Wastewater Treatment Plant Pavement Rehabilitation Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Wastewater Treatment Plant Pavement Rehabilitation Project, managed by the Donner Summit Public Utility District in California, involves the restoration of approximately 21,000 square feet of asphalt concrete pavement. The scope of work includes cold planing the existing surface to a depth of 2 inches and applying a 2-inch overlay of fiber-reinforced hot mix asphalt. Additionally, the project requires targeted repairs up to a maximum depth of 4 inches across approximately 500 square feet of limited locations to benefit district customers. This project is currently listed as a forecast with a posted date of August 14, 2026. Performance will take place in California, specifically within the 95728 zip code area. Steven Palmer, the General Manager, serves as the primary point of contact for this initiative.
General Info
Agency
NAICS
Place of Performance
Sherritt Lane and Donner Pass Road, CA, 95728Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
