the selected contractor must furnish a payment bond for 100% of the contract price. Performance is tied to a strict baseline schedule, with full completion, including final deliverables and punch list items, required within 30 weeks of mobilization. SELCO will retain 25% of the total contract value until a final audit and verification of all as-built documentation and testing results are completed. All work must adhere to OSHA safety regulations and local Shrewsbury noise and hour ordinances.
SELCO1 - SELCO

POSTED

1 day ago

DEADLINE

in 17 days

AI Contract Overview

Show more

This contract solicitation, identified as 1232SA26Q0880, is a combined synopsis and solicitation issued under FAR Part 12 for the installation of a new solar array on the rooftop of an existing building at the Southwest Watershed Research Center in Tucson, Arizona. The acquisition is structured as a Total Small Business Set-Aside under NAICS code 237130, with a small business size standard of $45 million, and is open only to responsible small business concerns. The solicitation is an RFQ and no separate written solicitation will be issued; all quotations must be submitted by the deadline of August 7, 2026. The work includes electrical installations for a 12.47 kV primary and 208V/120V secondary system, final connections to the existing transformer, patching and repair of the roof membrane, and full project management. The performance period is set at 200 calendar days from the Notice to Proceed. All proposals must comply with numerous mandatory contract clauses, including labor standards under the Davis-Bacon Act, whistleblower protections, anti-trafficking requirements, and security protocols for information systems. Offerors must submit a fully completed SF 1442, a summary cover letter with SAM UEI and Tax ID, an acknowledgement of all amendments, and all specified attachments, including the Statement of Work, project specifications, PV drawings, pricing schedule, and wage determination. Failure to provide any required document renders the offer non-responsive. The award will be made using a Lowest Priced Technically Acceptable methodology, where technical acceptability and past performance serve as pass/fail gates. Acceptability depends on meeting all specifications, safety standards including EM 385-1-1, material handling and labeling requirements, and submission of a Site Specific Safety Plan approved by the Government. Contractors must provide an on-site superintendent with five years of relevant experience and a certified Site Safety and Health Officer, maintain workforce integrity, adhere to Buy American requirements, and comply with prevailing wage rates as specified. Performance and Payment Bonds are required, along with specific insurance coverage. Invoices must include detailed information including TIN, SAM UEI, contract number, and deliverables, and submission must follow a dual process: an original and copy to the Contracting Officer and COR, followed by electronic submission through the Treasury’s IPP portal. Inspection and acceptance follow a multi-stage process with formal notifications, required attendance by contractor representatives

General Info

Solar construction set-aside for small businesses at Tucson AZ, deadline July 24, 2026, USDA ARS contract.

Agency

Department Of Agriculture → USDA Ars Afm ApdView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

MD

Set-Aside

SBA

Documents

(12)

SOW Solar Construction on New Building Tucson AZ 1232SA26Q0880

DOCXsow

Amendment 0002 to Solicitation 1232SA26Q0880

PDFamendment

Solicitation 1232SA2600880 Southwest Watershed Research Center Solar Phase 1

PDFifb

Site Visit Information for Solicitation 1232SA26Q0880

PDFsite-visit-information

AEP Span Panel and Paint Warranty Letter for PV Array Installation

PDFwarranty-letter

USDA ARS SWRC Solar PV Installation Drawings 100% CD

PDFdrawings

C04 Attachment 2 USDA ARS SWRC Solar PH1 Project Specification Manual

PDFspecifications

RFI Questions and Answers for Solicitation 1232SA26Q0880

PDFrfi

Amendment 0001 to Solicitation 1232SA26Q0880

PDFamendment

Wage Determination AZ20260040 for Arizona Pima County Construction

PDFwage-determination

Attachment 4 - Schedule of Pricing

XLSXschedule-of-pricing

C05_Attachment+7+Aerial+View+Photo.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Ars Afm Apd
Contacts1 person available
OfficeBELTSVILLE, MD, 20705, USA
Organization / Agency
Department Of Agriculture → USDA Ars Afm Apd
View Agency Profile
Office AddressBELTSVILLE, MD, 20705, USA
Contacts

Full Description

Show more

Amendment 0002 Posted.


Amendment 0001 Posted.


This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12.  This announcement constitutes the only solicitation.  Quotations are being requested and a separate written solicitation will not be issued. 



Solicitation number 1232SA26Q0880 is issued as a Request for Quotation (RFQ) for Southwest Watershed Research Center (SWRC) Solar Phase 1 at Tucson, AZ.



This acquisition  is set-aside for small business concerns.  The applicable North American Industry Classification Standard Code is 237130 - Power and Communication Line and Related Structures Construction.  The small business size standard is $45M  This acquisition is a Total Small Business Set-Aside.  All responsible sources may submit a quotation which will be considered by the agency.

More opportunities from Department Of Agriculture → USDA Ars Afm Apd

Same awarding agency

NAICS: 237110
New
Federal
Install Sewer Lift Station Pumps and Controls, Stoneville, Mississippi
Solicitation # 1232SA26Q1006
Solicitation 1232SA26Q1006 is a Request for Quotation issued by the USDA Agricultural Research Service for the removal of existing sewer lift station pumps and controls and the installation of new direct replacement Homa pumps and controls at Building 6, located at 141 Experiment Station Road in Stoneville, Mississippi. This acquisition is a total small business set-aside under NAICS code 237110. The project requires the contractor to provide all necessary equipment, labor, and materials, with a required performance completion period of 90 days from the date of award. The contract will be awarded based on the lowest price technically acceptable (LPTA) criteria, evaluating offers for technical acceptability and a neutral or acceptable past performance rating. Offerors must submit detailed pricing including labor, programming, and equipment costs by September 15, 2026, at 2:00 PM Central Time via email to Erin Riffey. Key compliance requirements include the submission of a site-specific safety plan within seven days of award, adherence to the Service Contract Act wage determinations for Mississippi, and compliance with FAR 52.219-14 limitations on subcontracting. Amendment 0001 provides critical responses to RFIs regarding technical specifications and site visits that must be acknowledged by the bidder.
Water and Sewer Line and Related Structures Construction

POSTED

about 18 hours ago

DEADLINE

in 4 days
View Details
NAICS: 238220
New
Federal
Water Softener Install Carl Hayden Research Center
Solicitation # 1232SA26Q1487
Solicitation 1232SA26Q1487 is a combined synopsis and request for quotation issued by the USDA ARS for the installation of a complete water softener system at Building 150 of the Carl Hayden Bee Research Center in Tucson, Arizona. This acquisition is a total set-aside for small business concerns under NAICS code 238220. The scope of work requires the contractor to provide all labor, materials, and warranties to install a 24x72 water softener with a brine salt tank, utilizing copper parts and piping, and establishing a drain line to the floor drain. All work must comply with Federal, State, and Local Code Standards, Unified Facilities Guide Specifications, and ARS 242.1M standards. The contract will be awarded as a firm-fixed price purchase order based on a lowest-price technically acceptable process. Offerors must submit quotations by September 21, 2026, and are required to complete specific blocks of the solicitation form along with certifications regarding SAM registration, recovered materials, and anti-discrimination and DEI compliance. The contractor is responsible for quality control and must adhere to Wage Determination 2015-5473 for Pima County, Arizona. Final acceptance is subject to inspection and approval by the Contracting Officer or Location Monitor to ensure the system is leak-free and functioning properly.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 18 hours ago

DEADLINE

in 10 days
View Details
NAICS: 238210
New
Federal
Supply and Install Greenhouse Evaporative Cooling System, Stoneville, Mississippi
Solicitation # 1232SA26Q1000
Solicitation 1232SA26Q1000 is a combined synopsis and request for quotation issued by the USDA ARS for the supply and installation of an evaporative cooling system at Building 5, Greenhouse 2 in Stoneville, Mississippi. This firm-fixed-price acquisition is a total small business set-aside under NAICS code 238210. The scope of work involves the removal and disposal of eight existing cooling pads and four submersible pumps, followed by the installation of eight new Acme Kool-Cel evaporative cellulose cross-fluted cooling pads and eight Munters Aerotech Vortex VX24F1CT side wall fans across four plant rooms. The project requires a completion timeline of 90 days from the notice to proceed and mandates the submission of a site-specific safety and accident prevention plan within seven days of the award. The government will award the contract based on the lowest price technically acceptable criteria, evaluating the lowest priced offer for technical acceptability and past performance. To be considered responsive, offerors must provide detailed pricing, a completed self-performance and subcontracting disclosure checklist, and specific representations and certifications. All quotations are due by September 15, 2026, at 1300 CT. Key compliance requirements include adherence to FAR 52.219-14 limitations on subcontracting, SAM registration, and the provision of a contract-specific QA/QC plan. Contractors are responsible for incorporating any applicable state taxes into their pricing, as the government will not provide equitable adjustments for such costs.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 18 hours ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS