830-010-358-01 | Upgrade HVAC Systems & Life Safety Updates - Natural Resources & Education Bldgs
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The University of Illinois is seeking a professional consultant team for solicitation 830-010-358-01 to perform comprehensive HVAC and life safety upgrades for the Natural Resources Building 109 and the Education Building 160 at the Urbana-Champaign campus. The project focuses on replacing aging, inefficient mechanical systems, including make-up air units, fume hood exhaust systems, and hydronic components, while upgrading electrical systems, lighting, and building envelopes to prevent moisture infiltration. Additional requirements include asbestos abatement, the installation of digital climate controls, and the modernization of fire alarms and sprinkler systems. The total estimated project cost is 79,560,000 dollars, with an appropriated amount of 72,000,000 dollars, though 7,560,000 dollars is reserved for owner costs and is unavailable for design and construction. The selected team must provide full professional services from conceptualization through construction and demonstrate expertise in sustainable, historic, and public sector projects. All work must adhere to University Facilities Standards, the Illinois Stretch Energy Code, and the Illinois Climate Action Plan goals, specifically following the LEED Silver Certification Process. Due to the nature of the buildings, the State Historical Preservation Office must be consulted throughout all project phases. The consultant is also responsible for identifying and applying for utility incentives and energy grants. To meet socioeconomic goals, the team must include both MBE and WBE firms. Professional liability insurance of 5,000,000 dollars is required, and the project is designated under fee classification II R.
General Info
Agency
Place of Performance
IL, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The Natural Resource Building HVAC systems are aging, inefficient, and costly to maintain. The chiller and make-up- air units, which were designed to operate the laboratory fume hood mechanical ventilation system, have ceased to operate. The scope of work includes, but is not limited to the following: - Replacement of multiple make-up air units and associated systems, including upgraded controls to meet safety and compliance requirements for continued use. - Fume hood exhaust system upgrade to meet safety and compliance requirements. - Electrical upgrades as needed to support the HVAC replacements and any electrical wiring or components discovered to be in disrepair. Connection to the Illinois chilled water loop and associated components. - Abate asbestos as required through making the upgrades to the other systems, including proper asbestos abatement barriers during construction to allow for the building to remain occupied. - Upgrade building life safety systems, including sprinklers and fire alarms. - Replace ceilings, walls, and floors in areas of construction for HVAC and sprinkler systems. - Upgrade lighting and lighting controls to meet current standards and support the HVAC and life safety replacements. - Repair and replace windows, ballasted roof, related tuckpointing, and any portions of the building envelope that allow air or moisture infiltration. The Education Building HVAC systems are aging, inefficient, and costly to maintain. Many of the heating components are obsolete and leaking. Many of Education Building's components are either original or several decades old. The scope of work includes, but is not limited to the following:
- Upgrade HVAC system to improve air flow via new controls and abandonment of the aging, leaking hydronic system, upgrade to digital climate control thermostats, and complete energy enhancements. Including the replacement of any structural components to support the new system. - Replace damaged interior glazing from attempts to solve the HVAC circulation issues and address circulation issues. - Upgrade lighting and lighting controls to meet current standards and support HVAC upgrades - Abate asbestos as required through making the upgrades to the other systems, including proper asbestos abatement barriers during construction to allow for the building to remain occupied. - Upgrade building life safety systems, including sprinklers and fire alarms. - Repair and replace failing roofing membrane primarily, but not limited to, balconies and the roof, including gutter systems and any portions of the building envelope that allow air or moisture infiltration. - Repair and replace deteriorating pre-cast panels to address present and future safety concerns. - Replace exterior windows in select areas and any portions of the building envelope that allow air or moisture infiltration. Work at both buildings must reflect the University's Facilities Standards and comply with current building codes and Illinois Climate Action Plan (iCAP) goals, which follow the LEED Silver Certification Process. The interventions shall be
sensitive to the era and designs of both buildings. This project will be required to submit a LEED checklist to the university and comply with the Illinois Stretch Energy Code. The selected consultant team will provide full professional services, including a conceptualization phase to identify scope to fit within the budget provided, design, documentation, and construction phase services, and should demonstrate experience with technically complex, sustainable, historic, and public sector projects. $7,560,000 of the total project cost is for University of Illinois Owner's Costs and are not available for design and construction.
The State Historical Preservation Office should be consulted during every phase of this project.
The A/E shall assess the project for eligibility under applicable utility incentive programs, energy grants, rebates, and other funding opportunities. The A/E shall identify all qualifying programs and shall prepare, coordinate, and submit all required applications, calculations, supporting documentation, and related materials necessary to obtain available incentives for the project. The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. The A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesigning the project should the bids received exceed project funding. The following A/E goals are applicable to the A/E team:
Similar Contracts
Same NAICS industry code
More opportunities from University of Illinois
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
