Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

SR-18 Pavement and Culvert Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation (Caltrans), District 8 - San Bernardino/Riverside, is preparing to execute the SR-18 Pavement and Culvert Replacement Project along State Route 18 from Post Mile R17.8 to 31.7, spanning from just east of Route 138/18 separation to View Drive in Big Bear Lake, California. The project encompasses a comprehensive range of roadway improvements including cold planing and asphalt overlay, replacement of 14 culverts, guardrail and end treatment upgrades, installation of centerline rumble strips and recessed pavement markers, vegetation control, guardrail patina staining, asphalt concrete dike replacement, Transportation Management System elements, bicycle signage and obstruction markings, bicycle-friendly grates, drainage feature installation or replacement, embankment repair, sidewalk replacement, and installation of concrete barriers at bridge structures. The work is designed to extend pavement service life and enhance safety and mobility for all users, while strictly adhering to environmental regulations under CEQA and California state law. Construction activities are structured to avoid impacts on sensitive species, including the San Bernardino flying squirrel and American badger, with mandatory pre-construction biological surveys and seasonal work restrictions from June 1 to September 30 to protect nesting periods. Environmental compliance is central to the project’s execution, with specific contractual obligations tied to Standard Special Provisions (SSPs) that govern hazardous material handling, emissions reduction, and biological protection. Contractors must comply with SSPs addressing lead-containing paint and thermoplastic residue, asbestos notification, treated wood waste management, and non-hazardous earth material handling. Emissions reduction mandates require equipment to be properly maintained and certified under CARB regulations. Biological survey requirements, including identification and fencing of rare plant areas, must be completed within one week of construction commencement. While the project has a federal funding allocation of $4,224,000 from the Federal Transportation Improvement Program for FY 2025/26, no explicit contract type, pricing details, payment terms, invoicing procedures, or contracting officer details are provided. Submissions of public comments are due by August 31, 2026, via email or postal mail to the designated Caltrans point of contact, Malisa Lieng. The project is currently in a forecast stage with no formal solicitation number or binding contract documents yet issued, and all contractual obligations are centered on environmental stewardship and Caltrans-specific standards rather than standard federal acquisition clauses or procurement evaluation factors.

General Info

Caltrans to upgrade SR-18 pavement, guardrails, culverts, drainage, sidewalks, and add bike safety features near Big Bear Lake.

Agency

California → Caltrans, District 8 - San Bernardino/Riverside

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

SR-138/18, and SR-330/18 interchanges, Big Bear Lake, CA

Set-Aside

NONE

Documents

(4)

SR-18 Pavement and Culvert Replacement Project Notice of Completion

PDFnotice-of-completion

SR-18 Pavement and Culvert Replacement Project Initial Study and Proposed Mitigated Negative Declaration

PDFenvironmental-assessment

SR-18 Pavement and Culvert Replacement Project Public Notice

PDFpublic-notice

SCH Summary Form for SR-18 Pavement and Culvert Replacement Project

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 8 - San Bernardino/Riverside
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 8 - San Bernardino/Riverside
Office AddressN/A
Contacts
Malisa LiengBranch Office Chief, Environmental Planning

Full Description

Show more
The California Department of Transportation (Caltrans) proposes to extend the pavement service life and implement roadway improvements along State Route 18 (SR-18) from Post Mile (PM) R17.8 to 31.7, which is from 0.1 mile east of route 138/18 separation to View Drive. The project scope includes cold plane and overlay, replace asphalt concrete surfacing (digout), guardrail and end treatment upgrades, vegetation control, guardrail patina stain, centerline rumble strip and recessed pavement marker replacement, asphalt concrete dike replacement, Transportation Management System (TMS) elements, bicycle signage, bicycle obstruction markings, bicycle friendly grates, replacement of 14 culverts, drainage feature installation/replacement, embankment repair, sidewalk replacement, and installation of concrete barrier at bridge structure locations.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering site preparation, asbestos abatement, tunneling, boring, and jacking, as well as the installation of various underground piping and utilities. Additional requirements include asphalt and concrete paving, curb and gutter work, fencing, traffic signaling, and the installation of specialized equipment such as sedimentation tanks and generator assemblies. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code, requiring onsite firms to be signatory to collective bargaining agreements with multiple trade unions. Qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises are encouraged to apply, provided they hold the necessary certifications from the Department of General Services and the Port of Long Beach PlanetBids portal. Responsive bidders must possess a valid California Contractor license and provide acceptable insurance, with some subcontractors potentially requiring bonding for 100 percent of their contract value. The project is partially funded by several grants, including those from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD. Interested firms must contact the lead estimator to receive an invitation to bid via the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS