Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

American River Common Features, 2016 Flood Risk Management Project, Sacramento, California

Forecast
A4462State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The American River Common Features 2016 Flood Risk Management Project, identified by solicitation number A4794, is a comprehensive effort to reduce flood risk in Sacramento, California, by addressing slope stability, seepage, and erosion along the levees of the American and Sacramento Rivers. Managed by the Central Valley Flood Protection Board and the California State Lands Commission, the project involves design refinements to the authorized 2016 ARCF Project. Key technical components include the Magpie Creek Project, the installation of a Piezometer Network, and various erosion contracts, specifically American River Erosion Contracts 3B North, 3B South, 4A, and 4B, as well as Sacramento River Erosion Contract 3. The scope also encompasses the American River and Sacramento River mitigation sites, with specific work including approximately 1,700 linear feet of bank protection along the Sacramento River east levee. The project is governed by strict environmental and land-use regulations, requiring compliance with the California Environmental Quality Act (CEQA) through the certification of Environmental Impact Reports and the adoption of Mitigation Monitoring and Reporting Programs. To facilitate these works on sovereign land, the California State Lands Commission has approved a 49-year General Lease for public agency use, extending through June 22, 2075. The project's execution involves engineering design modifications, footprint expansions, and compensatory habitat mitigation to ensure the stability of the levee systems and the protection of the surrounding watershed.

General Info

Flood risk project in Sacramento improving levee stability through engineering and environmental mitigation.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A

Full Description

Show more
The Flood Risk Management Project consists of design refinements to the authorized 2016 ARCF Project, including engineering design modifications, footprint expansions, and compensatory habitat mitigation approaches. The design refinements include: Magpie Creek Project; American River Erosion Contracts 3B North, 3B South, 4A, and 4B; Sacramento River Erosion Contract 3; American River Mitigation Site; Sacramento River Mitigation Site, and installation of a Piezometer Network.

Similar Contracts

Same NAICS industry code

NAICS: 541713
Grant
AFRL/AFOSR-Taiwan NSTC Frontiers in Materials and Nanostructures: AI-Driven Discovery, Quantum Geometry, and Energy-Efficient Information Technologies 2027-2030
Solicitation # FA955027S0002
The US Air Force-Taiwan Nanoscience Program, sponsored by the Air Force Office of Scientific Research (AFOSR) and Taiwan’s National Science and Technology Council (NSTC), is a three-year collaborative grant program running from approximately October 2027 to October 2030. The program focuses on Frontiers in Materials and Nanostructures, specifically targeting AI-driven materials discovery, quantum geometry, and energy-efficient information technologies. It requires the formation of joint research teams consisting of one investigator from a US institution or DoD Lab and one from a Taiwan institution. Funding for selected US Principal Investigators is capped at $150,000 per year, with a total program funding pool of $3,600,000 for the selected set of US projects. The application process is a two-phase competition. Eligible teams must first submit a joint pre-proposal white paper by November 18, followed by a full proposal for selected teams due by February 19, 2027. All submissions must be made electronically via Grants.gov using the SF 424 (R&R) form family. Evaluation is based on a weight of scientific evidence approach, prioritizing technical merits, potential for breakthrough results, and the quality of collaboration between the US and Taiwan investigators. Strict security requirements are in place, including mandatory Research Security Training for all covered individuals, SAM registration, and a risk-based security review prior to award. Payments are processed electronically through the Wide Area Workflow (WAWF) application.
Air Force Office Of Scientific Research

POSTED

27 days ago

DEADLINE

in 3 months
View Details
NAICS: 541713
Federal
STATE OF THE ART (SOTA) MICROELECTRONICS (ME) ADOPTION BROAD AGENCY ANNOUNCEMENT (BAA) FULL TEXT GENERAL ANNOUNCEMENT
Solicitation # 26S1358
The U.S. Department of the Air Force, through SAF/AQC, is issuing a Broad Agency Announcement (BAA) numbered 26-S-1358 to advance the adoption of state-of-the-art microelectronics across national security missions. This BAA does not solicit proposals directly but serves as an umbrella framework for future Topic Calls published on SAM.gov and the Classified IC-ARC, which will define specific technical requirements, submission deadlines, and evaluation criteria. The initiative focuses on accelerating the development and integration of trusted, assured microelectronics technologies, particularly those leveraging Intel 18A process nodes and advanced packaging via Secure Enclave, to ensure enduring technological superiority. Five key mission areas are highlighted: advanced secure microelectronics design and production; next-generation assembly, packaging, and test; novel microelectronics for disruptive capabilities; advanced test, validation, and mission qualification; and building an accessible, affordable, and sustainable domestic microelectronics ecosystem. Topics range from AI/ML architectures and radiation-hardened designs to chiplet-based systems, secure test methodologies, edge computing, RF electronics, PNT resilience, digital twins, and open-standard chiplet libraries. Proposals or White Papers may only be submitted in response to individual Topic Calls, which may be either closed (with fixed deadlines) or open (accepting submissions continuously during a defined window), and may follow one-step or two-step processes. Awards, if made, will take the form of procurement contracts or Other Transaction Agreements (OTAs) for prototyping, follow-on production, or experimental purposes, with eligibility open to small businesses, traditional and non-traditional defense contractors, and research institutions. OTA awards require resource-sharing commitments and participation by nontraditional contractors, small businesses, or third-party funding. Proposals must not include classified information unless explicitly directed by a classified Topic Call, which may require SECRET or higher clearances and approved secure facilities. Data rights are anticipated to include Government Purpose Rights for technical data and software, with specific terms negotiated per call. All submissions must reference the BAA number 26-S-1358 and be aligned with the specified Areas of Interest in each Topic Call. Interested parties must actively monitor SAM.gov and IC-ARC for updates, as Topic Calls may be issued throughout the BAA’s open period—initially one year, extendable annually—and any associated costs for proposal development are considered indirect, not chargeable to resulting contracts.
Department Of The Air Force

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541713
Federal
ERIS Shopping Notice: High Duty Cycle High Energy Lasers (HEL) for SWaP-Constrained Systems
Solicitation # DARPA-SN-26-82
The Defense Advanced Research Projects Agency (DARPA) Strategic Technologies Office (STO) has issued Shopping Notice DARPA-SN-26-82 to identify innovative, awardable solutions for moderate power high-energy lasers (HEL) ranging from 100W to 20kW. These systems must be designed for SWaP-constrained environments, such as Collaborative Combat Aircraft and Stryker vehicles, with a primary focus on achieving high duty cycles to allow for successive firing over long durations. Key technical requirements include the development of scalable system architectures, novel cooling and heat exhaust solutions to maintain beam coherence, wavelength flexibility, and phase control capabilities for beam tuning. This is an active search with submissions reviewed on a rolling basis from June 4, 2026, through November 30, 2026, and the government may make awards prior to the closing date. Interested parties must submit a video solution through the DARPAConnect ERIS Portal and notify the Marketplace Coordinator via email. Evaluations will be based on the proposer's understanding of the current state of the art, the technical leap provided by the innovation, the team's combined expertise in laser technology, and the potential impact on both defense and commercial applications. There is no specified set-aside status for this opportunity.
Defense Advanced Research Projects Agcy

POSTED

6 months ago

DEADLINE

in 7 days
View Details

More opportunities from California → Central Valley Flood Protection Board

Same awarding agency

NAICS: 237990
SLED
Natomas Cross Canal Berm and Channel Enhancements Project
Solicitation # 2022010387
The Natomas Cross Canal Berm and Channel Enhancements Project, managed by the Central Valley Flood Protection Board, involves critical infrastructure improvements on the right bank of the Natomas Cross Canal in Sutter County, California. The scope of work focuses on the replacement and enhancement of pump platforms, intake pipes, and the installation of fish screens. Key deliverables include the removal of existing pump platforms and support piles to be replaced with new steel pump platforms and catwalks, the reinstallation of existing pumps, and the replacement of 36-inch and 24-inch intake pipes. Specifically, the project requires the installation of a new pump intake structure and fish screen at the intake end of the existing 24-inch irrigation pipe. This project is identified under solicitation number 2022010387 and falls under NAICS code 237990. It is governed by several permits, including Permit No. 19699, and has been granted categorical exemptions from the California Environmental Quality Act under Sections 15301, 15302, and 15303 of the California Code of Regulations. These exemptions are based on the project involving the maintenance of existing facilities, replacement of structures at the same site with similar capacity, and the construction of small structures with negligible expansion of use. Primary points of contact for the project include Angela Nguyen-Tan of the Central Valley Flood Protection Board and Steve Willey.
Other Heavy and Civil Engineering Construction

POSTED

6 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Chowchilla Subbasin Groundwater Recharge Project 1 (Streambed Alteration Agreement No. EPIMS-MAD-40478-R4)
Solicitation # 19790
The Chowchilla Subbasin Groundwater Recharge Project, managed by the Central Valley Flood Protection Board and Madera County, involves the construction of flow diversion structures to facilitate groundwater recharge and mitigate drought conditions in Madera County, California. Specifically, the project includes the construction of the Clayton and Haynes structures along the Eastside Bypass levees. The scope of work entails the installation of rubber gasket reinforced concrete pipe conveyance pipelines, 14-foot diameter fish screens, concrete cutoff walls, and reinforced concrete control and pump boxes. The Haynes structure is located approximately 14 miles southwest of Chowchilla near the junction of Lincoln Road and Avenue 20. Under solicitation number 19789 and associated permits, the project is designated as exempt from the California Environmental Quality Act (CEQA) pursuant to Executive Order N-7-22 and relevant Public Resources Code sections due to its role in emergency drought response. Administrative oversight is provided by Project Manager Stephanie Anagnoson of Madera County and Senior Environmental Scientist Jennifer Calles of the Central Valley Flood Protection Board. The project is classified under NAICS code 237990 for other heavy engineering projects.
Other Heavy and Civil Engineering Construction

POSTED

11 months ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS