Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

REPAIRS TO FUEL STORAGE TANKS AND SYSTEMS BUILDINGS 28 & 93

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Europe Africa CentralView Agency

NAICS

N/A

Place of Performance

E: SOUDA BAY, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Europe Africa Central
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Europe Africa Central
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
REPAIRS TO FUEL STORAGE TANKS AND SYSTEMS CLIN 006 - Building 93, Fire Department (UST-093-01) Underground Storage Tank (UST), Diesel, 1,000 gallons. a)Remove residual sludge and fuel from the tank and dispose of them as per FGS section C19.3.2.8. b)Clean the tank and return it to government service as per UFGS 33 01 50.55 (Cleaning of Petroleum Storage Tanks) and UFC 3-460-03. c)Calibrate the tank by API Chapter 2 -Tank Calibration (API MPMS 2.2A, API MPMS 2.2B, API MPMS 2.2C, API MPMS 2.2D or API MPMS 2.2E), API Standard 2550, UFGS 33 56 21.17. Other calibration methods can be used if presented to and approved by the Government. The strapping charts shall not include tank volume above the level of the overflows. Preparation of new calibration tables from inspection report information or interpolation of existing tables shall not be permitted. The table shall be certified by a third party and stamped by a Professional Engineer. In addition, two laminated copies of each Imperial and Metric unit and electronic media data files shall also be provided to FEAD. d) High-level alarms and level indicators need to be installed. CLIN 007 - Building 28, Power Generator Building (UST-028-01/02/03) Three (3) Underground Storage Tanks (UST), Diesel, 3,690 gallons each. a) Remove residual sludge and fuel from the tank and dispose of them as per FGS section C19.3.2.8. b) Clean the tank and return it to government service as per UFGS 33 01 50.55 (Cleaning of Petroleum Storage Tanks) and UFC 3-460-03. c) Calibrate the tank by API Chapter 2 -Tank Calibration (API MPMS 2.2A, API MPMS 2.2B, API MPMS 2.2C, API MPMS 2.2D or API MPMS 2.2E), API Standard 2550, UFGS 33 56 21.17. Other calibration methods can be used if presented to and approved by the Government. The strapping charts shall not include tank volume ab ... NOTE: description has been truncated, please see Project Note for full description.