Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Interstate 215/McCall Boulevard Interchange Improvement Project

Forecast
1F700State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

McCall Boulevard at Encanto Drive and Bradley Way, Menifee, CA, 92586

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 8 - San Bernardino/Riverside
Contacts2 people available
OfficeN/A

Interested Companies (1)

Dokken EngineeringFolsom, CA

Full Description

Show more
The City of Menifee (City), in cooperation with the California Department of Transportation (Caltrans), proposes to reconstruct the Interstate 215 (I-215)/McCall Boulevard interchange and widen McCall Boulevard to address traffic congestion and delays associated with new and proposed developments. The limits of work for this project are along I-215 between post mile (PM) R20.1 and PM 21.5 and includes the widening of the existing overcrossing (OC) structure along McCall Boulevard over I-215, adding a bike/Neighborhood Electric Vehicle (NEV) lane on both sides of the road/bridge, adding sidewalk on the north side of the road/bridge, modifications of the associated on- and off-ramps, and improvements at the nearby intersections of McCall Boulevard/Bradley Road and McCall Boulevard/Encanto Drive. The McCall Boulevard OC, an east-west roadway, currently provides two traffic lanes in each direction and one left-turn lane at the ramp intersections. The Build Alternative proposes to keep the existing Type L-1 Tight Diamond interchange configuration, and widen McCall Boulevard, the I-215 overcrossing, and the I-215 ramps. The No Build Alternative proposes that no improvements be implemented on the mainline facility and the existing overcrossing would not be widened.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 23 days
View Details

More opportunities from California → Caltrans, District 8 - San Bernardino/Riverside

Same awarding agency

NAICS: 237310
SLED
I-40 Bridge and Rock Slope Protection Replacements
Solicitation # 1L800
The I-40 Bridge and Rock Slope Protection Replacements project, managed by Caltrans District 8, involves the restoration of rock slope protection at the Ardis Ditch, Tank Tower Ditch, and Homer Wash bridges, as well as the full replacement of the Woods Wash bridges. Located in San Bernardino County on Interstate 40 between Post Mile R104.6 and R120.5, the scope of work includes modifying drainage systems and streambeds at four specific locations. Key activities consist of removing existing vegetation and rock slope protection, constructing temporary access roads, and installing new partially-grouted rock slope protection. The project is subject to strict environmental compliance under the California Environmental Quality Act and the Lake and Streambed Alteration Agreement. Critical requirements include the development of a Lead Compliance Plan and a Traffic Management Plan, as well as adherence to NESHAP notifications for hazardous air pollutants. Significant biological protections are in place for the desert kit fox, requiring preconstruction surveys by a qualified biologist within 30 days of ground-breaking, the establishment of 200-foot non-disturbance buffers for natal dens from February to June, and immediate work stoppage if a fox is sighted on-site. The project has been certified as having no significant environmental effect following the completion of a Mitigated Negative Declaration.
Highway, Street, and Bridge Construction

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
SR-18 Pavement and Culvert Replacement Project
Solicitation # 08- 1L110/PN 0819000151
The California Department of Transportation (Caltrans), District 8 - San Bernardino/Riverside, is preparing to execute the SR-18 Pavement and Culvert Replacement Project along State Route 18 from Post Mile R17.8 to 31.7, spanning from just east of Route 138/18 separation to View Drive in Big Bear Lake, California. The project encompasses a comprehensive range of roadway improvements including cold planing and asphalt overlay, replacement of 14 culverts, guardrail and end treatment upgrades, installation of centerline rumble strips and recessed pavement markers, vegetation control, guardrail patina staining, asphalt concrete dike replacement, Transportation Management System elements, bicycle signage and obstruction markings, bicycle-friendly grates, drainage feature installation or replacement, embankment repair, sidewalk replacement, and installation of concrete barriers at bridge structures. The work is designed to extend pavement service life and enhance safety and mobility for all users, while strictly adhering to environmental regulations under CEQA and California state law. Construction activities are structured to avoid impacts on sensitive species, including the San Bernardino flying squirrel and American badger, with mandatory pre-construction biological surveys and seasonal work restrictions from June 1 to September 30 to protect nesting periods. Environmental compliance is central to the project’s execution, with specific contractual obligations tied to Standard Special Provisions (SSPs) that govern hazardous material handling, emissions reduction, and biological protection. Contractors must comply with SSPs addressing lead-containing paint and thermoplastic residue, asbestos notification, treated wood waste management, and non-hazardous earth material handling. Emissions reduction mandates require equipment to be properly maintained and certified under CARB regulations. Biological survey requirements, including identification and fencing of rare plant areas, must be completed within one week of construction commencement. While the project has a federal funding allocation of $4,224,000 from the Federal Transportation Improvement Program for FY 2025/26, no explicit contract type, pricing details, payment terms, invoicing procedures, or contracting officer details are provided. Submissions of public comments are due by August 31, 2026, via email or postal mail to the designated Caltrans point of contact, Malisa Lieng. The project is currently in a forecast stage with no formal solicitation number or binding contract documents yet issued, and all contractual obligations are centered on environmental stewardship and Caltrans-specific standards rather than standard federal acquisition clauses or procurement evaluation factors.
Highway, Street, and Bridge Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
SBD-18 Baldwin Lake Pavement Rehabilitation
Solicitation # 1L420
The SBD-18 Baldwin Lake Pavement Rehabilitation project, solicitation number 1L420, is managed by Caltrans District 8 and involves infrastructure and roadway improvements on State Route 18 in San Bernardino County. The scope of work is concentrated at 12 locations between Post Mile 56.2 and Post Mile 66.9. Key activities include road surface rehabilitation, shoulder widening, rumble strip installation, signage replacement, and guardrail system upgrades. Additionally, the project focuses on drainage and waterway modifications, including culvert repair, sleeve lining, the installation of headwalls and rock slope protection, and the concrete lining of the bed and banks at the Cushenberry Creek bridge crossing at postmile 66.9 to ensure hydraulic clearance standards are met. The project has received environmental clearance through the California Environmental Quality Act and the California Department of Fish and Wildlife under Streambed Alteration Agreement EPIMS-SBR-61425-R6. Notices of Determination dated June 2026 confirm that the project will not have a significant environmental effect. The work is categorized under NAICS code 237310 for highway, street, and bridge construction. Primary administrative oversight is provided by Adam Compton of Caltrans District 8, with environmental coordination involving the State Water Board and the Department of Fish and Wildlife.
Highway, Street, and Bridge Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Interstate 40 Minor Pavement Rehabilitation Project
Solicitation # 1M390
The Interstate 40 Minor Pavement Rehabilitation Project, solicitation number 1M390, is a Caltrans District 8 initiative focused on preserving and extending the service life of pavement in San Bernardino County, California. The scope of work includes pavement overlay, localized digouts, guardrail upgrades, culvert replacements, rock slope protection replacement, and traffic sign panel replacement. Additionally, the project involves installing new MGS connected to concrete barrier transitions at specific bridge locations, which may require asbestos testing. All activities are confined to the existing Caltrans right-of-way, and the project is expected to be completed within a 240-day construction period. The project is governed by a Mitigated Negative Declaration under CEQA, confirming no significant environmental impact provided specific mitigation measures are followed. Key requirements include strict adherence to Caltrans Standard Specifications for air pollution control, hazardous materials handling, and emissions reduction. Special environmental protocols are mandated, most notably the Desert Tortoise Protection Protocol, which requires an immediate work stoppage within 50 feet of any discovered tortoise and the implementation of a Worker Environmental Awareness Program. The California Highway Patrol has expressed concerns regarding public safety and traffic congestion due to commercial truck volume, necessitating diligent traffic control. Project administration is led by Kourtney Graves, and the project is subject to inspection and acceptance by the Caltrans Resident Engineer at the project site.
Highway, Street, and Bridge Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS