Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Award Notice opportunity from California was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WINCHESTER HILLS SPECIFIC PLAN

Awarded
EPIMS-RIV-58320-R6State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 19 hours ago

DEADLINE

in 12 days
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 20 hours ago

DEADLINE

in 30 days
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 20 hours ago

DEADLINE

in about 1 year

AI Contract Overview

Show more

The California Department of Fish and Wildlife has issued Lake and Streambed Alteration Agreement EPIMS-RIV-58320-R6 to Mark Hayden for the Winchester Hills Specific Plan project in Riverside County. The scope of work is limited to the construction of a residential subdivision featuring a new storm drain outfall structure on the north bank of the Salt Creek Flood Control Channel. This outfall structure, designed to convey flows from future Storm Drain Line A-9 for the Winchester Hills Community Facilities District and Tract 38832, will consist of a concrete pipe within a square, at-grade concrete apron outletting into ungrouted riprap. Additionally, the project includes roadway improvements on Olive Avenue from Leon Road to Beeler Road and on Leon Road from Salt Creek to Olive Avenue. Technical specifications for the site work include the excavation of 1,050 cubic yards of soil and the placement of approximately 970 cubic yards of one-half-ton riprap. Executed pursuant to Fish and Game Code section 1602, the project has been determined to have no significant environmental effect within the jurisdiction of the California Department of Fish and Wildlife, provided that all adopted mitigation measures and monitoring plans are followed. Project administration is coordinated through Environmental Scientist Michael Tovar and Project Planner Russell Brady.

General Info

CDFW agreement for Mark Hayden to build storm drain outfall in Riverside County.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → Riverside County
Office AddressN/A
Contacts
Michael TovarEnvironmental Scientist
Russell BradyProject Planner

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed and issued Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-RIV-58320-R6, pursuant to Fish and Game Code section1602, to Mark Hayden. The Project is limited to the construction of a residential subdivision with one new storm drain outfall structure on the north bank of Salt Creek Flood Control Channel, as well as roadway improvements on Olive Avenue from Leon Road to Beeler Road and Leon Road from Salt Creek to Olive Avenue. Approximately 970 cubic yards of one-half-ton riprap will be placed onsite and 1,050 cubic yards of soil will be excavated from the Project site. The proposed outfall structure will convey outlet flows from future Storm Drain Line A-9 as part of the local Winchester Hills Community Facilities District (CFD) to drain both offsite and Tract 38832 onsite flows. The storm drain outfall will consist of a concrete pipe within a square, at-grade concrete apron that outlets into ungrouted riprap.

More opportunities from California → Riverside County

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS