Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Sly Park Recreation Area Pinecone Campground Restroom Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The El Dorado Irrigation District plans to replace an aging and structurally compromised restroom and effluent vault at the Pinecone Campground within the Sly Park Recreation Area in California. The existing facility, one of five serving 38 campsites and other recreational users, has suffered significant deterioration, including cracks in the vault liner that have compromised its containment, leading to potential groundwater infiltration or waste exfiltration. The project involves complete removal of the old structure using heavy equipment such as an excavator and crane, along with hand tools, followed by proper disposal of all excavated materials in accordance with state and local waste regulations. A new vault will be installed by lowering it into place with a crane or excavator arm, and a new restroom building will be secured on top. The surrounding concrete pad will be demolished and reconstructed on-site to form a stable foundation, and all debris will be cleared from the area. Work will be conducted within the previously disturbed zone adjacent to the paved roadway, minimizing new environmental disruption. The campground will be closed to visitors during the project, scheduled for early fall 2026 over approximately 30 days, to coincide with the period of lowest visitor use in the recreation area. The project aims to restore safe and sanitary public facilities while complying with environmental standards and reducing long-term maintenance issues. All activities will be managed to ensure minimal impact on natural surroundings and public access, with the primary point of contact for coordination being Michael C. Baron, the Environmental Review Analyst for the district.

General Info

Replace aging restroom and vault at Pinecone Campground, minimally disruptive, closed fall 2026 for 30 days.

Agency

California → El Dorado Irrigation District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Sly Park Road and Lakewood Drive, CA, 95726

Set-Aside

NONE

Documents

(1)

OCR Recorded NOE Pinecone Campground Restroom Replacement Project

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → El Dorado Irrigation District
Office AddressN/A
Contacts
Michael C. BaronEnvironmental Review Analyst

Full Description

Show more
The El Dorado Irrigation District (District) is proposing to replace an existing restroom facility and effluent vault that is located at the Pinecone Campground in Sly Park Recreation Area (SPRA). The restroom is 1 of 5 available restroom facilities that serve 38 camp sites as well as other recreational users in the SPRA. The facility requires complete replacement of both the vault and the restroom due to structural failure and age. Cracking in the vault liner has compromised the integrity of the containment system, allowing for water infiltration (groundwater entering) or exfiltration (waste leaking out). The work activities would involve the use of an excavator, crane, and hand tools to remove the existing restroom and excavate the vault. The excavated vault and other materials would be disposed of in compliance with State and local requirements for the removal and disposal of waste materials. The site would be cleared of debris and prepared for the installation of a new vault, which would be lowered into place by a crane or excavator arm . Once the vault is in place the new bathroom would be placed on top of the vault with a crane or excavator arm and secured in place. The work will occur within the previously disturbed area immediately adjacent to the existing paved roadway. The concrete pad surrounding the existing facility would be demolished and replaced on-site to provide a new platform for the facility. The campground area surrounding the facility would be closed to visitors and/or campers during the time of year when the SPRA has limited visitor use. The work is expected to occur during early fall 2026 over a period of approximately 30-days.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
2027 Airfield Project - Contract 1The contract involves a comprehensive upgrade of airfield infrastructure at the Port of Seattle, focusing on modernizing lighting systems, repairing deteriorating pavement and utilities, and enhancing wildlife hazard mitigation. Key tasks include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, as well as removing turf edge dams along runways, taxiways, and access roads to reduce wildlife attraction. Anti-perching devices will be installed on airfield signs, and ponding issues will be addressed through regrading and the installation of new storm drainage infrastructure to minimize water accumulation. Additionally, failing flush fire hydrant access hatches will be replaced to ensure operational readiness and compliance with safety standards. The project is classified under NAICS code 237990 and is forecasted under the title “2027 Airfield Project - Contract 1,” with no set-aside designation specified. The Port of Seattle’s Aviation Project Management Group is the lead agency, with primary point of contact Jay Kim and Project Manager Mengqi Wu available for inquiries. The solicitation was posted in July 2026 and can be accessed through the Port’s official portal, though no solicitation number or specific anticipated award date is provided. Work will be performed at the airport’s airfield facilities, with emphasis on critical safety, operational, and environmental improvements to support ongoing and future aviation activities.
Aviation Project Management Group

POSTED

about 18 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Həʔapus Park Redevelopment - ConstructionThe Həʔapus Park Redevelopment project, managed by the Port of Seattle through the Waterfront Project Management office, will deliver a comprehensive set of upgrades to enhance park accessibility, safety, and visitor experience. Key improvements include the installation of new restrooms, upgraded pathways with enhanced lighting, a boot washing station to support environmental stewardship, dog-friendly amenities to accommodate pet owners, and the addition of wayfinding and interpretive signage to educate visitors and improve navigation. A hand-carrying boat launch will also be constructed to provide low-impact water access. All construction activities will be carefully phased to comply with environmental permitting requirements, particularly restricting in-water work to avoid disrupting tribal fisheries, with substantial completion targeted for the second quarter of 2028. The project will involve both upland and in-water construction elements, requiring strict adherence to seasonal and ecological constraints to protect sensitive aquatic resources and uphold tribal sovereignty. The project is forecasted under NAICS code 237990, indicating non-residential building construction, and the primary point of contact is Angela Peterson of the Port of Seattle, with Julie Yun serving as the project manager. The initiative reflects a commitment to equitable public access, environmental responsibility, and cultural respect, aligning with broader regional goals for sustainable waterfront development. All work must be completed in coordination with regulatory timelines and tribal consultation protocols, ensuring minimal impact on local ecosystems and tribal fishing rights throughout the construction timeline. Interested parties are encouraged to engage through the provided agency portal for upcoming solicitation details.
Waterfront Project Management

POSTED

about 18 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Martha Lake Airport Park & Paine Field Park Playground Replacements
Solicitation # PW-26-0725SB
Snohomish County is soliciting sealed bids for the replacement of playground equipment at Martha Lake Airport Park and Paine Field Park under bid number PW-26-0725SB, with an engineer’s estimate of $695,000. The bid is open to public submission and must be submitted in writing using forms obtained exclusively from the Builders Exchange of Washington virtual plan room, where all plans, specifications, addenda, and related documents are available for free download. Bidders are required to register online to receive automatic notifications of addenda, as it is their sole responsibility to review and acknowledge all updates issued. The proposal deadline is August 18, 2026, at 11:00 AM, and submissions must be delivered in sealed envelopes to the Snohomish County Purchasing Division at 3000 Rockefeller Avenue, Everett, WA, with no other locations accepted. Oral interpretations are prohibited; all inquiries must be submitted in writing to purchasing@snoco.org and will be answered via official addenda. Bid opening will occur publicly on the 6th floor of the Drewel Building and can also be viewed live via Microsoft Teams or by phone. The county affirms its commitment to compliance with Title VI of the Civil Rights Act, ensuring fair opportunity for all bidders without discrimination based on race, color, or national origin. Funding for the project comes entirely from county resources, and no SBE, training, or apprenticeship goals are specified.
Snohomish County

POSTED

about 20 hours ago

DEADLINE

in 19 days
View Details