Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Trail Network Improvement Grants

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Tahoe Conservancy is providing two grants of up to 115,000 dollars each, totaling 230,000 dollars, to the Tahoe Area Mountain Biking Association and the Tahoe Rim Trail Association. These funds are designated for trail enhancement work on USDA Forest Service land within the Lake Tahoe Basin Management Unit, specifically covering the California side of the basin including South Lake Tahoe and unincorporated areas of El Dorado and Placer counties. The project involves hiring professional trail crews to improve up to 40 miles of existing trails during the 2026 and 2027 summer seasons. The scope of work focuses on environmental sustainability and public recreation through the construction of erosion control features such as rock walls, armored drainages, and stream crossings. Additional activities include clearing overgrowth in burn areas and improving trail width, tread, and wayfinding to discourage the creation of unauthorized user trails. All improvements will be conducted within existing trail corridors. The project was approved by the Conservancy on September 18, 2025, and is classified as exempt under California environmental regulations due to the minor nature of the alterations and structures involved.

General Info

$230,000 grant to enhance 40 miles of trails in Lake Tahoe Basin for 2026–2027 summer seasons.

Place of Performance

South Lake Tahoe, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Tahoe Conservancy
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Kristin AndersonRecreation and Public Access Planner

Full Description

Show more
The Conservancy will provide two grants of up to $115,000 ($230,000 total) to the Tahoe Area Mountain Biking Association (TAMBA) and the Tahoe Rim Trail Association (TRTA) for trail enhancement work. TAMBA and the TRTA will hire professional trail crews to complete trail improvements on up to 40 miles of existing trails during the 2026 and 2027 summer seasons, as part of their Volunteer Service Agreement with the LTBMU. Potential work includes building erosion control features (e.g., rock walls, armored drainages, and stream crossings), clearing overgrowth in burn areas, and improving trail width, tread, and wayfinding to reduce user-created trails.

Similar Contracts

Same NAICS industry code

NAICS: 541320
New
SLED
Existing Athletic Fields and New Multi-Use Athletic Facility
Solicitation # 6636
The City of Tualatin is seeking qualified consultant teams to provide design, permitting, and construction support for athletic field improvements funded by the 2022 Parks & Trails Bond. The project is divided into two phases: Phase 1 focuses on improving existing fields at Tualatin Community Park, Atfalati Park, Ibach Park, and Jurgens Park with additions such as covered dugouts, backstops, and ADA drinking fountains. Phase 2 involves the planning and design of a new 103,000 square foot multi-use athletic facility at Tualatin Elementary School, featuring synthetic turf, field lights, and a restroom building. The anticipated period of performance begins with the Phase 1 agreement in March 2027 and continues through project completion in summer 2029. Proposals must be submitted electronically via BidLocker by 2:00 p.m. local time on December 2, 2026. The selection process is based on a best-value evaluation, prioritizing the consultant's ability to deliver comparable projects, project approach, and community engagement. Required submission materials include a cover letter, an organizational chart, a ten-page narrative response, and resumes for the Project Manager, Public Engagement Lead, and Landscape Architect. The resulting contract will be a Professional Services Agreement with payments issued net thirty days after receipt of itemized monthly invoices, contingent upon the City receiving necessary appropriations. All work must adhere to Oregon Public Contracting Code, ADA accessibility standards, and the City's specific professional standards of care.
City of Tualatin, OR

POSTED

1 day ago

DEADLINE

in 25 days
View Details
NAICS: 541320
New
SLED
82627P0002-BEPA: GI-PSE 1-3 Design Services Task Order Contract for Green Infrastructure in NYC Parks & City-owned Street Ends
Solicitation # 82627P0002
The New York City Department of Environmental Protection is seeking up to three consultants to provide design services for Green Infrastructure projects within NYC Parks and City-owned street ends under a rotational task order contract. The primary objective is to implement nature-based solutions, such as bioretention systems, permeable pavement, green roofs, and wetlands, to manage stormwater runoff from impervious surfaces and meet Consent Order requirements for water quality improvement. The scope of work is divided into five phases: project planning, design development (at 30%, 75%, 90%, and 100% completion), construction procurement support, design services during construction, and project close-out. The anticipated contract term is 1,095 days with two one-year renewal options. Proposals are evaluated based on organizational capability (40%), experience (30%), and technical approach (30%), with quantitative preference given to City or State certified M/WBE vendors to meet a 30% participation goal. Financial constraints include a 10% cap on project management costs, a $1,275,000 allowance for other direct costs, and a maximum labor rate of $420 per hour. Compensation for subconsultants is capped at 49% and principals at 35% of the maximum contract amount. All submissions must be processed through the PASSPort portal by November 18, 2026.
Department Of Environmental Protection

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 541320
New
SLED
PARKS AND RECREATION MASTER PLAN
Solicitation # 26-8690
Collier County Parks and Recreation Division is soliciting professional services under solicitation 26-8690 to develop a comprehensive, data-driven Parks and Recreation Master Plan. The project aims to establish a strategic vision for future facilities, programs, and services by assessing current operations, staffing, financial capacity, and maintenance practices while identifying community needs and market trends. The scope of work is divided into six primary tasks, including market research, open space planning, social service and recreation program assessment, master plan development, implementation strategy, and community outreach. Key deliverables include a phased implementation plan with cost estimates and an evaluation of fee structures and equitable access. At least one staff member directly involved in the project must hold certification from the American Institute of Certified Planners. Proposals must be submitted electronically via the OpenGov portal by November 18, 2026. The selection process involves scoring proposals based on past performance, personnel ability, project approach, workload, location, and minority business certification, followed by oral presentations to develop a shortlist for Board of County Commissioners approval. Mandatory submission requirements include a vendor declaration, conflict of interest certification, immigration certification, and proof of E-Verify enrollment. For projects exceeding 200,000 dollars, the successful contractor must provide performance and payment bonds for 100 percent of the contract amount. Payments will be processed in accordance with the Local Government Prompt Payment Act of Florida.
Parks & Recreation

POSTED

2 days ago

DEADLINE

in 11 days
View Details
NAICS: 541320
New
SLED
Campus Consulting Landscape Architecture Services
Solicitation # 20261104027
California Polytechnic State University, San Luis Obispo is soliciting proposals for campus landscape planning and design consulting services under solicitation 20261104027. The selected service provider will be responsible for a variety of design phases, including initial site design, conceptual landscape design, site inventory and analysis, and refined design review. The scope covers diverse project areas such as natural and open spaces, public realm improvements, pedestrian and vehicular corridors, streetscapes, and parking. Key deliverables include the development of project-specific plant lists compliant with the university's approved standards and the provision of construction administration assistance for select projects. The agreement is intended for an initial term of two years, with options to extend for up to three additional years. The award will be based on the highest overall evaluation score, with significant weight placed on the proposed team, firm culture, project definition strategies, and the ability to achieve design excellence within budget and schedule constraints. Proposers must submit their responses in A3 format by December 1, 2026, including an itemized hourly rate schedule. Administrative requirements include invoicing through the CSUBUY platform, registration with the Department of Industrial Relations for prevailing wage compliance, and adherence to California state eligibility and nondiscrimination certifications. The service provider will report to the Executive Facility Officer or a designated campus Project Manager, and final acceptance of work is subject to the approval of the Trustees.
California Polytechnic State University, San Luis Obispo

POSTED

2 days ago

DEADLINE

in 24 days
View Details
NAICS: 541320
New
SLED
Land Development Code Update
Solicitation # 26-107
The City of Fort Myers, Florida, issued solicitation RFP 26-107 to engage a qualified multidisciplinary consulting firm for a comprehensive rewrite of its Land Development Code (LDC). The primary objective is to align the LDC with the updated Comprehensive Plan and remove regulatory barriers to infill, adaptive reuse, and redevelopment. The scope of work includes project management, an assessment of existing conditions and code consistency, the development of a new code framework, and extensive stakeholder and public engagement. Key deliverables include an existing conditions report, a code crosswalk, a preliminary rewritten LDC within six months, and final adoption-ready documents and training materials within one year of the project start date. Proposals must be submitted as a single PDF via the OpenGov portal by November 13, 2026. Qualified respondents must demonstrate at least five years of business stability and provide mandatory certifications, including a Human Trafficking Affidavit, Current Capacity Certification, and Non-Collusion Certification. The City will utilize a points-based scoring method to rank short-listed firms, with the highest-ranked respondent entering negotiations for a Professional Services Agreement. While the solicitation originally included special conditions for Minority Business Enterprises and local preferences, these were removed via Addendum 1. Selected consultants must adhere to strict insurance requirements and quality control standards to ensure legal consistency and technical accuracy in all final deliverables.
Community Development

POSTED

3 days ago

DEADLINE

in 6 days
View Details
NAICS: 541320
New
SLED
Deane's Children's Park Phase I and II Improvements
Solicitation # 2026-RFQ-044
Solicitation 2026-RFQ-044, issued by the City of Mercer Island Public Works department, seeks professional services for the detailed design, permitting, and construction of Phase I and II improvements at Deane's Children's Park located at 5701 Island Crest Way, Washington. The project focuses on expanding inclusive play and accessibility while preserving the site's natural character. Phase I includes nature-based inclusive play features for ages 5 to 12 and older, swings, fencing, accessible parking, a connection to Island Park Elementary, utility infrastructure, and native vegetation restoration. Phase II involves the redevelopment of the central play area with inclusive features for children ages 2 to 12 and older. The selected consultant must be licensed in Washington State per RCW 39.80.020 and adhere to ADA and playground safety standards. The contract will be governed by the City's standard professional services agreement, requiring the consultant to act as an independent contractor and provide comprehensive indemnification to the City. Payment will be made via City warrant within 45 days of receiving monthly invoices. The evaluation process involves screening Statements of Qualifications, which are due by December 4, 2026, and may include short-listing, interviews, and reference checks. The final selection is at the sole discretion of the City. Awarded firms must maintain cost records for three years following final payment and provide technical construction support, including the review of RFIs and shop drawings.
Public Works

POSTED

3 days ago

DEADLINE

in 27 days
View Details

More opportunities from California → Tahoe Conservancy

Same awarding agency

NAICS: 541620
SLED
Land Bank Pier Program
Solicitation # 117-060-018
The California Tahoe Conservancy, acting as the lead agency, manages the Land Bank Pier Program to facilitate the sale of coverage and restoration credits for the construction of structures providing access to piers and watercraft moorings within the shorezone of Lake Tahoe. This specific action involves the transfer of restoration credits from Conservancy-owned land to 2750 West Lake Blvd to satisfy Tahoe Regional Planning Agency permit requirements. The project entails the demolition and permanent removal of an existing single-use pier and all appurtenant structures at 2895 West Lake Blvd and the reconstruction of a new 10-foot wide by 100-foot long single-use pier at 2750 West Lake Blvd, which will include public access stairways. Under the California Environmental Quality Act, the Conservancy determined that the project will not have a significant effect on the environment and adopted a negative declaration. No mitigation measures, monitoring plans, or statements of overriding conditions were required for approval. This internal agency environmental compliance action is associated with solicitation number 117-060-018 and includes a paid environmental filing fee of 2,480.25 dollars to the California Department of Fish and Wildlife. The project is located in Tahoe City, California, and ensures consistency with the program guidelines adopted on November 8, 2021.
Environmental Consulting Services

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
South Tahoe Greenway Shared-Use Trail (Greenway) Project Modifications
Solicitation # 2006112070
The California Tahoe Conservancy is implementing modifications to the Dennis T. Machida Memorial Greenway, specifically focusing on the northern 1/3 mile of Phase 3 known as the Greenway-Van Sickle Connector in South Lake Tahoe. This project, identified by solicitation number 2006112070, involves refining the trail alignment between Chonokis Road and the Greenway terminus, adjusting boardwalk widths and footings, and substituting mitigation measure CUL-1. These changes are designed to ensure compliance with the Americans with Disabilities Act (ADA) and are intended to be constructed concurrently with the Van Sickle Bi-State Park Safety and Equitable Access Improvements Project to maximize efficiency. The project is governed by the California Environmental Quality Act (CEQA), with a Notice of Determination issued on June 18, 2026, stating that the project will not have a significant environmental impact. Compliance is managed through a Mitigation Monitoring and Reporting Plan that includes protections for raptor and migratory bird nests, sensitive plants, and wildlife. Additionally, the project adheres to TRPA Code section 61.3.7 for old growth protection and requires archaeological monitoring during ground-disturbing activities to protect historical and tribal cultural resources. Scott Cecchi serves as the Project Manager for the California Tahoe Conservancy.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Van Sickle Bi-State Park Safety and Equitable Access Improvements Project
Solicitation # 2009042033
The Van Sickle Bi-State Park Safety and Equitable Access Improvements Project, managed by the California Tahoe Conservancy and the Department of General Services, focuses on enhancing accessibility and infrastructure within a 15-acre area of the park in South Lake Tahoe, El Dorado County. This phase three project involves the construction of approximately 0.4 to 0.5 miles of Class 1 paved shared-use trails and unpaved hiking trails to connect the California day-use area to the park entrance and the state line monument. Additional deliverables include a new entrance plaza, two picnic areas with amenities, and the paving and upgrading of an unpaved parking lot to include stormwater facilities and snow storage for winter operations. All improvements must align with the Conservancy's 2018 ADA Self-Evaluation and Transition Plan to ensure equitable pedestrian and bicycle access. The project is subject to strict environmental and cultural compliance measures under CEQA and TRPA regulations. Key requirements include the implementation of a Stormwater Pollution Prevention Plan (SWPPP) and an Invasive Species Prevention and Management Plan featuring clean-equipment protocols to prevent the spread of noxious weeds. Biological protections require pre-construction nesting bird surveys from March to August and protocol-level special-status plant surveys by qualified botanists. Furthermore, archaeological surveys must be conducted by a qualified archaeologist and a member of the Washoe Tribe. In the event of a cultural discovery, work must cease within 100 feet of the find until the Conservancy and the Washoe Tribe provide direction for protection or preservation.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS