Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

(21298697) Repair Egress Deficiencies, B455, PSNS

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project, managed by Navfac Northwest for the Department of the Navy, involves repairing life safety egress deficiencies at building B455 in PSNS. The scope of work focuses on the first and second floors between columns 8 and 10, requiring the installation of code-compliant egress pathways and stairways. This process includes the demolition of existing interior stairs, doors, and windows, followed by the installation of new interior and exterior stairways, fire-rated doors, glazing, walls, and necessary fire protection infrastructure. The project is categorized under NAICS code 236220 and is currently listed as a forecast. To ensure minimal disruption to facility functions, the work must be phased to allow for continuing operations within the affected area. This effort is linked to several related HDAs and ESAMS records to ensure coordination across the various project requirements.

General Info

Navfac Northwest will repair life safety egress deficiencies at PSNS building B455.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Northwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope: Install code compliant egress pathways and stairways to address current life safety deficiencies on 1st and 2nd floor, between columns 8 – 10, B455. Work shall include demo of existing interior stairways, doors, windows, etc. Installation to include interior/exterior stairways, fire rated doors, glazing, walls, and associated fire protection infrastructure. Work shall be phased to allow for continuing operations in the area. HDAs 20191144 RAC 3and 20191145 RAC 3 relate. ESAMS 498174 RAC 3 and 660446 RAC 3 relate.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the work includes a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The estimated cost for the project is between 10 million and 25 million dollars, with a performance period of 730 days after award. The contract will be awarded based on the lowest price, with proposals requiring pricing for two specific exhibit line items: building renovation and paving removal and replacement. Bidders must adhere to the Davis-Bacon Act and Buy American statute requirements. Bonding requirements vary by proposal value, with those 150 thousand dollars and greater requiring bid, payment, and performance bonds. Administrative requirements include submitting monthly invoices via Wide Area Work Flow and following a three-phase quality control process. Final acceptance is contingent upon a series of inspections, including a pre-final punch list and a final acceptance inspection conducted by the Contracting Officer and government representatives.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses all site preparations and improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator, fire protection, plumbing, mechanical, electrical, sitework, and crane services. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the November 30, 2026 deadline.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of its North Wing dormitory in Troutdale, Oregon. The project focuses on restoring water-damaged areas to safe residential use, including sixteen residential rooms and bathrooms, mechanical rooms, utility rooms, and common areas. The scope of work involves drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The project is scheduled to run from February 1, 2024, to March 31, 2024, and requires the contractor to maintain fire resistance and equipment clearances throughout the process. Proposals must include detailed relevant experience, a comprehensive description of proposed work methods, and itemized pricing by room and trade that remains firm for 60 days. The project is subject to the Davis-Bacon Act under wage determination OR20260100, requiring weekly certified payrolls. Awardees must provide payment and performance bonding for the full project value, along with proof of general liability and worker's compensation insurance, within ten days of award. Final acceptance by Career Systems Development Corporation is contingent upon successful system testing, correction of deficiencies, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Department Of The Navy → Navfac Northwest

Same awarding agency

NAICS: 236220
Federal
MSR #23207821_1787796 -- (23207821) Repair Crane Track and Tunnel Arch Support DD1, PSNSThis project involves comprehensive seismic upgrades to the superstructure and substructure of a facility managed by Navfac Northwest, specifically focusing on the repair of crane tracks and tunnel arch support. The scope of work includes retrofitting building brace connections, modifying restrooms for American Barrier Act compliance, and updating heating and ventilation systems. Additionally, the project requires the removal and reinstallation of various architectural, electrical, and mechanical interferences, including plant equipment, shop tools, and storage racks. Electrical upgrades will be implemented to install a 480VAC three-phase grounded system and correct documented HDA safety hazard deficiencies across RAC 2, 3, and 4 categories. All work must comply with the Unified Facility Code, National Fire Protection Association, and International Building Code, while prioritizing energy efficiency and low life cycle costs. Because the machine shop is on the historical register, all modifications require review and concurrence from the State Historical Preservation Office to maintain the building's historical integrity. Station support will be provided through red badge escorts, outage coordination, hazardous material handling assistance, and a facility production process specialist to ensure seamless project execution.
Commercial and Institutional Building Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS