Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on January 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SUBASE Kings Bay Car Wash Equipment Replacement

Closed
NAVMWR-25-Q-0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811192
New
SLED
Pre-Qualification: Guadalupe Light Rail Vehicle Wash Improvements
Solicitation # C25134F
The Santa Clara Valley Transportation Authority is soliciting pre-qualifications for Contract C25134F, the Guadalupe Light Rail Vehicle Wash Improvements project. This project involves the removal and replacement of the existing light rail vehicle wash system at Building F of the Guadalupe Division with a new hybrid drive-through and gantry wash system. The scope of work includes the installation of industrial wash equipment, programmable controls, a water reclamation and filtration system, a new foundation and prefabricated canopy, and necessary electrical and plumbing upgrades. The estimated construction cost for the project is between 4.5 million and 5.5 million dollars. To be eligible for the subsequent Invitation for Bid, bidders must be approved through a pre-qualification process by submitting a Statement of Qualifications and a completed qualification questionnaire via the OpenGov portal. The final deadline for pre-qualification submissions is November 16, 2026, at 2:00 pm PT. Minimum eligibility requires a valid California contractor's license with at least 10 years of experience as a Class A (General Contractor) or Class B (General Building) classification. Bidders must also provide proof of bonding capacity, maintain liability insurance of at least 1 million dollars per occurrence and 2 million dollars aggregate, and ensure all entities in a joint venture are separately pre-qualified. Evaluation is based on a scoring matrix and interviews, with a minimum total score of 55 points required to avoid disqualification. Because the work occurs in an active light rail environment, the selected contractor must comply with VTA safety and operating procedures and coordinate closely to minimize operational impacts. Additionally, the contractor and all subcontractors must be registered with the California Department of Industrial Relations and comply with prevailing wage and apprenticeship requirements.
Engineering and Program Delivery

POSTED

1 day ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The contract involves the complete removal and replacement of a four-bay self-service car wash system at SUBASE Kings Bay, requiring comprehensive site investigation, including utility locates and sub-surface utility "pot holing," coordinated with installation personnel. The contractor is responsible for providing all necessary materials, equipment, fixtures, and accessories to ensure a fully operational facility, including handling, staging, delivery, and disposal of waste materials. Demolition work entails removing existing equipment, signage, and accessories while retaining all code-compliant elements, followed by the installation of a new self-service multi-pressure car wash system with specified functions such as tire cleaning, presoak, high-pressure soap, wax, rinse, foam brushes, and spot-free rinses. The contractor must supply and install new pressure booms, foam conditioner booms, accessories, control meters with coin and credit card options compatible with the existing NAYAX payment system, and a weatherproof vending machine for supplies. Additionally, the work includes installing a bill changer, signage graphics, and ensuring the protection of existing structures during construction, with subsequent repairs and restoration as needed. The contractor is also tasked with providing warranties for at least one year, delivering an operations and maintenance manual, and training staff on system care and maintenance. Site inspection is required prior to work commencement, and all activities must adhere to established standards, with the contractor responsible for site cleanup and waste disposal throughout the project.

General Info

Replace car wash system at SUBASE Kings Bay, ensuring compliance and warranty.

NAICS

811192 - Car Washes

Place of Performance

Kings Bay, GA, 31547, USA

Set-Aside

NONE

Documents

2

NAVMWR-25-Q-0018 Amendment 0001 - Carwash Equipment Replacement

PDF, High priority: read this firstamendment
High

NAVMWR-25-Q-0018 Request for Quotation

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Commander Navy Installations Command
Contacts1 person available
OfficeMILLINGTON, TN, 38055-6500, USA
Office AddressMILLINGTON, TN, 38055-6500, USA

Full Description

Show more
The Contractor shall provide all services, including materials, labor and installation required for the complete removal and replacement of a four (4) bay self-service car wash system located at SUBASE Kings Bay. Work shall include but is not limited to the following: 1. Site Investigation: The Contractor shall provide and perform all necessary site investigation and utility locates (including, but not limited to, sub-surface utility - pot holing) as required to complete the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Point of Contact (POC). 2. Materials: The Contractor shall provide all materials, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. 3. Disposal: The Contractor is responsible for the disposal of all waste materials generated as part of this project and shall remove all waste and equipment to an offsite area. All and laydown area will be designated for the new equipment and disposal containers. Also, the Contractor shall clean up the work site daily to the satisfaction of the POC. 4. Demolition: The Contractor shall remove all materials not required for the operation of the proposed systems within all four (4) existing car wash bays and supporting spaces, while retaining all code required items. The existing Self-Service Multi-Pressure Car Wash system including water hoses and plumbing lines, all existing bay controls and meters, and all existing 360 degree and 180 degree pressure booms. The Contractor shall remove the existing bill changer and dispose of as stated above. The Contractor shall also remove and dispose of all existing operational wall signage, and all wall accessories typical for all four (4) bays. 5. Renovation: The Contractor shall furnish install a new Self-Service Multi-Pressure Car Wash System. The new Self-Service Car Wash System shall include all new hoses and plumbing lines to support the new system. The system shall include the minimum of the following functions: Tire Cleaner Presoak High Pressure Soap Wax Rinse Spot-Free Rinse Bug Off Foam Brush Foam Conditioner 6. The Contractor shall provide all the chemicals and detergents for the duration of start-up testing and inspections to ensure the Self-Service Car Wash System is fully operational. 7. The Contractor shall furnish and install four (4) new 360-degree Pressure Spray Wand Booms and any attachments needed to connect to the existing system supply piping within each wash bay as required. The Contactor shall install four (4) new 180- degree Foam Conditioner Booms and any attachments needed to connect to the existing system supply piping within each wash bay as required. 8. Renovation: The Contractor shall furnish and install in all four (4) bays the following accessories: Foam Brush Buckets High Pressure Wand Holders Bay Hooks Matt Clamps Menu Board and Operational Signage 9. Renovation: The Contractor shall furnish and install four (4) new Self-Serve Car Wash POS Control Meters. The new Bay Control Meters shall have a coin and credit card option. The individual credit card reader must be compatible with NAYAX payment and management system. The Contractor shall insure that the Point of Sale (POS) system is compatible with the Installation Morale Welfare and Recreation (MWR) department's existing NAYAX system. The Government will provide 3rd party encryption and process separately from this contract. 10. Renovation: The Contractor shall install a new weatherproof electrical vending machine that will be compatible with the same payment option as line item ten (10) above. The vending machine options shall include items such as: Towels Wipes Protectants Shines Cleaners Deodorizers Air Fresheners 11. The Contractor shall furnish and install a new bill changer matching existing unit configurations at the same location as existing. 12. Renovation: The Contractor shall install all new equipment and related accessories, as per manufacturer's installation guidelines. If the Contractor is quoting an - equal to the listed product herein, the Contractor shall submit complete specifications on the - equal product with the response to this RFQ. The specifications will be reviewed by the POC and Contracting Officer (KO) for possible use on this project. 13. Submittal: The Contractor shall submit a Signage Graphics package to the POC for approval fifteen (15) days prior to fabrication. All new merchandising and operational signage must comply with the MWR Brand Standards. 14. Preservation: The Contractor shall protect existing adjacent materials, especially wall and floor surfaces, from any and all damage during the work, by utilizing walk pads, construction screens and other industry best practices protection methods. 15. Restoration: The Contractor shall repair and/or replace all facility elements impacted and/or damaged by work, to the satisfaction of the POC. The Contractor shall patch, paint and/or otherwise restore all building materials, including but not limited to, wall and floor surfaces damaged by work; to the satisfaction of the POC. 16. Warranties: The Contractor shall provide a warranty on all materials i.e chemicals and detergents/equipment and labor for a period of one (1) year, or longer if standard for materials/equipment, from the date of acceptance by the KO. The Contractor shall refer to Section H and I for additional information regarding warranties and extended warranties. 17. The Contractor shall provide an Operations and Maintenance (O&M) Manual to the POC and KO, as instructed. Also, the Contractor shall provide instruction and training to the POC, MWR facility staff and PWD representatives on the care and maintenance of all installed equipment and systems, using the O&M Manual as the training basis. Site Inspection The Contractor shall examine the site and determine for themselves the existing conditions and general character of the site. Claims for additional costs due to conditions that could have been verified by site investigation will not be authorized. Contractor shall contact the POC to schedule the Site Inspection.

More opportunities from Department Of Defense → Commander Navy Installations Command

Same awarding agency

NAICS: 339920
New
Federal
Monterey Golf Range Technology
Solicitation # NAVMWR-27-R-0001
Solicitation NAVMWR-27-R-0001 is a design-build project for the renovation and expansion of the Monterey Golf Driving Range at NSA Monterey. The project aims to meet increased customer demand by repairing existing bays and adding 12 new hitting bays via a two-story hitting deck. The scope of work includes complete architectural and engineering designs for all civil, structural, electrical, and mechanical elements, the installation of a golf range technology system for ball flight tracking and interactive virtual golf, the construction of a 250 square foot range maintenance building, a chain-link fence evaluation, and the installation of three surveillance cameras. All work must comply with federal, state, and local codes, including the Uniform Federal Accessibility Standards Architectural Barriers Act. The contract will be awarded based on a best-value tradeoff between technical factors and price, with price weighted approximately equal to technical evaluations. Technical evaluation focuses on the proposed design solution, qualifications and experience, and the project execution method. Proposals must be submitted in two separate volumes, Technical and Price, by December 15, 2026. Key requirements include the appointment of a Chief of Construction Quality Control with at least 10 years of experience, the provision of payment and performance bonds by the prime contractor, and adherence to Davis-Bacon Act wage determinations. The government will retain 10 percent of all payments until final inspection and the delivery of all closeout documentation.
Sporting and Athletic Goods Manufacturing

POSTED

6 days ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS