Electric Vehicle Supply Equipment Project at Chowchilla

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Electric Vehicle Supply Equipment Project at Chowchilla entails the installation of underground electrical infrastructure to support a future fleet of electric vehicles, including the embedding of conduits, fixed bollards, wheel stops, and new electrical wiring to deliver power from an existing on-site source. Although the actual charging stations are not part of this scope, the project will prepare the site with all necessary electrical and physical groundwork to facilitate future installation of two single-port and eighteen dual-port pedestal-mounted EVCS units. Thirty-eight parking stalls will be marked with dedicated stenciling and restriping, accompanied by clear signage designating them for electric vehicle use only, ensuring proper allocation and usage. All construction activities—such as pavement saw cutting, trenching, backfilling, and surface restoration—will be carried out to return the lot to its original condition, with strict adherence to all applicable laws, regulations, and waste disposal requirements. The work is being managed by the California Department of Corrections and Rehabilitation, with primary contact Peter J. Connelly, Jr., Section Chief, and is located at the facility in Chowchilla, California, with a posted date of July 21, 2026.

General Info

Install underground electrical infrastructure for 38 EV parking stalls at Chowchilla facility, preparing for future charging stations.

Agency

California Corrections and Rehabilitation, Department of

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

21633 Avenue 24, Chowchilla, CA, 93610

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Corrections and Rehabilitation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Corrections and Rehabilitation, Department of
Office AddressN/A
Contacts
Peter J. Connelly JrSection Chief

Full Description

Show more
The project consists of installing the Electric Vehicle Supply Equipment (EVSE) infrastructure for fleet use. This initiative is designed to create a fully operational system that will eventually support two single ports and 18 dual ports, pedestal-mounted Electric Vehicle Charging Stations (EVCS). Note that the installation of the EVCS themselves is outside our current scope and may be handled by others at a later date. As part of this project, 38 parking stalls will be specially stenciled and restriped. Clear signage will be installed to indicate that these stalls are reserved for electric vehicle use, ensuring easy identification and proper use. The project involves the installation of buried conduits, fixed bollards, wheel stops, and new electrical equipment, including all necessary wiring, to deliver a complete and functional system. Electrical power for the EVSE will be drawn from an existing source already available at the site. All aspects of the work, including waste disposal, will be conducted in strict compliance with all applicable laws, regulations, and ordinances. The work will involve pavement saw cutting, trenching, backfilling, and restoring the affected lot surface to its original condition once the installation is complete.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Keystone Power Outage Repairs
Solicitation # keystone-power-outage-repairs
The Keystone Power Outage Repairs solicitation seeks a contractor to perform electrical infrastructure restoration at the Keystone Red Rock Job Corps Center in Drums, Pennsylvania. The scope of work involves repairing three damaged poles, specifically poles 35, 43, and 45. Technical requirements include the installation of one 100 kva and two 50 kva transformers on pole 45, one 100 kva transformer on pole 43, and one 75 kva transformer on pole 35. Additionally, the contractor must install new polymer cutouts and 10kv lightning arresters on poles 35 and 43, establish new service drops to buildings from all three poles, install a new secondary quadplex for the main trunk line, and handle the demolition and disposal of old secondary cabling. Final deliverables include verified voltage and proper rotation in the buildings. This opportunity is set aside for small businesses, including SDB, WOSB, HUBZone, VOSB, and SDVOSB certifications, under NAICS code 237130. Bidders must be registered and active in SAM.gov and are required to separate labor and materials on their bids. The project is subject to Davis-Bacon wage standards, and the contractor must provide certified payroll. The solicitation was posted on September 5, 2026, with a response deadline of September 9, 2026. Primary contact for this effort is Jennie Drumheller.
Adams & Associates Keystone Red Rock Job Corps

POSTED

about 12 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237130
New
SLED
CONTRACT : 26-333577; PHASE V COMMUNICATION FACILITIES REPLACEMENT: GROUP A ;CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION (CALFIRE);HUMBOLDT & SHASTA COUNTIES, CALIFORNIA
Solicitation # 0000040277
The State of California Department of General Services is soliciting bids for Contract 26-333577, Project No. 1512A, 1512B, and 1512E, regarding the Phase V Communication Facilities Replacement for the California Department of Forestry and Fire Protection (CALFIRE). The project involves the replacement of communication facilities at three sites: Pratt Mountain, Bunchgrass Mountain, and Mt. Pierce, located in Humboldt and Shasta Counties. The scope of work includes demolition, excavation, structural steel, fencing, cast-in-place concrete, CMU block wall vault construction, panelboards, switchgear, generators, and tower erection. The state has estimated the project cost at 20,739,900.00 dollars with a project term of 991 calendar days. Eligible bidders must hold a Class A or B license and attend mandatory pre-bid site inspection tours on September 16 and 17, 2026. Sealed bids are due by 2:00 PM on September 30, 2026, with a public bid opening scheduled for October 1, 2026. Awardees must provide payment and performance bonds totaling 100 percent of the contract price and submit Certificates of Reported Compliance for any fleet vehicles subject to California Air Resources Board regulations. The contractor is also responsible for adhering to all federal, state, and local health and safety mandates, with all associated costs being the responsibility of the contractor.
California Department of General Services

POSTED

1 day ago

DEADLINE

in 25 days
View Details
NAICS: 237130
New
Federal
SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANA
Solicitation # W9128F26SM024
The U.S. Army Corps of Engineers Omaha District has issued a Sources Sought announcement for the Sentinel Utility Corridor project at Malmstrom Air Force Base, Montana. This market research initiative seeks industry feedback to inform the acquisition strategy for constructing critical utility and communications infrastructure to support the Ground Based Strategic Deterrent system. The project involves the construction of utility corridors spanning approximately 1,750 to 2,225 miles, connecting missile field launch facilities, launch centers, and the Wing Command Center. The scope includes underground communications installation, civil work, site restoration, and various crossings of roadways, railways, and rivers. The estimated magnitude for this project is between $1.4 billion and $2.0 billion, with a projected completion date around 2035. The government intends to utilize a Progressive Design-Build (PDB) approach through an Other Transaction Authority (OTA) agreement under 10 U.S.C. § 2808a. This procurement method is designed to offer commercial agility and shared risk through a collaborative process outside of standard Federal Acquisition Regulation oversight. Interested parties are encouraged to participate in a virtual Industry Day scheduled for September 4, 2026, and must submit responses via an online questionnaire by the revised deadline of September 24, 2026. Respondents should provide company information, including CAGE codes or UEIs, and may submit an optional capability statement not exceeding 12 pages. The project is categorized under NAICS code 237130, with a small business size standard of $45 million.
W071 Endist Omaha

POSTED

1 day ago

DEADLINE

in 19 days
View Details