Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Lake Valley SRA Upper Truckee River Restoration Project – Reach 7

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Lake Valley SRA Upper Truckee River Restoration Project – Reach 7 aims to restore the geomorphic and ecological integrity of a 1.5-mile segment of the Upper Truckee River near South Lake Tahoe, California. The project will widen the river corridor to align with current hydrologic patterns, reestablishing natural connections between the river and its active floodplain to enhance aquatic and riparian habitats. By doing so, it seeks to improve overall river and meadow conditions, increasing habitat complexity and biodiversity to support native species such as the Lahontan cutthroat trout, western pearlshell mussel, and Paiute sculpin. The work is designed to foster long-term ecosystem resilience and promote conditions conducive to the recovery and thriving of these at-risk aquatic and terrestrial organisms. The project is led by the California Department of Parks and Recreation, with primary point of contact Lindsay Cline, Senior Environmental Scientist, reachable via email or phone. It was posted as a forecast on July 29, 2026, indicating an upcoming procurement opportunity, though no solicitation number, NAICS code, or set-aside details are currently available. The place of performance is clearly defined as South Lake Tahoe, California, and the official project page can be accessed through the California Environmental Quality Act network. While the contract type and funding specifics are not yet public, the scope and ecological goals suggest a significant, multi-year restoration effort rooted in environmental recovery and species conservation.

General Info

Restore 1.5-mile Upper Truckee River segment to enhance habitats for at-risk species in South Lake Tahoe.

Agency

California Parks and Recreation, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Emerald Bay Road, South Lake Tahoe, CA

Set-Aside

NONE

Documents

(1)

Lake Valley SRA Upper Truckee River Restoration Project Reach 7 NOE Signed 7-28-2026

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Lindsay ClineSenior Environmental Scientist

Full Description

Show more
The Project will restore geomorphic and ecological function to a 1.5-mile reach of the Upper Truckee River by creating a wider river corridor that functions under current hydrologic conditions, reconnects the river to its active floodplain, and enhances aquatic and riparian habitats. This work will result in improved river and meadow conditions and greater habitat complexity and diversity. The Project is designed to benefit aquatic and terrestrial species in the area, including, but not limited to, Lahontan cutthroat trout (Oncorhynchus henshawi henshawi), western pearlshell (Margaritifera falcata), and Paiute sculpin (Cottus beldingii).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
2027 Airfield Project - Contract 1The contract involves a comprehensive upgrade of airfield infrastructure at the Port of Seattle, focusing on modernizing lighting systems, repairing deteriorating pavement and utilities, and enhancing wildlife hazard mitigation. Key tasks include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, as well as removing turf edge dams along runways, taxiways, and access roads to reduce wildlife attraction. Anti-perching devices will be installed on airfield signs, and ponding issues will be addressed through regrading and the installation of new storm drainage infrastructure to minimize water accumulation. Additionally, failing flush fire hydrant access hatches will be replaced to ensure operational readiness and compliance with safety standards. The project is classified under NAICS code 237990 and is forecasted under the title “2027 Airfield Project - Contract 1,” with no set-aside designation specified. The Port of Seattle’s Aviation Project Management Group is the lead agency, with primary point of contact Jay Kim and Project Manager Mengqi Wu available for inquiries. The solicitation was posted in July 2026 and can be accessed through the Port’s official portal, though no solicitation number or specific anticipated award date is provided. Work will be performed at the airport’s airfield facilities, with emphasis on critical safety, operational, and environmental improvements to support ongoing and future aviation activities.
Aviation Project Management Group

POSTED

about 18 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Həʔapus Park Redevelopment - ConstructionThe Həʔapus Park Redevelopment project, managed by the Port of Seattle through the Waterfront Project Management office, will deliver a comprehensive set of upgrades to enhance park accessibility, safety, and visitor experience. Key improvements include the installation of new restrooms, upgraded pathways with enhanced lighting, a boot washing station to support environmental stewardship, dog-friendly amenities to accommodate pet owners, and the addition of wayfinding and interpretive signage to educate visitors and improve navigation. A hand-carrying boat launch will also be constructed to provide low-impact water access. All construction activities will be carefully phased to comply with environmental permitting requirements, particularly restricting in-water work to avoid disrupting tribal fisheries, with substantial completion targeted for the second quarter of 2028. The project will involve both upland and in-water construction elements, requiring strict adherence to seasonal and ecological constraints to protect sensitive aquatic resources and uphold tribal sovereignty. The project is forecasted under NAICS code 237990, indicating non-residential building construction, and the primary point of contact is Angela Peterson of the Port of Seattle, with Julie Yun serving as the project manager. The initiative reflects a commitment to equitable public access, environmental responsibility, and cultural respect, aligning with broader regional goals for sustainable waterfront development. All work must be completed in coordination with regulatory timelines and tribal consultation protocols, ensuring minimal impact on local ecosystems and tribal fishing rights throughout the construction timeline. Interested parties are encouraged to engage through the provided agency portal for upcoming solicitation details.
Waterfront Project Management

POSTED

about 18 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Martha Lake Airport Park & Paine Field Park Playground Replacements
Solicitation # PW-26-0725SB
Snohomish County is soliciting sealed bids for the replacement of playground equipment at Martha Lake Airport Park and Paine Field Park under bid number PW-26-0725SB, with an engineer’s estimate of $695,000. The bid is open to public submission and must be submitted in writing using forms obtained exclusively from the Builders Exchange of Washington virtual plan room, where all plans, specifications, addenda, and related documents are available for free download. Bidders are required to register online to receive automatic notifications of addenda, as it is their sole responsibility to review and acknowledge all updates issued. The proposal deadline is August 18, 2026, at 11:00 AM, and submissions must be delivered in sealed envelopes to the Snohomish County Purchasing Division at 3000 Rockefeller Avenue, Everett, WA, with no other locations accepted. Oral interpretations are prohibited; all inquiries must be submitted in writing to purchasing@snoco.org and will be answered via official addenda. Bid opening will occur publicly on the 6th floor of the Drewel Building and can also be viewed live via Microsoft Teams or by phone. The county affirms its commitment to compliance with Title VI of the Civil Rights Act, ensuring fair opportunity for all bidders without discrimination based on race, color, or national origin. Funding for the project comes entirely from county resources, and no SBE, training, or apprenticeship goals are specified.
Snohomish County

POSTED

about 20 hours ago

DEADLINE

in 19 days
View Details