Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Larkspur Marina Bulkhead Replacement Project (Notification of Lake or Streambed Alteration, No. EPIMS-MAN-56958-R3).

Forecast
EPIMS-MAN-56958-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Larkspur Marina Bulkhead Replacement Project, executed by the California Department of Fish and Wildlife under Lake and Streambed Alteration Agreement EPIMS-MAN-56958-R3 and Section 1602 of the Fish and Game Code, authorizes the Larkspur Marina Property Owners Association to replace an existing bulkhead wall in Corte Madera, California. The project involves constructing a new bulkhead on the waterside of the existing structure using fiber reinforced vinyl sheets installed via a vibratory method with a small excavator, specifically prohibiting pile driving. Construction will be managed from two floating platforms, and the process includes removing the existing concrete cap, filling the gap with compacted material, and installing a new cap. To mitigate environmental impact, the project mandates the use of silt curtains and turbidity controls. Operational constraints include closing lake inlets by November 30 to protect larval Longfin smelt and maintaining the functionality of the lake outlet's one-way duckbill valve. A pump system connecting the lake to the Corte Madera Creek side channel will be used to manage water levels for flood control and water quality. The project will result in 8,538 square feet of permanent impacts from construction and fill, as well as 156,400 square feet of temporary impacts due to shading from platforms and silt curtains, which must be removed immediately upon completion. This project is granted a Class 2 categorical exemption as it replaces an existing structure with one of substantially the same purpose and capacity.

General Info

Replace aging bulkhead with vinyl wall using floating platforms, no pile driving, environmental safeguards, deadline November 30, 2025.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

Place of Performance

Corte Madera, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MAN-56958-R3, pursuant to Section 1602 of the Fish and Game Code, to Larkspur Marina Property Owners’ Association. The Project is limited to replacing the existing bulkhead wall by constructing a new bulkhead wall built on the waterside of the existing bulkhead along the Lake shoreline. The new bulkhead will be constructed with fiber reinforced vinyl sheets and placed via vibratory method with a small excavator, no pile driving will take place. Construction of the new bulkhead will be conducted from two small floating platforms approximately 15 feet wide by 30 feet long. The concrete cap of the existing bulkhead will be removed as necessary. The space between the existing bulkhead and the new bulkhead will be filled with compacted fill material and a new cap will be installed. Turbidity controls (e.g., silt curtains or similar) will be used around the active work areas, which will allow suspended solids to drop out and minimize turbidity in the Lake. The Lake inlets will be closed off by November 30 which is the end of the work period for larval Longfin smelt (Spirinchus thaleichthys) for the duration of construction activities. The Lake outlet, which is controlled by a one-way duckbill valve, will remain operational and used to lower lake levels as necessary to maintain flood control operations and water quality. A pump system connecting to Corte Madera Creek side channel and the Lake will be used to raise the level of the Lake as necessary during wet and dry seasons to maintain water quality, flood control, and integrity of the existing bulkhead. An existing easement over the outfall pipe in the northeast section of the Lake will be used for access to the floating platforms and staging materials and equipment. The Project will result in 156,400 square feet (3.59 acres) of temporary impacts associated with shade caused by the floating platforms traversing through the Lake and the use of silt curtains, which shall both be removed immediately after Project completion. The Project will result in 8,538 square feet (0.196 acres) of permanent impacts associated with bulkhead construction and fill.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
W071 Endist Omaha

POSTED

about 6 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA063
The U.S. Army Corps of Engineers is soliciting construction services for an interim remedial action at the Nelson Tunnel Superfund Site near Creede, Colorado. The primary objective of this project is to mitigate the risk of uncontrolled releases of mine-impacted water from impounded mine pools. The selected remedy involves the construction of a new bypass adit south of the Nelson Tunnel to bypass the portal pool, the rehabilitation of the Nelson Tunnel from the bypass connection to the bulkhead location, and the installation of flow control bulkheads within both the Nelson Tunnel and the Commodore 5 level. All work must comply with CERCLA, the National Oil and Hazardous Substances Pollution Contingency Plan, and specific geotechnical baseline reports. This is an unrestricted solicitation open to both large and small businesses, utilizing a firm-fixed-price contract and a Best Value Trade-Off award process. Proposals will be evaluated based on project management approach and schedule, past performance, key personnel, and small business participation, with a minimum small business participation goal of 35% of the total contract value. Technical requirements include strict adherence to the National Electrical Code and MSHA standards, and the use of NETA Level III or NICET certified technicians for electrical testing. Offerors must be registered in the System for Award Management with NAICS code 237990 and submit their proposals via the PIEE Solicitation module in two distinct volumes.
W071 Endist Omaha

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
Federal
MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure
Solicitation # FA8903-27-OT-001
Solicitation FA8903-27-OT-001 is an Area of Interest for an Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a, managed by the Department of Defense. The scope focuses on the planning, design, engineering, alteration, repair, and physical construction of horizontal airfield infrastructure. This includes runways, taxiways, aircraft parking aprons, and associated visual and electrical systems such as lighting and automated control systems. Additionally, the scope covers civil, drainage, and safety infrastructure, including stormwater networks, perimeter security fencing, and subsurface utility corridors. All work must adhere to Unified Facilities Criteria (UFC) and Air Force Corporate Standards, with a strong emphasis on Anti-Terrorism/Force Protection standards. The project is structured into two Lines of Effort: LOE 1 focuses on design and planning, while LOE 2 covers final design and physical construction under negotiated commercial terms. The award process is multi-phased, beginning with a Phase 1 Solution Brief, which is a five-page white paper due by January 15, 2027. Evaluation criteria for Phase 1 include relevance to the AOI, the merit of the constructability concept, company viability, and schedule risk. To qualify, companies must demonstrate a history of completing at least three airfield pavement projects on DoW or FAA Part 139 installations within the last 10 years, each valued over $10 million. Performance will take place at DoW installations or commercial FAA Part 139 airports, primarily in the San Antonio, Texas area.
FA8903 772 Ess Pk

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS