Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The California Department of Transportation, District 8, is undertaking a drainage and streambed modification project along State Route 18 in San Bernardino County, specifically between post miles 56.2 and 66.9, under Solicitation Number 1L420. The project involves work at twelve distinct locations to improve drainage infrastructure and roadway safety, including channel grading, removal and sleeve lining of existing culverts, replacement of rock slope protection with un-grouted RSP, installation of headwalls and cable railings, and concrete lining of channel beds and banks. Additional improvements encompass pavement rehabilitation, guardrail upgrades, rumble strip installation, signage replacement, and shoulder widening. The project is authorized under Fish and Game Code Section 1602 via a Lake and Streambed Alteration Agreement (EPIMS-SBR-61425-R6), issued by the California Department of Fish and Wildlife, and complies with the California Environmental Quality Act through a Mitigated Negative Declaration. Environmental compliance and final acceptance are overseen by CDFW, with Caltrans serving as the applicant and construction lead. No contract value, pricing structure, or detailed payment terms are disclosed, indicating the documentation reflects pre-award or forecast-level information. The period of performance, delivery schedule, and FOB terms are not specified. There are no identified contract clauses, evaluation factors, special requirements, or offeror certifications included in the available materials, and while key contacts are listed—Adam Compton of Caltrans and Chris Briggs of CDFW—their formal roles as COR, COTR, or PCO are not confirmed. The place of performance is clearly defined as SR-18 in San Bernardino County, and the project is tied to a June 2026 approval date, with environmental documentation accessible through CEQAnet. All work must adhere to applicable environmental regulations and hydraulic design standards, though no specific technical inspection criteria, quality standards, or packaging instructions are outlined. The absence of Section B, M, H, L, and K details suggests this is an early-stage forecast or planning document rather than a fully executed procurement contract.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code