Network Providers for Electric Vehicle Charging Systems
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The County currently manages several hundred electric vehicle chargers, including 50 networked units with 77 charging ports, and plans to expand by adding approximately 150 new charging ports across nine sites over the next decade to meet state-mandated clean fleet requirements. Short-term electrification efforts will utilize the SCE Charge Ready Transport incentive program to fund electrical infrastructure development, with conceptual designs already in place. The existing contract for charging equipment, warranty parts, service, and network software expires in August 2027 and will be replaced through a forthcoming RFP. Charging infrastructure is categorized into non-networked units for internal municipal vehicle use and networked units that can serve municipal, employee, or public vehicles. The upcoming RFP seeks suppliers to provide level-2 and level-3 DC fast chargers with full hardware, accessories, networking components, installation, commissioning, and end-to-end integration testing. Included must be a bundled network management solution hosted on county or third-party cloud platforms, supporting remote monitoring, commissioning, decommissioning, remote diagnostics, unlimited technical support, and maintenance services that minimize downtime through on-site labor and extended-warranty parts. The County is also exploring a future Electric Vehicle Charging as a Service model, where a single contractor would finance, design, build, own, and operate networked charging stations on selected county properties under a potential 10-year exclusive site license. Under this model, the contractor would assume all installation, operational, and maintenance costs, including dedicated electrical service connections not shared with other county utilities, and would pay the County either a minimum annual fee or a percentage of gross revenue. The contractor would control the number and type of chargers installed at each site but must align with County review and approval. The County anticipates requiring installation in historically disadvantaged communities and expects contractors to secure related grant funding with county assistance. A GIS-linked list of potential sites is available, and responses to this RFI are requested to identify preferred locations and proposed license terms, including potential adjustments to contract length and rental structure. The RFI, issued under solicitation number RFI-3108603-JB, is open for responses until August 12, 2026, and is managed by the County Executive Office’s Contract Analyst, Roy Aragon.
General Info
Agency
NAICS
Place of Performance
CA, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Interested Companies (9)
See All 9 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description