Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Minor Alteration No. WA2025101 – Darneille Levee Pipe Replacement Project

Forecast
WA2025101State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Minor Alteration No. WA2025101 Darnelle Levee Pipe Replacement Project, managed by the Central Valley Flood Protection Board, involves the in-kind removal and replacement of a 24-inch diameter steel irrigation pipe (DSID 19369) located on the left bank of the Knights Landing Ridge Cut in Yolo County, California. The scope of work also includes the removal of an abandoned power pole and necessary restorations to the levee and bank. The project is situated at Levee Mile 0.81 and must adhere to the USACE Sacramento River Flood Control Project Operation and Maintenance Manual Unit 127 and USACE As-Built Drawing No. 50-04-2848. This project is classified under NAICS code 237990 and was posted on September 29, 2025. It has been granted a Notice of Exemption from the California Environmental Quality Act (CEQA) under multiple categorical and statutory exemptions, as the work consists of minor alterations to existing facilities without expanding their use. Primary administrative contact for the project is Senior Environmental Scientist Jennifer Calles, with executive oversight provided by Chris Lief.

General Info

CVFPB project to replace a 24-inch irrigation pipe at Darnelle Levee, California.

Agency

California → Central Valley Flood Protection Board

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A

Full Description

Show more
The project proposes to remove and replace, in-kind, an existing 24-inch diameter steel irrigation pipe (DSID 19369) installed up-and-over in the left bank of the Knights Landing Ridge Cut originally authorized by Permit 9322. The proposed work also includes removal of an abandoned power pole and restorations to the levee and bank. This facility is identified in USACE Sacramento River Flood Control Project, Operation and Maintenance Manual, Unit 127, June 1953, Revised 16 November 2018 (Station 44+35) and USACE As-Built Drawing No. 50-04-2848, dated February 1952, revised March 3, 1953, Sheet 2, STA 44+35.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
W071 Endist Omaha

POSTED

about 4 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
Federal
MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure
Solicitation # FA8903-27-OT-001
Solicitation FA8903-27-OT-001 is an Area of Interest for an Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a, managed by the Department of Defense. The scope focuses on the planning, design, engineering, alteration, repair, and physical construction of horizontal airfield infrastructure. This includes runways, taxiways, aircraft parking aprons, and associated visual and electrical systems such as lighting and automated control systems. Additionally, the scope covers civil, drainage, and safety infrastructure, including stormwater networks, perimeter security fencing, and subsurface utility corridors. All work must adhere to Unified Facilities Criteria (UFC) and Air Force Corporate Standards, with a strong emphasis on Anti-Terrorism/Force Protection standards. The project is structured into two Lines of Effort: LOE 1 focuses on design and planning, while LOE 2 covers final design and physical construction under negotiated commercial terms. The award process is multi-phased, beginning with a Phase 1 Solution Brief, which is a five-page white paper due by January 15, 2027. Evaluation criteria for Phase 1 include relevance to the AOI, the merit of the constructability concept, company viability, and schedule risk. To qualify, companies must demonstrate a history of completing at least three airfield pavement projects on DoW or FAA Part 139 installations within the last 10 years, each valued over $10 million. Performance will take place at DoW installations or commercial FAA Part 139 airports, primarily in the San Antonio, Texas area.
FA8903 772 Ess Pk

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS