Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Sidewalk Repair Program - Package No. 89

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sidewalk Repair Program - Package No. 89 is a project managed by the City of Los Angeles Bureau of Engineering to repair existing sidewalks and remove specific Americans with Disabilities Act (ADA) access barriers. This initiative is conducted to fulfill the city's obligations under the Willits Settlement Agreement (U.S. Dist. Court Case No. CV10-05782 CBM [RZX]) and is designed to benefit the general public and local businesses. The scope of work is strictly limited to the removal of ADA barriers and adjacent work required for such removal, ensuring all activities comply with applicable accessibility requirements. The project will not require the removal of street trees or separate discretionary approvals from the Board of Public Works, the Urban Forestry Division, or StreetsLA. The project involves six specific site locations across Council Districts 1, 10, and 14, including intersections at Sunset Blvd and Innes Ave, Sunset Blvd and Beaudry Ave, Sunset Blvd and Figueroa St, Cesar E Chavez Ave and Broadway, and the Expo Station at both Exposition Blvd and Obama Blvd. Under the California Environmental Quality Act (CEQA), the project is statutorily exempt as it is classified as a repair activity necessary for the hosting and staging of the Olympic and Paralympic Games. Administrative oversight is provided by Engineer David Ngyuen, and the project is categorized under NAICS code 237990.

General Info

City of Los Angeles repairs sidewalks for ADA compliance, no tree removal, minimal scope, resident-requested, no extra approvals needed.

Agency

California → City of Los Angeles

Place of Performance

Los Angeles, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts

Full Description

Show more
The Sidewalk Repair Program - Package No. 89 (Project) consists of the repair of existing sidewalks pursuant to the City of Los Angeles’ obligations under the Willits Settlement Agreement (U.S. Dist. Court Case No. CV10-05782 CBM [RZX]). The scope of work is limited to the removal of the specific Americans with Disabilities Act (ADA) access barrier(s) and adjacent work for the purpose of barrier removal, as identified by requestor/resident with a disability, in accordance with the applicable accessibility requirements, including those required by the ADA. The beneficiaries of the Project include the public and local businesses. The Project would not remove any street trees and would not require separate discretionary approval by the Bureau of Street Services (StreetsLA), Urban Forestry Division or the Board of Public Works. Please see the project description continuation in the narrative for more details.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 6 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS