Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

inspection- electrical- living room

Active
164268State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Oklahoma → Choctaw Nation Housing AuthorityView Agency

NAICS

N/A

Place of Performance

Bennington, OK, 74723, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOklahoma → Choctaw Nation Housing Authority
Contacts3 people available
OfficeN/A
Organization / Agency
Oklahoma → Choctaw Nation Housing Authority
View Agency Profile
Office AddressN/A
Contacts
Choctaw Nation Housing Authority Procurement TeamProcurement Team
Jessica KelleyCase Manager
Rex HainesInspector

Full Description

Show more
inspection- electrical- living room vent in floor possible roof leak
Special Instructions: This will be a 3-bedroom mobile home 14x60 single wide 840 sq ft Case Manager Jessica Kelley 580-326-7521 Inspector- Rex Haines 580-317-3166
Special Instructions: All prospective contractors are required to visit the project site before submitting bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved.
Doors: Remove and replace 1 entry door at back side of home. Install 1 pre-hung six-panel insulated metal door. Install new combination, keyed alike hardware, Kwikset or comparable. Caulk and seal inside and out. Paint to match new or existing finishes.
Electrical: Check all electrical in home. Put all back to working order if needed and all to meet all I.R.C.CODES for 2019. Replacing any wall outlets, wall switches, over head lights and/or breakers if needed.
Site improvements: Re-level home and stabilize to prevent further movement. Install vinyl back around bottom side of home with what is there now. Replace only where may be needed to match.
Rough Carpentry: At front and back door of mobile home build a porch roof or awnings over doorways . Approx 5x5 roof ,4x4 post in concrete 2x6 framing 1/2 decking 15 pound felt with 26 gage metal for roof all out of treated materials.

More opportunities from Oklahoma → Choctaw Nation Housing Authority

Same awarding agency

NAICS: 236118
New
SLED
ASA shower and commode
Solicitation # 169041
The contract entails the complete renovation of a shower and commode area in a 4-bedroom, 2-bathroom brick home with a slab-on-grade foundation and shingle roof, totaling approximately 1800 square feet. All existing plumbing fixtures must be removed and replaced, including installation of a new low-entry shower base and surround made from Swan-Stone or an equivalent material with a minimum thickness of 1/4 inch; FRP is prohibited. The shower must include a Delta or comparable handle and mixing valve, two ADA-compliant adjustable grab bars, an adjustable handheld shower faucet with its own guide rod separate from the grab bars, and a portable shower seat. The existing toilet, which has a malfunctioning flush mechanism, must be replaced with a new ADA comfort height model along with a new wax ring, shut-off valve, and supply line. Necessary repairs to the drain or flange must be made to resolve the slow-flushing issue, while ensuring all other fixtures continue to drain properly. All associated drywall, trim, subflooring, finish flooring, and painting necessary to complete the work must be repaired or replaced. All work must comply with the 2019 International Residential Code and require all applicable licenses, permits, and line locates to be secured by the contractor. Prospective bidders are required to conduct a site visit prior to submission, and no change orders will be permitted for conditions that could have been observed during that visit. The contractor is responsible for accurate material measurements, full cleanup, removal of all debris, and restoration of the yard to mowing condition. Color selections for finishes are to be determined by the homeowner or property manager. The project is managed by the Choctaw Nation Housing Authority in Poteau, Oklahoma, with final bids due by August 11, 2026. Contact for inquiries is available through Case Manager Ferne Gunn or Inspector Kevin Mings, and all submissions must align with the solicitation number 169041.
Residential Remodelers

POSTED

2 days ago

DEADLINE

in 13 days
View Details