Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Ventura 1 - Frontier Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Frontier plans to deploy fiber-optic broadband infrastructure in the cities of Santa Paula and Ojai, California, extending along State Route 150 from just north of Santa Paula to Ojai, utilizing existing utility corridors to minimize environmental and community disruption. The project will employ a mixture of aerial installations, primarily through overlashing onto existing poles, and targeted underground conduit placement, with no new overhead structures proposed. Underground work will be limited to localized hand trenching and minimal horizontal directional drilling, confined strictly to existing rights-of-way and previously disturbed areas to reduce new ground disturbance. Construction activities, including conduit placement and handhole installation, will focus on graded road shoulders and adjacent disturbed surfaces, with efforts to restore surfaces to their original condition. The project is forecasted under the California Public Utilities Commission, with Andrew Chan serving as the CEQA Project Manager for regulatory coordination.

General Info

Frontier deploys fiber-optic broadband along SR-150 in Santa Paula and Ojai using existing corridors, aerial and limited underground methods.

Agency

California Public Utilities Commission

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Public Utilities Commission
Contacts1 person available
OfficeN/A
Organization / Agency
California Public Utilities Commission
Office AddressN/A
Contacts
Andrew ChanCEQA Project Manager

Full Description

Show more
Frontier proposes fiber-optic installation to provide improved broadband connectivity within the cities of Santa Paula and Ojai, in Ventura County, California. The proposed route begins just north of the City of Santa Paula and extends generally along State Route 150 (SR-150) to the City of Ojai. The current design follows existing utility pathways (i.e., where communications and/or other utility infrastructure is currently present) and proposes to install fiber using a combination of existing infrastructure including aerial installations (i.e., overlashing) and underground conduit installation. As currently designed, the route is primarily aerial, and no new overhead utility structures are proposed, although Frontier expects to underground some facilities. Given the nature of infrastructure projects, the mix of aerial vs. underground installation methods is subject to change up to and including through construction. Where underground installation is required, Frontier intends to utilize localized hand trenching and very limited horizontal directional drilling (HDD). Frontier expects new infrastructure to be installed within existing rights-of-way (ROW) and authorized utility easements in areas where previous ground-disturbance activities have occurred. Where ground disturbing activities are planned, they are expected to include placing conduit, installing handholes, and minor surface restoration. Frontier intends to use existing access routes to minimize disturbance and to limit work areas to graded road shoulders and other reasonably adjacent disturbed surfaces, to the extent practicable, to minimize new ground disturbance

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Keystone Power Outage Repairs
Solicitation # keystone-power-outage-repairs
The Keystone Power Outage Repairs solicitation seeks a contractor to perform electrical infrastructure restoration at the Keystone Red Rock Job Corps Center in Drums, Pennsylvania. The scope of work involves repairing three damaged poles, specifically poles 35, 43, and 45. Technical requirements include the installation of one 100 kva and two 50 kva transformers on pole 45, one 100 kva transformer on pole 43, and one 75 kva transformer on pole 35. Additionally, the contractor must install new polymer cutouts and 10kv lightning arresters on poles 35 and 43, establish new service drops to buildings from all three poles, install a new secondary quadplex for the main trunk line, and handle the demolition and disposal of old secondary cabling. Final deliverables include verified voltage and proper rotation in the buildings. This opportunity is set aside for small businesses, including SDB, WOSB, HUBZone, VOSB, and SDVOSB certifications, under NAICS code 237130. Bidders must be registered and active in SAM.gov and are required to separate labor and materials on their bids. The project is subject to Davis-Bacon wage standards, and the contractor must provide certified payroll. The solicitation was posted on September 5, 2026, with a response deadline of September 9, 2026. Primary contact for this effort is Jennie Drumheller.
Adams & Associates Keystone Red Rock Job Corps

POSTED

about 6 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237130
New
SLED
CONTRACT : 26-333577; PHASE V COMMUNICATION FACILITIES REPLACEMENT: GROUP A ;CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION (CALFIRE);HUMBOLDT & SHASTA COUNTIES, CALIFORNIA
Solicitation # 0000040277
The State of California Department of General Services is soliciting bids for Contract 26-333577, Project No. 1512A, 1512B, and 1512E, regarding the Phase V Communication Facilities Replacement for the California Department of Forestry and Fire Protection (CALFIRE). The project involves the replacement of communication facilities at three sites: Pratt Mountain, Bunchgrass Mountain, and Mt. Pierce, located in Humboldt and Shasta Counties. The scope of work includes demolition, excavation, structural steel, fencing, cast-in-place concrete, CMU block wall vault construction, panelboards, switchgear, generators, and tower erection. The state has estimated the project cost at 20,739,900.00 dollars with a project term of 991 calendar days. Eligible bidders must hold a Class A or B license and attend mandatory pre-bid site inspection tours on September 16 and 17, 2026. Sealed bids are due by 2:00 PM on September 30, 2026, with a public bid opening scheduled for October 1, 2026. Awardees must provide payment and performance bonds totaling 100 percent of the contract price and submit Certificates of Reported Compliance for any fleet vehicles subject to California Air Resources Board regulations. The contractor is also responsible for adhering to all federal, state, and local health and safety mandates, with all associated costs being the responsibility of the contractor.
California Department of General Services

POSTED

about 19 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237130
New
Federal
SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANA
Solicitation # W9128F26SM024
The U.S. Army Corps of Engineers Omaha District has issued a Sources Sought announcement for the Sentinel Utility Corridor project at Malmstrom Air Force Base, Montana. This market research initiative seeks industry feedback to inform the acquisition strategy for constructing critical utility and communications infrastructure to support the Ground Based Strategic Deterrent system. The project involves the construction of utility corridors spanning approximately 1,750 to 2,225 miles, connecting missile field launch facilities, launch centers, and the Wing Command Center. The scope includes underground communications installation, civil work, site restoration, and various crossings of roadways, railways, and rivers. The estimated magnitude for this project is between $1.4 billion and $2.0 billion, with a projected completion date around 2035. The government intends to utilize a Progressive Design-Build (PDB) approach through an Other Transaction Authority (OTA) agreement under 10 U.S.C. § 2808a. This procurement method is designed to offer commercial agility and shared risk through a collaborative process outside of standard Federal Acquisition Regulation oversight. Interested parties are encouraged to participate in a virtual Industry Day scheduled for September 4, 2026, and must submit responses via an online questionnaire by the revised deadline of September 24, 2026. Respondents should provide company information, including CAGE codes or UEIs, and may submit an optional capability statement not exceeding 12 pages. The project is categorized under NAICS code 237130, with a small business size standard of $45 million.
W071 Endist Omaha

POSTED

about 22 hours ago

DEADLINE

in 19 days
View Details