Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on December 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCGC James Steering Actuator Overhaul

Closed
70Z08526Q0001476Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
DIBBS
TRAINING SET, FIRE FIGH
Solicitation # SPE8E6-27-T-0421
Solicitation SPE8E6-27-T-0421 is a fixed-price procurement by the Defense Logistics Agency for 39 kits of Fire Fighting and Damage Control training sets, identified by NSN 6930-01-585-8179. The contract is designated as a Service-Disabled Veteran-Owned Small Business Set-Aside, though some sections of the documentation contain conflicting notes regarding small business status. Key delivery requirements include a 76-day delivery window after award, with a need ship date of October 9, 2026, and an original required delivery date of March 30, 2027. Shipping is FOB Origin, with the destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contractor must adhere to strict packaging and marking standards, specifically MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Palletization must comply with DLA requirement RP001. Special material restrictions are in place, prohibiting the intentional addition of mercury or mercury-containing compounds, except where functionally required and specified by NAVSEA. The contract incorporates various federal regulations, including the Buy American and Balance of Payments Program, safeguarding of covered defense information, and hazardous material labeling per 29 CFR 1910.1200. Inspection and acceptance will occur at the destination, and all invoicing must be processed electronically through the Wide Area WorkFlow system.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 336611
New
DIBBS
LAMINATED CONDUCTO
Solicitation # SPE7M2-27-T-0463
Solicitation SPE7M2-27-T-0463 is a small business set-aside issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 13 units of Laminated Conducto, identified by NSN 6145-01-524-6075. The requirement is classified under NAICS code 336611. Key delivery milestones include a need ship date of April 26, 2027, and an original required delivery date of January 5, 2028, with a delivery lead time of 167 days after receipt of order. Shipping is designated as FOB Origin, with the destination for both inspection and acceptance being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements found in the DLA Master List, specifically referencing RA001, RC001, RP001, and RQ011. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow RP001. A critical environmental restriction prohibits the intentional addition of mercury or mercury-containing compounds to the hardware, except for specific functional exceptions. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment. The solicitation incorporates various FAR and DFARS clauses covering cybersecurity, the Buy American Act, and the prohibition of covered defense telecommunications equipment.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 336611
New
DIBBS
LADDER, EXTENSION
Solicitation # SPE8E9-27-T-0349
Solicitation SPE8E9-27-T-0349, issued by the Department of Defense DLA Troop Support Construction and Equipment MRO SVC I, is for the procurement of one extension ladder under NSN 5440-01-537-4071. The delivery is required within 167 days after receipt of order, with a need ship date of April 26, 2027, and a final delivery date of September 24, 2027. The item is to be delivered to the DLA Distribution Depot at Hill AFB, Utah. All quotes must be submitted via the DLA Internet Bid Board System by November 9, 2026. The contract mandates strict adherence to quality and packaging standards, requiring compliance with ASTM D3951 for packaging, MIL-STD-129 for marking, and MIL-STD-130N for identification. Manufacturers must maintain an inspection system complying with SAE AS9003 or ISO 9001. Inspection and acceptance will occur at the origin. Due to the nature of the technical data, eligible offerors must possess an approved US/Canada Joint Certification Program certification and approval from the DLA controlling authority to access export-controlled data subject to ITAR or EAR regulations. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. The procurement is subject to various federal regulations, including the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Evaluation for award may include a HUBZone price evaluation preference, and offerors must certify their small business status and compliance with prohibitions on covered defense telecommunications equipment.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 336611
New
Federal
Fuel Injection Pump Overhaul
Solicitation # N5005427Q0016
Solicitation N5005427Q0016 is a combined synopsis and solicitation for the overhaul of 32 LPD-17 class MPDE Fuel Injection Pumps for the USS San Antonio. The Department of Defense, through the Mid Atlantic Regional Maintenance Center in Norfolk, Virginia, intends to award this contract on a sole source basis to Fairbanks Morse under the authority of FAR 13.106-1(b)(1)(i). The work must be performed at the OEM facility in accordance with OEM procedures and the MPDE maintenance handbook, including joint inspections of disassembled components and a final receipt inspection upon return to the SIMA Diesel shop. The period of performance is scheduled from November 9, 2026, to November 30, 2026, with delivery to MARMC in Norfolk, Virginia. This procurement is conducted using Simplified Acquisition Procedures for commercial items under FAR Part 13 and FAR 12.6. Interested parties must be registered in the System for Award Management and submit quotes via email to the primary point of contact by November 2, 2026. Required quote elements include pricing, business size, payment terms, and a demonstration of technical capability to meet all specifications. The contract incorporates various federal and defense clauses, including Buy American certifications, cybersecurity requirements under DFARS 252.204-7012, and FOB Destination shipping terms.
Mid Atlantic Reg Maintenance Ctr

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
Federal
U.S. NAVY VESSEL VOYAGE REPAIR AVAILABILITY (VRA)
Solicitation # N6817127QN004
Solicitation N6817127QN004 is a Request for Quotation issued by NAVSUP Fleet Logistics Center Sigonella, Site Naples, for a Vessel Voyage Repair Availability (VRA) for the USNS T Whitney (LCC 20) in Gaeta, Italy. The scope of work includes 10 Category A work items and 3 Not Separately Priced (NSP) items, focusing on hull and structural steel repairs, communication and navigation calibration, auxiliary machinery piping and hose hydrostatic testing, HVAC duct repairs, and habitability outfitting. The period of performance is scheduled from December 1, 2026, through December 15, 2026. This is a Firm-Fixed-Price contract that is not set aside for small businesses. Award will be granted based on the Lowest Price Technically Acceptable (LPTA) criteria, requiring offerors to be rated as acceptable in technical capability before price evaluation. Key technical requirements include providing proof of an ISO9001 or 14001 Quality Management System, ABS welding certifications for mild carbon steel, and the use of a certified Marine Chemist or Industrial Hygienist for gas free certifications. Amendment 0001 specifically clarifies that costs for asbestos removal and disposal for the fire room LP drain piping repairs must be excluded from initial bids and will instead be handled via Condition Found Reports and Change Orders. Invoicing must be processed electronically through Wide Area Work Flow (WAWF).
Navsup Flc Sigonella Naples Office

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
Federal
USCGC TERRELL HORNE – SEWAGE PIPING RENEWAL
Solicitation # 52000QR270000255
The United States Coast Guard Surface Force Logistics Center is soliciting quotations for sewage piping repairs aboard the CGC Terrell Horne, located in San Pedro, California. This total small business set-aside is issued as a combined synopsis and solicitation under RFQ 52000QR270000255, utilizing simplified acquisition procedures in accordance with FAR Part 13. The project requires the contractor to provide all personnel, equipment, and materials to perform the renewal of damaged piping and associated work in Space 3-3-0-E (Forward AUX), specifically involving the welding of pipe sections and flanges between CHT-V-3-5-6 and CHT-V-3-5-5. All work must adhere to SFLC Standard Specification 0740 and ASTM B725 and B467 standards, utilizing gas-shielded tungsten-arc welding to ensure zero visible leakage during operational pressure testing. The period of performance is scheduled from December 1 to December 11, 2026. Award will be made on a firm-fixed-price basis to the responsible contractor offering the best value, with a primary focus on the lowest aggregate price among responsive offerors. Interested vendors must have an active registration in the System for Award Management (SAM) and submit a detailed quotation on company letterhead, including a full cost breakdown, unit costs, and warranty information. Quotations are due no later than 11 November 2026 at 10:00 AM Eastern Standard Time and should be submitted via email to the designated procurement officials.
CG-SEA-C21

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is soliciting proposals for a comprehensive propulsion repower and helm system integration for a 30 foot Munson Packman landing craft. The project requires a factory-certified Honda Marine Authorized Dealer to decommission and remove two existing Honda BF250A outboard engines and replace them with new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing the removal of legacy rigging, a structural assessment of the transom, installation of new engines and Honda iST electronic control heads at dual helm stations, integration with the existing SeaStar PA1315-2 Power Assist steering and NMEA 2000 network, and a complete fuel system overhaul using USCG Type A1-15 lines. The project concludes with static diagnostics and a minimum two-hour sea trial to validate performance and safety protocols. The selected contractor must provide a secure facility for vessel storage and adhere to strict insurance requirements, including at least 1 million dollars in commercial general liability and business auto liability. Financial protections include a 25 percent retainage or a performance bond, with a bond being mandatory for contracts exceeding 100,000 dollars. Proposals are due by November 13, 2026, and will be evaluated based on a 100-point scale considering technical capability and budget, with specific preferences given to responsible Indian Offerors under TERO and tribal preference laws. All disputes are subject to the jurisdiction of the Colville Tribal Court, and payments are contingent upon the availability of tribal funds.
Confederated Tribes of the Colville Reservation

POSTED

about 17 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract involves a comprehensive overhaul of the starboard steering actuator system aboard the USCGC James, with a focus on restoring operational readiness in accordance with Coast Guard standards and OEM procedures. The scope includes disassembly, inspection, and renewal of critical components such as piston seals, bearings, and O-rings, as well as hydraulic system cleaning, fluid sampling, and refilling with specified cleanliness standards. The contractor is required to provide OEM-authorized technical representatives to oversee disassembly, repair, and reassembly, ensuring strict adherence to manufacturer procedures. Rigging plans must be submitted for approval, and all work must be performed with meticulous contamination control, including the use of protective measures and maintaining hydraulic fluid cleanliness per MIL-STD-419 and ISO 4406 standards. Operational testing before and after repairs is mandated, with the contractor responsible for verifying rudder movement, indicator accuracy within ±2 degrees, and relief valve settings, all under Coast Guard supervision. Performance will be inspected and accepted at the vessel’s location in North Charleston, South Carolina, within a scheduled period from January 5 to January 15, 2026. The work includes renewing filters and strainers, inspecting hydraulic manifolds and valves, and carefully handling the rudder support system, including visual pad eye inspections and limited lifting to prevent damage. The contract emphasizes safety, environmental protection, and strict compliance with technical and preservation standards, with all fluids disposed of according to regulations. The procurement is set aside for small businesses under NAICS code 336611, with an estimated total value of approximately $26,000 based on parts costs. The contractor must certify compliance with small business set-aside requirements and provide necessary certifications and resumes for OEM-authorized technicians, ensuring the work meets the rigorous operational and safety standards established by the Coast Guard.

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

North Charleston, SC, 29405, USA

Set-Aside

SBA

Documents

1

56100 Steering Actuator Overhaul Statement of Work

PDF, High priority: read this first7 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA

Full Description

Show more

56100_TAB_0125_753


  1. ITEM 1: Steering Actuator, Overhaul

1.  SCOPE


1.1 Intent.  This work item describes the requirements for the Contractor to overhaul the rotary vane steering actuator assembly for the Starboard steering system.


1.2 Government-furnished property.  All parts are onboard JAMES.




MTI


ITEM DESCRIPTION


NSN/PN




QTY


ESTIMATED COST
($/UNIT)


N


Actuator Overhaul Kit


NSN: 2530-01-699-0680


PN: RRM000445315


1 ea.


24,000


N


Hydraulic Coupling Kit


NSN: 2530-01-699-0654


PN: RRM000444570


1 ea.


2,000


2.  REFERENCES


Coast Guard Drawings


Coast Guard Drawing 750-WMSL_100_44, Rev K, Unit 3320 Struct - Inner Bottom 2nd Deck FR 89-98 (ASC100332)


Coast Guard Drawing 750-WMSL-243-003, Rev B, Shipping & Unshipping of Propulsion Shafting (ASC243004)


Coast Guard Drawing 750-WMSL-556-004, Rev E, Steering Gear Hydraulic Diagram (ASC556003)


Coast Guard Drawing 750-WMSL-556-022, Rev H, Steering Gear and Stern Gate Hydraulic Piping - Unit 3330 (ASC556333-HY)


Coast Guard Drawing 750-WMSL-561-001, Rev D, Steering Gear Foundation (ASC561001)


Coast Guard Drawing 750-WMSL-562-002, Rev C, Rudder (ASC562002)


Coast Guard Drawing 750-WMSL-562-003, Rev D, Rudder Support System (ASC562003)


Coast Guard Publications


Coast Guard Technical Publication (TP) 7182A, SWBS 561, Jan 2022, Steering Machinery Subsystem – Operation & Maintenance Manual


Coast Guard Technical Publication (TP) 7193, SWBS 561, Jan 2022, Steering System Operations and Maintenance Manual


Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements


Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes


Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test


Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems


Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures


Other References


International Standard Organization (ISO) 4406, 2021, Hydraulic Fluid Power - Fluids - Method for Coding Level of Contamination by Solid Particles


Kongsberg Maintenance Manual DMN000278736, Rev C, Kongsberg Steering Gear Type SR and SV


MIL-STD-419, Sept 2021, Cleaning and Protecting Piping Tubing, And Fittings for Hydraulic Power Transmission Equipment


3.  REQUIREMENTS


3.1 General.


3.1.1 CIR. None.


3.1.2 Tech Rep.  The Contractor must provide the services of Tech Reps in accordance with the following subparagraphs.


3.1.2.1 The Contractor must provide the services of an OEM authorized/ licensed Tech Rep for the Kongsberg steering actuator to accomplish the following on site:


  • Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system.
  • Assist with proper repair methods and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.
  • Perform all actual repair work on the actuator.

3.1.2.1.1 Ensure the Tech Rep is an OEM Certified Representative for the system/equipment stated above and demonstrated on their résumé.


3.1.2.2 Tech Rep.  The Contractor must provide the services of a Qualified Technical Representative who is familiar with the WMSL Steering System Hydraulic Power Units to accomplish the following on site:


  • Advice on manufacturer's proprietary system information.
  • Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system as applicable.

3.1.2.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their résumé.


3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).


3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000.


3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000.


3.1.3.3 Maintain the strictest standards of cleanliness in accordance with MIL-STD-419 while hydraulic system is open.  Work on the steering hydraulics is not permitted while any blasting, grinding, welding, etc. is being performed in, or adjacent to, the steering gear space.


3.1.3.4 Hatch opening must be covered and roped off to prevent a falling hazard to personnel when not in use.


NOTE


Plastic bags may be used only when arrangement or configuration prevents the use of the other sealing methods specified above.


3.1.4 Interferences.  The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:


  • Access plate (BERP) located above the starboard steering actuator.
  • Piping
  • Electrical wires
  • Padeye plate covers
  • Rudder support covers
  • Hydraulic Oil (approx. 560 gals.)
  • Overhead
  • Ventilation Ducts
  • Insulation
  • Pipe hangers/brackets
  • Divers needed to rig and support rudder 

3.1.5 Rigging of tools and materials.  The Contractor shall propose a rigging plan to the Coast Guard inspector for approval. The Contractor is advised to follow the equipment removal plan shown in CG Drawing 750-WMSL-101-27  


3.1.5.1 The Contractor is responsible for all rigging operations for all materials and equipment needed to accomplish this work item.  


3.1.5.2 The Contractor must provide all rigging equipment.  


NOTE


Coast Guard personnel will operate all shipboard machinery and equipment.


3.2 Operational test, initial.   Prior to commencement of work, the Contractor must, under the direction of the OEM Tech Rep, witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition.


3.2.1 Verify that all rudder angle indicators (manual indicator on actuator, MCMS indicator, local indicator, and remote indicators on bridge) must be within a 2-degree tolerance throughout range of motion.


WARNING


Special care should be taken not to hold the rudder hard over for more than a few seconds at a time to avoid overheating the system.


3.2.2 Starboard Steering Gear: In the presence of the Coast Guard inspector, place the 1A HPU online, with the controller set to ‘REMOTE’, cycle the rudder from Zero to Port (hard-over), from Port to Starboard (hard-over), from Starboard to Port (hard-over) and from Port to Zero. On the Port to Starboard and Starboard to Port transitions, record the time from 30 degrees on one side to 30 degrees on the other side (speed should be 3 degrees/second or 20 (+/-1) seconds total). With the rudder at Zero degrees and the HPU running, inspect all hoses, fittings and seals for leakage.


3.2.3 Set the steering controller to “LOCAL”. Using the pushbuttons operators on the pump, cycle the rudder from Zero to 15 degrees Port, from 15 degrees Port to 15 degrees Starboard and from 15 degrees Starboard to Zero. It is not necessary to record times on this evolution – this portion of the test only demonstrates that local control can be achieved. Record the result as SAT or UNSAT.


3.2.4 Switch to 1B HPU and perform the same tests to complete the Starboard Steering Gear System test.


Note


The Cutter is currently outfitted with recessed padeyes as located on CG Drawings 750-WMSL_100_44 and 750-WMSL-243-003 and are in place in the hull above each propeller and rudder. Padeye numbers are 22, 23, 24, and 25 as identified on Coast Guard Drawing 750-WMSL-243-003.


Access covers for the recessed padeyes are not required to be reinstalled.


Each rudder weighs approximately 12,000 lbs.


3.3 Rudder support.  In the presence of the Coast Guard inspector and the Tech Rep, The Contractor must rig (for lift and support) the rudder in place to allow repairs of the steering actuator assembly. Support pad eyes are shown on CG Dwg 750-WMSL-114-004 (sheet 13, items 22 thru 25).  


NOTE 


The pad eye covers may have been previously removed. Pad eye covers will not be reinstalled.  


3.3.1 Contractor must open access to use the internal pad eyes. Do not use torch.  


3.3.2 The Contractor must visually inspect each of the existing pad eyes. Pad eyes have a capacity of 12 M. Tons per Submit a CFR if inspection reveals any damage to pad eyes, or if any additional pad eyes are required. Upon reinstallation of the actuator, the Contractor must remove all installed rudder support rigging. 



WARNING 


DO NOT lift the rudder and rudder stock assembly more than 0.062”. Lifting the rudder stock more than 0.062” may result in damage to rudder stock seal and or water leaks  



3.3.3 In the presence of the Tech Rep and the Coast Guard inspector, the Contractor must use dial indicator positioned above and adjusted to measure all upward movement of rudder post. Ensure rudder post is supported by rigging and chains but not lifted more than minimum amount necessary to verify that rigging is holding rudder/rudder post assembly, (approximately 0.010”). Do Not Exceed 0.062”.  


3.4 Hydraulic reservoir inspection.  The Contractor must take oil samples for testing of existing oil from each reservoir and send out for analysis. Label and retain one extra oil sample from each system for back-up testing if necessary.  Drain all 2135 TH hydraulic oil from the HPU actuators and reservoirs (approximately 550 gallons total), and dispose of in accordance with all state, local and federal regulations. Provide CFR with test results. For steering gear hydraulic system details, see Coast Guard Drawings 750-WMSL-556-004 and 750-WMSL-556-022.


Note 


The system cleanliness requirement for the hydraulic oil: ISO 4406 cleanliness code of 17/14 or better and moisture content of less than 500 ppm. 


3.4.1 Remove access covers from reservoirs and storage tanks.  Take samples of any heavy sludge or particulate matter in the tanks.  Remove all sludge and debris and wipe down with lint free rags.  If any metallic debris (metal filings, shavings, babbitt) is present, notify the Coast Guard Inspector immediately.


3.4.2 When all tanks are thoroughly clean, and just prior to closure ensure all foreign objects have been removed (e.g. rags, caps, towels, plugs). Contractor must present these areas to the Coast Guard Inspector, then close in the presence of the Coast guard inspector. Install new gaskets.


WARNING 


Foreign materials present a high risk of severe damage to the steering gear system. Extra precautions are required to ensure cleanliness of the hydraulic system. 


3.5 Steering actuator disassembly and inspection.  The Contractor must, under the direction of or performed by the OEM Tech Rep support, overhaul the port steering actuators in accordance with OEM procedures.  Rudder foundation, rudder stock, and rudder support system are shown on CG Dwgs 750-WMSL-561-001 and 750-WMSL-562-003. At a minimum, the Contractor must renew the following parts:


  • Piston Seals
  • HP Seals and Backing Strips
  • LP Seals
  • Bearing Shells
  • O-rings
  • Top and Bottom Actuator Seals

3.5.1 Collect and dispose of all drained fluids in accordance with all federal, state, and local regulations. 


3.5.2 Prior to disassembly, wipe down the exterior of the actuator assembly and the general area near the actuator to remove dirt and contaminants.  Maintain a clean environment when working around open hydraulic equipment. 


3.5.3 Actuator internal inspection.  Inspect the interior of the actuators (including, but not limited to, the piston, piston dividers, upper and lower housings, hydraulic coupling, rotor, and rudder stock) for any indications of wear or damage. 


3.5.4 During final installation of the actuator, ensure the rudder and rudder stool are aligned, and the actuator and helm are set at 0 degrees.


Note


Suction strainers are located inside the service tanks.


3.6 Filters and strainers, renew. The Contractor must renew the return, charge, and servo filters on each of the Starboard HPU’s.  Close up filter housing and torque fasteners in accordance with Chapter 5.3 of CG Tech Pub 7182A. Renew the suction strainers and reservoir filter breather on each HPU.


3.7 Manifold and valve inspection and testing. The Contractor must clean, inspect and test the hydraulic manifold and valves (i.e. control, relief, and locking valves) for the starboard system. Clean and visually inspect all parts for defects, deterioration, dirt, scale, rust, grease, and foreign material.



NOTE


Hydraulic hoses life is 12 years.


3.9 Hydraulic oil refilling. The Contractor must refill the reservoirs with hydraulic oil per MIL-H-17672, symbol 2135, in accordance with CG Tech Pub 7182A.  The Contractor must filter new hydraulic oil in accordance with SFLC Std Spec 5000, paragraph C2.1.2 prior to entry into the Cutter’s tanks or system. Cleanliness of oil must be ISO 4406 Cleanliness Code of 17/14 or better.


NOTE


Coast Guard personnel will operate all shipboard machinery and equipment.


3.10 Operational test, post repairs. After completion of work and in the presence of the Coast Guard Inspector, the Contractor must thoroughly test and demonstrate the equipment listed below to be in satisfactory operating condition.


WARNING  


Special care should be taken not to hold the rudder hard over for more than a few seconds at a time to avoid overheating the system.  


3.10.1 Verify that the rudders operate throughout their full range with no indications of binding and appear smooth during operation.


3.10.2 All rudder angle indicators (manual indicator on actuator, MCMS indicator, local indicator, and remote indicators on bridge) must be within a 2-degree tolerance throughout range of motion.


3.10.3 The Contractor must perform the initial startup procedures in accordance with Coast Guard TP 7182, Paragraph 7-2. Upon completion, verify that the relief valves are properly set in accordance with Table 3.


TABLE 3 – relief valves


sERVICE DESCRIPTION


Set Point (PSIG)


Pump Main System Relief Valve


1530 ± 25


Relief Valve (Charge)


217 ± 25


Relief Valve (Servo)


1450 ± 25


Cross-line Relief Valve


1580 ± 25


3.10.4 Starting with the Starboard Steering Gear, and in the presence of the Coast Guard inspector, place the 1A HPU online, with the controller set to ‘REMOTE’, cycle the rudder from Zero to Port (hard-over), from Port to Starboard (hard-over), from Starboard to Port (hard-over) and from Port to Zero.  On the Port to Starboard and Starboard to Port transitions, record the time from 30 degrees on one side to 30 degrees on the other side (speed should be 3 degrees/second or 20 (+/-1) seconds total). With the rudder at Zero degrees and the HPU running, inspect all hoses, fittings and seals for leakage. 


3.10.5 Set the steering controller to “LOCAL”.  Using the pushbuttons operators on the pump, cycle the rudder from Zero to 15 degrees Port, from 15 degrees Port to 15 degrees Starboard and from 15 degrees Starboard to Zero.  It is not necessary to record times on this evolution – this portion of the test only demonstrates that local control can be achieved.  Record the result as SAT or UNSAT.


3.10.6 Switch to 1B HPU and perform the same tests to complete the Starboard Steering Gear System test.


3.10.7 The Contractor must perform the Internal Leakage Test per paragraph 7.10 of the Kongsberg Maintenance Manual DMN000278736 for the port actuators. Measure the total leakage during each separate segment of testing (Port to Starboard hard-over, hard-over Starboard, Starboard to Port hard-over, and hard-over Port).


3.11 Oil sample analysis. The Contractor must take oil samples for testing of existing oil from each reservoir and send out for analysis to demonstrate cleanliness has been maintained.


3.12 Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)


4.0 Place of performance- CGC JAMES FLETC Base Charleston


1050 Register St. North Charleston SC 29405 ATTN CGC James. 


5.0 Period of performance- 05 JAN26 – 15JAN26 as availability and contractor can schedule with technicians for repair.


6.0 Points of Contact.  USCG-SFLC-LRE PL Asset Management: CWO Matthew Temple, contact@example.gov, +1 (555) 000-0000

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS