Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on January 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCG PATOKA MOLD REMEDIATION AND RE-INSULATION

Awarded
70Z08526Q0001423Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
COLUMBIA Class Tailcone Manufacture
Solicitation # N0016726R1005
The Naval Surface Warfare Center Carderock Division is soliciting proposals for the manufacture and acquisition of COLUMBIA Class submarine propulsor tailcones. The scope of work involves the procurement of materials, machining, assembly, painting, and delivery of up to eight tailcone kits, with a minimum of one kit required in the first year and options for seven additional kits. The contract also includes requirements for engineering support services, such as design reviews and the development of a manufacturing plan and final certification package. This is a DPAS rated DX-A3 order utilizing a combination of Fixed Price Incentive Firm Target for hardware, Cost Plus Fixed Fee for engineering services, and Cost No Fee for data requirements. Award will be determined via a best value tradeoff process evaluating technical capability, cost proposal, past performance, and small business participation, with technical capability being the most significant factor. Proposals must be submitted electronically through the PIEE Solicitation Module and organized into five distinct volumes. Key deliverables include a variety of Contract Data Requirements List items, such as monthly status reports, performance and cost reports, and conference minutes. The contract mandates strict adherence to security protocols for classified and unclassified data, compliance with ISO 9001:2008 or AS9100 quality standards, and the use of the Wide Area WorkFlow system for invoicing.
Nswc Carderock

POSTED

about 5 hours ago

DEADLINE

in 3 months
NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is seeking a factory-certified marine contractor to perform a complete propulsion repower and helm system integration on a 30 foot Munson Packman landing craft. The project involves the decommissioning and removal of two existing Honda BF250A outboard engines and legacy iST components, followed by the installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work includes comprehensive digital rigging, the installation of new Honda iST electronic control heads at dual helm stations, integration with the existing NMEA 2000 backbone and SeaStar Power Assist steering system, and a full fuel system overhaul using USCG Type A1-15 lines. The project concludes with factory diagnostic checks and a minimum two hour sea trial to validate performance and safety protocols. To ensure quality and warranty coverage, the contractor must be an authorized Honda Marine Dealer or Service Center and employ technicians with at least five years of experience with commercial aluminum vessels and complex marine networks. Proposals must be submitted as a PDF by November 13, 2026, and must provide a firm-fixed price. Award selection is based on a 100 point evaluation criteria, with a preference for responsible Indian Offerors. The contract requires the contractor to maintain significant insurance coverages, including 1 million dollars per occurrence in general liability, and mandates a 25 percent retainage or a performance bond for contracts exceeding 100,000 dollars. All disputes are subject to the jurisdiction of the Colville Tribal Court and tribal law, and contractors must comply with the Colville Tribal Employment Rights Ordinance.
Confederated Tribes of the Colville Reservation

POSTED

about 16 hours ago

DEADLINE

in 15 days
NAICS: 336611
New
DIBBS
TRAINING SET, FIRE FIGH
Solicitation # SPE8E6-27-T-0421
Solicitation SPE8E6-27-T-0421 is a fixed-price procurement by the Defense Logistics Agency for 39 kits of Fire Fighting and Damage Control training sets, identified by NSN 6930-01-585-8179. The contract is designated as a Service-Disabled Veteran-Owned Small Business Set-Aside, though some sections of the documentation contain conflicting notes regarding small business status. Key delivery requirements include a 76-day delivery window after award, with a need ship date of October 9, 2026, and an original required delivery date of March 30, 2027. Shipping is FOB Origin, with the destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contractor must adhere to strict packaging and marking standards, specifically MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Palletization must comply with DLA requirement RP001. Special material restrictions are in place, prohibiting the intentional addition of mercury or mercury-containing compounds, except where functionally required and specified by NAVSEA. The contract incorporates various federal regulations, including the Buy American and Balance of Payments Program, safeguarding of covered defense information, and hazardous material labeling per 29 CFR 1910.1200. Inspection and acceptance will occur at the destination, and all invoicing must be processed electronically through the Wide Area WorkFlow system.
DDSP NEW CUMBERLAND FACILITY

POSTED

1 day ago

DEADLINE

in 11 days
NAICS: 336611
New
DIBBS
LAMINATED CONDUCTO
Solicitation # SPE7M2-27-T-0463
Solicitation SPE7M2-27-T-0463 is a small business set-aside issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 13 units of Laminated Conducto, identified by NSN 6145-01-524-6075. The requirement is classified under NAICS code 336611. Key delivery milestones include a need ship date of April 26, 2027, and an original required delivery date of January 5, 2028, with a delivery lead time of 167 days after receipt of order. Shipping is designated as FOB Origin, with the destination for both inspection and acceptance being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements found in the DLA Master List, specifically referencing RA001, RC001, RP001, and RQ011. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow RP001. A critical environmental restriction prohibits the intentional addition of mercury or mercury-containing compounds to the hardware, except for specific functional exceptions. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment. The solicitation incorporates various FAR and DFARS clauses covering cybersecurity, the Buy American Act, and the prohibition of covered defense telecommunications equipment.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

1 day ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The United States Coast Guard Surface Force Logistics Center is soliciting quotations for mold remediation and reinsulation services for the USCGC PATOKA (WLR 75408) located in Greenville, Mississippi. This total small business set-aside is being awarded on a firm-fixed-price basis using simplified acquisition procedures under NAICS code 336611. The project aims to restore air quality and habitability by removing approximately 1,510 square feet of overhead and bulkhead panels and insulation across twelve shipboard areas, including the bridge, crew berthing, and galley. The contractor is responsible for providing all labor, materials, and tools to remediate mold using industry-standard methods, installing new wood support beams, and applying new bulkhead insulation and aluminum paneling to eliminate air gaps that previously caused condensation and rust. The period of performance is scheduled from February 16, 2026, to March 2, 2026, not to exceed 14 calendar days. Work will generally occur Monday through Friday from 0730 to 1600 EST, though weekends and holidays may be required. The contractor must adhere to several technical standards, including 29 CFR Part 1915 for shipyard safety, ASTM F683 for thermal insulation, and SFLC Std Spec 6310 for painting. Key deliverables include a trip report and warranty documentation due within seven days of project completion. Final acceptance is contingent upon an inspection by the Engineer Petty Officer and the submission of a Contractor’s Final Report following operational testing. All travel expenses are the sole responsibility of the contractor.

General Info

Contract Value

$119,690.2

NAICS

336611 - Ship Building and Repairing

Place of Performance

Greenville, MS, 38701, USA

Set-Aside

SBA

Awardee

AD4K LLC

Award Issued Date

Documents

2

RFQ 70Z08526Q0001423 USCGC PATOKA Mold Remediation

DOCX, High priority: read this first5 pages · rfq
High

USCGC PATOKA Mold Remediation and Reinsulation SOW

DOCX, High priority: read this first4 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jan 27, 2026 to Feb 5, 2026. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA

Full Description

Show more

This RFQ had been extented to close on 02/05/2026 to give an opportunitty to all vendors to do cite visit for this requirenment. Please feel free to contact the below POC if requesting any cite visit:


contact@example.gov


MKC Michael Zimmer


WLR/WLM Asset Manger


USCG Surface Forces Logistics Center


2401 Hawkins Point RD


Baltimore, MD. 21226


This is a combined synopsis/solicitation



This is a combined synopsis/solicitation for commercial items/services prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. Request for Quotations number is 70Z08526Q0001423 and is issued as a request for quotations (RFQ). This announcement constitutes only solicitation; quotations are being requested, and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-65 dated January 29, 2013. The NAICS Code is 336611. The small business size standard is 1250. This is a totally small business set aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. All responses from interested vendors must be received on/before 0800 Pacific Time, January 27th, 2026, and will be reviewed by the Government.   



The United States Coast Guard Surface Force Logistics Center has a requirement for the following:


Contractor shall provide parts requested for USCGC PATOKA Mold Remediation Spare Parts:



 STATEMENT OF WORK (SOW)


FOR


USCGC PATOKA MOLD REMEDIATION AND REINSULATION



PATOKA discovered mold in their berthing and common areas and has an immediate need for technical support for tasks outlined in this Statement of Work (SOW).




1.0 GENERAL



    1. Background 

The 75’ WLR asset, USCGC PATOKA, had a previous mold remediation completed were contractors removed and replaced approximately 1510 square feet of overhead and bulkhead insulation and panels. However, the contractor did not fill all the air gaps between the false bulkhead and the bulkhead, leaving room for air to condensate on the panels.  The contractor also installed the incorrect panels, using a type of steel instead of aluminum, this steel paneling has begun to rust as moisture condenses on the panels.  



    1.  Scope 

The scope of this contract is defined by the efforts and tools required to support USCGC PATOKA (WLR 75408). The Contractor shall provide all labor, materials, and tools necessary to remove insulation, remediate mold (if found), reinsulate leaving no air gaps between false bulkhead and bulkhead, and install new aluminum panels.



    1. OBJECTIVE

The goal is to return CGC PATOKA air quality and habitability conditions to acceptable conditions.



    1. APPLICABLE DOCUMENTS


      1. Compliance Documents

The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:


               


Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General Requirements


29 Code of Federal Regulations (CFR) Part 1915, Occupational Safety and Health Standards for Shipyards 


ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery


NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details



  1. SPECIFIC REQUIREMENTS/TASKS

Unless otherwise stated, this contract applies to on-site support for USCGC PATOKA (WLR 75408) in GREENVILLE, MS.





2.1 Remediate Mold


The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.



      1. The Contractor shall remove all overhead and bulkhead panels in the following spaces (all square footage is an estimate):
        1.   Bridge (234 sq. ft.)
        2.   OIC Stateroom (330 sq. ft.)
        3.   CPO Stateroom (275 sq. ft.)
        4.   CPO Head (40 sq. ft.)
        5.   CPO Passageway (25 sq. ft)
        6.   Main Deck Passageway
        7.   Log Office (182 sq. ft.)
        8.   Crew Berthing (490 sq. ft.)
        9.   Crew Head (84 sq ft)
        10. Laundry (91 sq. ft.)
        11. Galley (79.6 sq. ft.)
        12. Messdeck (240 sq. ft.)
      2. The contractor shall remove any interferences such as structures, lights, outlets, speakers, and alarms and work with the Engineer Petty Officer (EPO) or the EPO’s designated representative to ensure power is properly secured before removal.
      3. The Contractor shall remove and dispose of all existing insulation in areas designated in section 2.1.1.
      4. The Contractor shall remove all existing wood support beams in areas designated in section 2.1.1.
      5. The Contractor shall test for mold in in areas designated in section 2.1.1..
      6. The Contractor shall remediate all mold discovered.
        1. Contractor shall use industry standard means of remediation that are approved by federal and state agencies governing mold remediation.
      7. The Contractor shall conduct mold testing to the areas designated in section 2.1.1 to ensure mold was properly remediated.
        1. Testing shall include industry standard means of surface testing as well as air quality testing in the designated spaces in section 2.1.1. 
      8. The Contractor shall install plastic sheeting to all the areas where the bulkhead and overhead panels were removed to prevent insulation dust/debris falling on the crew while underway.


2.2 Test Thoroughly and Document


The Contractor shall ensure the cutter is fully remediated of mold by preforming a walkthrough of all spaces identified in section 2.1.3. with the Engineer Petty Officer (EPO) or the EPO’s designated representative.



2.2.1    The Contractor shall provide a trip report documenting all findings no later             than 7 days after returning to the home office.



    1. Reinsulating and Paneling
      1. Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
      2. Removal. The Contractor shall remove all existing insulation material over the designated pipe surfaces, including associated pipe hangers, valves, fittings, and flanges.
      3. New insulation installation - interior refrigerant, hot water and cold and chill water piping systems (Temperature Range: -20 to +180 Deg. F). The Contractor shall install new insulation material over the exposed pipe surfaces, including associated pipe hangers, valves, fittings, and flanges, in accordance with details in NAVSEA Drawing 804-5959214; select appropriate insulation materials and thicknesses for the application and temperature ranges specified in ASTM F683, Tables S1.1 and 5.
      4. Preservation. The Contractor shall paint the newly installed insulation system, in accordance with SFLC Std Spec 6310, using the system specified for “Insulation Surfaces, Fiberglass Sheet/Closed Cell PVC Foam” in Appendix B (Cutter and Boat Interior Paint Systems).
      5. Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
      6. The Contractor shall install new wood support beams in areas designated in section 2.1.1.
      7. The Contractor shall install new bulkhead insulation that fills the air gap between the false bulkhead panels and the bulkhead meeting Coast Guard Specification 164.109/37/0 in areas designated in section 2.1.1.
      8. The Contractor shall install new aluminum false bulkhead paneling in areas designated in section 2.1.1..
      9. The Contractor shall reinstall any interferences and ensure electrical components have the proper covers installed.


  1. CONTRACTOR PERSONNEL 


3.1          The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.




  1. OTHER APPLICABLE CONDITIONS


    1. Interferences

The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3. (Interferences). Known interferences include, but are not limited to the following:


  • Outlets
  • Lighting
  • Fan units
  • Alarms
  • Speakers
  • Switches
  • Windows



    1. PERIOD of PERFORMANCE: 16FEB2026-02MAR2026

The period of performance for this contract shall not exceed 14 calendar days from the date of award unless approved by the contracting officer.



4.3 PLACE OF PERFORMANCE 


The primary place of performance will be at CGC PATOKA at 1797 Harbor Front RD, Greenville, MS 38701 unless an alternate location is approved by the Coast Guard.



4.4 HOURS OF OPERATION


Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays).  However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship’s operations. 



4.5 TRAVEL 


Contractor travel may be required to support this requirement.  All travel required by this task shall be provided by the Contractor at no expense to the Government.




5.0 GOVERNMENT FURNISHED RESOURCES


NONE



6.0 CONTRACTOR FURNISHED PROPERTY 


The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.



  1. GOVERNMENT ACCEPTANCE PERIOD

The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance.  If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.             



8.0 DELIVERABLES


The Contractor shall provide a trip report and warranty no later                         than 7 days after returning to the home office.



9.0 NOTES



    1. List of known suppliers. Below is a list of known manufacturers/suppliers:
      1. Temperature Inc.

7500Appling Center Dr


Memphis TX 38133


+1 (555) 000-0000 O


+1 (555) 000-0000 C



Industrial Commercial Marine(ICM) +1 (555) 000-0000



Advanced Thermal Products (ATP), Inc. +1 (555) 000-0000

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS