This Solicitation opportunity from Department Of Veterans Affairs was posted on June 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Z2DA--Replace Dual Duct Boxes on Second Floor - 539-21-201
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The project involves replacing dual duct mixing boxes on the second floor of the Veterans Affairs Medical Center in Cincinnati, Ohio, under Project Number 539-21-201, with solicitation number 36C25026B0042. The work is strictly limited to the occupied hospital space and requires detailed phasing to minimize disruption to operations, with all corridor-related abatement and construction activities scheduled exclusively between 8 PM Friday and 6 AM Monday. The contractor must handle asbestos-containing materials identified in white-painted plaster walls containing 480 ppm of lead and manage ACM removal strictly in conjunction with mechanical demolition as outlined in the attached survey reports and specifications. Lead-based paint and asbestos abatement require full compliance with OSHA, EPA, and DOT regulations, including proper packaging, labeling, and decontamination procedures, with all waste handled in accordance with documented protocols. The site has no designated laydown or parking areas, and contractors must plan logistics independently while coordinating dumpster placement with the Contracting Officer’s Representative. All construction, electrical, mechanical, and controls work must adhere to VA-developed technical specifications, including BACnet protocol compliance for gateways, FM or UL-certified materials, and NRTL-labeled equipment. The contract mandates the use of Procore software for management and expects a Level 5 finish on new wall coverings, with paint as an acceptable replacement for specified wallpaper. The contractor must submit a detailed cost schedule after notice to proceed, including prorated insurance and system testing values for components like fire alarms, nurse call systems, and switchgear, with progress payments based on VA Form 10-6001a and AIA G702/G703 documentation. Awards will go to the lowest responsible offeror, with bids evaluated solely on aggregate cost, and must include an SF 24 bid bond and certification on subcontracting limitations. Performance is required within 365 days of notice to proceed, with final inspection requiring a joint pre-survey and comprehensive cleaning. All personnel must comply with VA security standards, including background investigations equal to VA employees handling sensitive information, and those with access to protected health information must sign a Business Associate Agreement. SAM and DSBS registration is mandatory, and only electronic bids accepted by June 11, 2026, at 1:00 PM EDT will be considered, with payment processed electronically through VA’s systems compliant with X12 EDI standards.
General Info
Agency
Contract Value
$1,104,400NAICS
Place of Performance
OHSet-Aside
Awardee
Award Issued Date
Timeline
Submission Closed
Organization & Contact Information
Full Description
QUESTIONS AND ANSWERS : RFI #1 Question: spec 01 00 00 lay down and dumpster area: Where will the laydown and dumpsters area be located?
Answer: There is no guarantee of laydown space, contractors shall plan accordingly to support their material. Yes, power is available. Dumpster location will be coordinated with COR. RFI #2 Question: Parking: How many parking spaces will be provided?
Answer: Per specification 010000 section: 1.5F2. There will be no parking by any contractors on the VA campus
RFI #3 Question: spec 01 35 26 SSHO: Can the superintendent be dual-hatted and fulfill the role of SSHO?
Answer: Yes, the superintendent and SSHO can perform both roles
RFI #4 Question: spec 02 83 33.13 LBP: Can the government please identify the location and quantities of LBP (lead-based paint) remediation?
Answer: The samples tested pertained to painted plaster (white) walls. The analytical results indicated that the white-painted plaster walls contain 480 parts per million (ppm) of lead. If white painted plaster walls are Impacted by the project, contractors should be aware and take the appropriate precautions to comply with OSHA regulations and VA project specifications see lead paint report attached.
RFI #5 Question: Procore software: Will the government accept the use of Procore construction management software?
Answer: Yes.
RFI #6 Question: Life safety drawings: Can the government please provide life safety drawing showing existing smoke and fire walls within the project boundaries?
Answer: Existing smoke and fire walls are shown on the drawings. No changes in the safety plan see attached life safety plan.
RFI #7 Question: spec 02 82 11 asbestos abatement 1.1.2 extent of work: Is all the ACM removal associated with the mechanical demo? I.E. no abatement is expected to remove mastic etc. on duct, pipe boxes that are not shown for removal.
Answer: Yes, the abatement scope is associated with the mechanical demo- see mechanical drawings - see attachment.
RFI #8 Question: spec 02 82 11 asbestos abatement 1.1.2 extent of work material locations table: Where is Corridor A-2-15 located?
Answer: Contractor to bid quantities for removal. Corridor is C*2*3. Also, corridor A-2-15 is to the north. RFI #9 Question: spec 02 82 11 3.2 removal of ACM/phasing: As the specs call for critical barriers, an attached 3-stage decontamination unit, drop cloths beneath the work, and negative pressure requirements of this specification for any level of abatement. Would the Government allow the phasing for the abatement to include "owning" both sides of the corridors (closed to traffic) for the abatement in the corridors?
Answer: All work within corridors shall occur during weekends, between 8PM Friday and 6AM Monday. The corridors shall be opened for normal operations outside of these hours. It is permissible to own both sides (closing traffic) during weekend work. Coordinate with COR.
RFI #10 Question: Drawing 1-A001 detail 16 and note 2: 1) Note 2 calls for new wall covering. Does the VA have attic stock to match? If not, can we paint, or please provide the wallpaper manufacturer series and color? 2) detail 16 labels room as C242 is this mislabeled and should be A242?
Answer: Paint is an acceptable finish coordinate with COR to match attic stock; the contractor is to provide a level 5 finish from corner to corner. Detail 16 label is mislabeled and should be A242.
More opportunities from Department Of Veterans Affairs → 250-NETWORK Contract Office 10 (36C250)
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS