Electric Vehicle Supply Equipment Project at Chowchilla
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Electric Vehicle Supply Equipment Project at Chowchilla entails the installation of underground electrical infrastructure to support a future fleet of electric vehicles, including the embedding of conduits, fixed bollards, wheel stops, and new electrical wiring to deliver power from an existing on-site source. Although the actual charging stations are not part of this scope, the project will prepare the site with all necessary electrical and physical groundwork to facilitate future installation of two single-port and eighteen dual-port pedestal-mounted EVCS units. Thirty-eight parking stalls will be marked with dedicated stenciling and restriping, accompanied by clear signage designating them for electric vehicle use only, ensuring proper allocation and usage. All construction activities—such as pavement saw cutting, trenching, backfilling, and surface restoration—will be carried out to return the lot to its original condition, with strict adherence to all applicable laws, regulations, and waste disposal requirements. The work is being managed by the California Department of Corrections and Rehabilitation, with primary contact Peter J. Connelly, Jr., Section Chief, and is located at the facility in Chowchilla, California, with a posted date of July 21, 2026.
General Info
Agency
NAICS
Place of Performance
21633 Avenue 24, Chowchilla, CA, 93610Set-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
