Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

State Route 142 S-Curve

Forecast
1M780State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

SR-142 and Carriage Hill Lane to S-142 and Azurite Drive, Chino Hills, CA, 91709

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 8 - San Bernardino/Riverside
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Hannah BeardActing Environmental Program Manager

Full Description

Show more
Widen the highway S-curve between Carriage Hill Lane and Azurite Drive from Post Mile (PM) 2.2 to PM 2.5 on State Route 142 (SR-142) in the City of Chino Hills, in San Bernardino County. The scope of work includes widening of existing pavement, constructing retaining walls, replacing existing culverts, drainage improvements, and constructing guardrail as needed. Also included in the scope of work is removing existing street lighting and adding new lighting to improve visibility through the S-curve.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including land surveying, site photography, tunneling, boring, jacking, micro tunneling, and the installation of utilities, cathodic protection, and steel casing. Additional requirements encompass site preparation, shoring, subsurface investigation, SWPPP, asphalt paving, landscaping, and the supply of ready mix and precast concrete. The solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. A critical requirement is that responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
STP-011-2(046) VOLCANO RD REHAB, OSHIRO RD TO ALII KOA ST
Solicitation # B27000729
The Hawaii Department of Transportation is soliciting bids for the Volcano Road Rehabilitation project, spanning from Oshiro Road to Alii Koa Street in Lanai, Hawaii. The scope of work focuses on comprehensive roadway reconstruction and maintenance, including cold planing, resurfacing, the reconstruction of weakened pavement areas, pavement marking and striping, guardrail improvements, and the installation of milled rumble strips. Key deliverables include the leveling of roadway dips using A.C. Mix No. V and the deployment of Type II OM warning signs. The project mandates strict adherence to environmental mitigation, including NPDES Permit requirements for water pollution and erosion control, and requires that all lanes remain open during morning peak hours from 6:00 a.m. to 8:00 a.m. Contractual compliance requires the submission of performance and labor and material payment bonds, as well as certifications for Workers' Compensation and Temporary Disability Insurance. The project is subject to the Davis-Bacon and Related Act and the Contract Work Hours and Safety Standards Act. Technical acceptance is based on the Mean Roughness Index for pavement smoothness, with specific HMA tolerances for asphalt content and mixture temperature. Specialty items for the project include hot mix asphalt pavement, guardrails, and work zone traffic control. Bidders must submit their proposals via the HIePRO portal, with a virtual pre-bid conference scheduled for November 16, 2026.
Department of Transportation

POSTED

about 19 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237310
New
SLED
Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements
Solicitation # 2095-SCP
The City of Rock Hill is soliciting competitive bids for the Downtown Traffic Management Project, which is divided into two primary scopes: Component 1, focusing on the Intelligent Transportation System (ITS), and Component 2, involving Wilson Street Improvements. The ITS component requires the installation of Dynamic Message Signs, Blank-Out Signs, CCTV, and fiber optic infrastructure, including a specific 90-day window for conduit installation following the Notice to Proceed. The Wilson Street Improvements involve widening the roadway from two to three lanes with the addition of bike lanes, milling, resurfacing, and ADA ramp installations. The project has a substantial completion timeline of 730 calendar days. Bidders must be SCDOT prequalified and submit their proposals electronically via the OpenGov eProcurement Portal by November 18, 2026, at 2:00 p.m. Required submission materials include a 5% bid guaranty, proof of prequalification, AIA document A305, and signed certifications regarding lobbying and debarment. The contract will be awarded to the responsible and responsive bidder offering the lowest Total Base Bid. Awardees must adhere to the Davis-Bacon Act, the Build America, Buy America Act, and NIST cybersecurity frameworks for any access to SCDOT electronic data. Payment terms include a 30-day processing window with a 10% retainage withheld until project completion.
Project Management

POSTED

about 19 hours ago

DEADLINE

in 11 days
View Details

More opportunities from California → Caltrans, District 8 - San Bernardino/Riverside

Same awarding agency

NAICS: 237310
SLED
I-40 Bridge and Rock Slope Protection Replacements
Solicitation # 1L800
The I-40 Bridge and Rock Slope Protection Replacements project, managed by Caltrans District 8, involves the restoration of rock slope protection at the Ardis Ditch, Tank Tower Ditch, and Homer Wash bridges, as well as the full replacement of the Woods Wash bridges. Located in San Bernardino County on Interstate 40 between Post Mile R104.6 and R120.5, the scope of work includes modifying drainage systems and streambeds at four specific locations. Key activities consist of removing existing vegetation and rock slope protection, constructing temporary access roads, and installing new partially-grouted rock slope protection. The project is subject to strict environmental compliance under the California Environmental Quality Act and the Lake and Streambed Alteration Agreement. Critical requirements include the development of a Lead Compliance Plan and a Traffic Management Plan, as well as adherence to NESHAP notifications for hazardous air pollutants. Significant biological protections are in place for the desert kit fox, requiring preconstruction surveys by a qualified biologist within 30 days of ground-breaking, the establishment of 200-foot non-disturbance buffers for natal dens from February to June, and immediate work stoppage if a fox is sighted on-site. The project has been certified as having no significant environmental effect following the completion of a Mitigated Negative Declaration.
Highway, Street, and Bridge Construction

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
SR-18 Pavement and Culvert Replacement Project
Solicitation # 08- 1L110/PN 0819000151
The California Department of Transportation (Caltrans), District 8 - San Bernardino/Riverside, is preparing to execute the SR-18 Pavement and Culvert Replacement Project along State Route 18 from Post Mile R17.8 to 31.7, spanning from just east of Route 138/18 separation to View Drive in Big Bear Lake, California. The project encompasses a comprehensive range of roadway improvements including cold planing and asphalt overlay, replacement of 14 culverts, guardrail and end treatment upgrades, installation of centerline rumble strips and recessed pavement markers, vegetation control, guardrail patina staining, asphalt concrete dike replacement, Transportation Management System elements, bicycle signage and obstruction markings, bicycle-friendly grates, drainage feature installation or replacement, embankment repair, sidewalk replacement, and installation of concrete barriers at bridge structures. The work is designed to extend pavement service life and enhance safety and mobility for all users, while strictly adhering to environmental regulations under CEQA and California state law. Construction activities are structured to avoid impacts on sensitive species, including the San Bernardino flying squirrel and American badger, with mandatory pre-construction biological surveys and seasonal work restrictions from June 1 to September 30 to protect nesting periods. Environmental compliance is central to the project’s execution, with specific contractual obligations tied to Standard Special Provisions (SSPs) that govern hazardous material handling, emissions reduction, and biological protection. Contractors must comply with SSPs addressing lead-containing paint and thermoplastic residue, asbestos notification, treated wood waste management, and non-hazardous earth material handling. Emissions reduction mandates require equipment to be properly maintained and certified under CARB regulations. Biological survey requirements, including identification and fencing of rare plant areas, must be completed within one week of construction commencement. While the project has a federal funding allocation of $4,224,000 from the Federal Transportation Improvement Program for FY 2025/26, no explicit contract type, pricing details, payment terms, invoicing procedures, or contracting officer details are provided. Submissions of public comments are due by August 31, 2026, via email or postal mail to the designated Caltrans point of contact, Malisa Lieng. The project is currently in a forecast stage with no formal solicitation number or binding contract documents yet issued, and all contractual obligations are centered on environmental stewardship and Caltrans-specific standards rather than standard federal acquisition clauses or procurement evaluation factors.
Highway, Street, and Bridge Construction

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
SBD-18 Baldwin Lake Pavement Rehabilitation
Solicitation # 1L420
The SBD-18 Baldwin Lake Pavement Rehabilitation project, solicitation number 1L420, is managed by Caltrans District 8 and involves infrastructure and roadway improvements on State Route 18 in San Bernardino County. The scope of work is concentrated at 12 locations between Post Mile 56.2 and Post Mile 66.9. Key activities include road surface rehabilitation, shoulder widening, rumble strip installation, signage replacement, and guardrail system upgrades. Additionally, the project focuses on drainage and waterway modifications, including culvert repair, sleeve lining, the installation of headwalls and rock slope protection, and the concrete lining of the bed and banks at the Cushenberry Creek bridge crossing at postmile 66.9 to ensure hydraulic clearance standards are met. The project has received environmental clearance through the California Environmental Quality Act and the California Department of Fish and Wildlife under Streambed Alteration Agreement EPIMS-SBR-61425-R6. Notices of Determination dated June 2026 confirm that the project will not have a significant environmental effect. The work is categorized under NAICS code 237310 for highway, street, and bridge construction. Primary administrative oversight is provided by Adam Compton of Caltrans District 8, with environmental coordination involving the State Water Board and the Department of Fish and Wildlife.
Highway, Street, and Bridge Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Interstate 40 Minor Pavement Rehabilitation Project
Solicitation # 1M390
The Interstate 40 Minor Pavement Rehabilitation Project, solicitation number 1M390, is a Caltrans District 8 initiative focused on preserving and extending the service life of pavement in San Bernardino County, California. The scope of work includes pavement overlay, localized digouts, guardrail upgrades, culvert replacements, rock slope protection replacement, and traffic sign panel replacement. Additionally, the project involves installing new MGS connected to concrete barrier transitions at specific bridge locations, which may require asbestos testing. All activities are confined to the existing Caltrans right-of-way, and the project is expected to be completed within a 240-day construction period. The project is governed by a Mitigated Negative Declaration under CEQA, confirming no significant environmental impact provided specific mitigation measures are followed. Key requirements include strict adherence to Caltrans Standard Specifications for air pollution control, hazardous materials handling, and emissions reduction. Special environmental protocols are mandated, most notably the Desert Tortoise Protection Protocol, which requires an immediate work stoppage within 50 feet of any discovered tortoise and the implementation of a Worker Environmental Awareness Program. The California Highway Patrol has expressed concerns regarding public safety and traffic congestion due to commercial truck volume, necessitating diligent traffic control. Project administration is led by Kourtney Graves, and the project is subject to inspection and acceptance by the Caltrans Resident Engineer at the project site.
Highway, Street, and Bridge Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
State Route 138 Curve Correction
Solicitation # EPIMS-SBR-63145-R6
The State Route 138 Curve Correction project, identified by agreement EPIMS-SBR-63145-R6, is an infrastructure initiative led by the California Department of Transportation District 8 in San Bernardino County. The project focuses on the realignment of State Route 138 and the modification of drainage systems and streambeds along approximately one-half mile of the highway near Hesperia, specifically between Post Mile T16.20 and PM 16.97, extending from one mile east of Interstate 15 to just west of the Hog Ranch Creek Bridge. Key physical activities include the concrete lining of an existing culvert, the removal of an existing culvert with its associated headwalls, wingwalls, and cable railings, streambed grading, the installation of a new drainage system with headwalls and cable railings, and the placement of un-grouted rock slope protection. The project is governed by Fish and Game Code section 1602 and has been approved by the California Department of Fish and Wildlife. Environmental compliance has been established through a Mitigated Negative Declaration and Addendum under CEQA, with the determination that the project will not have a significant environmental effect provided that specific mitigation measures are implemented as conditions of approval. Administrative oversight is managed by Adam Compton of Caltrans District 8 and Chris Briggs of the California Department of Fish and Wildlife. The project is classified under NAICS code 237310 for highway, street, and bridge construction.
Highway, Street, and Bridge Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Interstate 10 Minor Pavement Rehabilitation Project
Solicitation # 08-1M360
The Interstate 10 Minor Pavement Rehabilitation Project, solicitation number 08-1M360, is a forecast project managed by Caltrans District 8 in Riverside County, California. The primary objective is to extend the service life of the mainline, ramps, and shoulders of Interstate 10 between Palm Springs, Cathedral City, and Thousand Palms through cold planing and the application of Rubberized Asphalt Concrete. The scope of work includes comprehensive infrastructure upgrades such as replacing shoulder rumble strips, upgrading culverts and guardrails to the Midwest Guardrail System, improving ADA curb ramps, and enhancing transportation management and ramp metering systems. Additional safety and accessibility improvements involve installing flashing beacons for pedestrians and bicycles, applying green conflict paint for Class II bike lanes, and utilizing enhanced wet night visibility striping at crosswalks. Environmental and site mitigation are central to the project, featuring the installation of trash capture devices, twelve check dams, six sediment basins, rock slope protection, and concrete aprons. Landscape work includes the removal of dead trees, replanting, and the installation of irrigation systems. The project adheres to the California Environmental Quality Act, with an Initial Study and Negative Declaration confirming no significant environmental effects. Compliance requirements include the implementation of a Worker Environmental Awareness Program, biological monitoring for burrowing owls, and strict adherence to CARB emissions reduction regulations. Contractors must also follow specific Caltrans standards for air pollution control and the handling of lead-containing residue from paint and thermoplastic.
Highway, Street, and Bridge Construction

POSTED

6 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS