Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Award Notice opportunity from California was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Port San Luis Harbor Terrace Development Plan

Awarded
C-DRC2025-00022State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 19 hours ago

DEADLINE

in 12 days
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 20 hours ago

DEADLINE

in 30 days
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 20 hours ago

DEADLINE

in about 1 year

AI Contract Overview

Show more

Redtail Acquisitions, acting as the applicant, developer, and manager, is seeking a Minor Use Permit, Variance, and Coastal Development Permit (C-DRC2025-00022) to install a new 53,000-gallon supplemental water storage tank for the Flying Flags RV Resort and Camping facility. Located at 6450 Babe Lane in Avila within the San Luis Bay Coastal Planning Area, the project is necessary to fulfill approval conditions for DRC2013-00044 and enable the final buildout of the RV facility. The scope of work includes preparing a new tank pad, widening a 400-foot access road with gradients between 15% and 23.8%, installing a 12-inch storm drain line, and applying a gravel overlay. The project involves approximately 1,756 cubic yards of cut and fill earthwork and a total disturbance area of 30,924 square feet, requiring specific findings for impacts to slopes between 20% and 30% and in excess of 30%. The project is managed by Cindy Chambers of the San Luis Obispo County Department of Planning and Building. Environmental compliance is governed by the California Environmental Quality Act (CEQA), with a Notice of Determination dated July 9, 2026, confirming that the 2015 Final Environmental Impact Report remains adequate and no new significant environmental impacts were identified. Project approval is contingent upon adherence to a mitigation reporting and monitoring plan and compliance with Ordinance and Building Code requirements, specifically regarding safety measures to protect against slope movement that could affect the campground site and Avila Beach Drive. The Port San Luis Harbor District serves as the landowner and lessor for the site.

General Info

Install 53,000-gallon water tank at Flying Flags RV Resort with road widening, earthwork, and slope variances.

Place of Performance

San Luis Obispo, CA, 93405

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Obispo County
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Cindy ChambersSenior Planner
Tim KihmAuthorized Agent

Full Description

Show more
A request by Tim Kihm with Redtail Acquisitions for a Minor Use Permit, Variance, and Coastal Development Permit (C-DRC2025-00022) to allow a new 53,000-gallon storage tank to supplement the existing water supply for Port San Luis Harbor District, as required under conditions of approval for DRC2013-00044 for the site formerly known as Harbor Terrace, now Flying Flags RV Resort and Camping facility located at 6450 Babe Lane in Avila. Redtail Acquisitions is the applicant, site lessee, developer and manager of the RV park and campground; Port San Luis Harbor District is the landowner and lessor. The project includes preparing a new tank pad and tank installation at the existing water storage facility site (located uphill from the RV campground), widening the 400-foot access road which ranges from 15%-23.8% gradient, addressing drainage conveyance, installing a new 12" storm drain line within the access road, and applying a gravel overlay extending from the tank site to the unfinished upper terrace of the campground development. The supplemental water tank installation will enable completion of the RV facility’s final buildout. Total project grading is approximately 1,756 cubic yards of cut and fill earthwork, and total disturbance is approximately 30,924 square feet. The grading requires findings for Adjustment under 23.05.034(3) for 373 cubic yards of impacts to slopes between 20% and 30% gradient. Findings for a Variance are also requested under 23.01.045 for 474 cubic yards of earthwork on slopes in excess of 30%. The site is located within the Avila Beach Urban Reserve, within the San Luis Bay Coastal Planning Area.

More opportunities from California → San Luis Obispo County

Same awarding agency

NAICS: 236118
SLED
Maynard Minor Use Permit/ Coastal Development Permit C-DRC2025-00028
Solicitation # C-DRC2025-00028
Lizabeth Maynard has requested a Minor Use Permit and Coastal Development Permit (C-DRC2025-00028) for residential construction and improvements at 1665 Berwick Drive in Cambria, California. The project involves adding a 490 square foot ground-floor two-car garage, a 460 square foot second-floor guesthouse, and a 123 square foot addition to the existing 2,220 square foot residence, consisting of a second-floor entry and a first-floor laundry room. Additional features include a 260 square foot second-floor sundeck and a 320 square foot first-floor breezeway, along with driveway improvements. The project will disturb approximately 2,650 square feet of the 9,400 square foot parcel, which is located within the Residential Single Family land use category of the North Coast Planning Area. The project is subject to environmental compliance and requires the removal and replacement of five oak trees at a 6:1 ratio and one pine tree at a 4:1 ratio, with replanting occurring on the project site and an adjacent vacant parcel. Technical assessments, including a Biological Resources Assessment, a Phase 1 Archaeological Resources Assessment, and a Geologic Report with a subsequent peer review, have been completed to ensure no significant environmental or archaeological impacts. The project has been granted a common-sense exemption under the California Environmental Quality Act (CEQA) and was approved on July 17, 2026. Administration is managed by San Luis Obispo County, with Monserath Casillas-Rios serving as the lead agency contact.
Residential Remodelers

POSTED

3 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS