Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Fremont Last Mile Broadband (PWC9118)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Fremont is implementing the Fremont Last Mile Broadband project (PWC9118) to establish a high-speed fiber network connecting 516 unserved locations, as defined by CPUC standards, including households and anchor institutions. The project involves the installation of 120,323 linear feet of 288-strand fiber optic cable, which will interconnect with the Statewide Middle Mile Backbone Network (MMBN). The infrastructure consists of 80,574 feet of underground fiber, 20,407 feet of aerial fiber attached to existing utility poles, and 19,342 feet of fiber installed within existing conduits. All underground routes will be placed within existing rights-of-way to ensure redundancy and future capacity. The project is managed by the City of Fremont Department of Public Works, with Principal Civil Engineer Frans Van Der Meer serving as the primary point of contact. The project has been granted a CEQA exemption by the City Council as of July 21, 2026, and all activities must adhere to Fremont Municipal Code Chapter 18.218. The work is categorized under NAICS code 237130 and will be performed at various locations throughout the City of Fremont, California.

General Info

Fremont to deploy 120k feet of fiber connecting 516 unserved households and anchor institutions with future-ready broadband.

Agency

California → City of Fremont

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Citywide (see attached map exhibit for locations), Fremont, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Fremont Last Mile Broadband Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fremont
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Fremont
Office AddressN/A
Contacts
Frans Van Der MeerPrincipal Civil Engineer

Full Description

Show more
The City of Fremont is constructing a fiber network to connect unserved households and anchor institutions with high-speed, affordable broadband. This project will establish 120,323 linear feet of new fiber optic cable across the City and interconnect with sections of the Statewide Middle Mile Backbone Network (MMBN) while simultaneously providing last-mile connection within the most critically unserved communities and neighborhoods. The project will bring scalable broadband speeds to 516 unserved locations as determined by CPUC standards. This project contains 80,574 feet of underground fiber, 20,407 feet of aerial fiber, and 19,342 feet of new fiber installed in existing conduit. Underground routes will be laid within existing rights of way while all aerial routes will be attached to pre-existing utility poles. These routes will ensure redundancy and future capacity, and will include new and existing conduit within previously disturbed rights-of-way with a 288-strand fiber cable.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Keystone Power Outage Repairs
Solicitation # keystone-power-outage-repairs
The Keystone Power Outage Repairs solicitation, issued by Adams & Associates Keystone Red Rock Job Corps, seeks a contractor to perform electrical infrastructure repairs at the Keystone Red Rock Job Corps Center in Drums, Pennsylvania. The scope of work involves restoring electrical service and replacing damaged equipment on poles 35, 43, and 45. Specific technical requirements include the installation of one 100 kva and two 50 kva transformers on pole 45, one 100 kva transformer on pole 43, and one 75 kva transformer on pole 35. Additionally, the contractor must install new polymer cutouts and 10kv lightning arresters on poles 35 and 43, establish new service drops to buildings, install a new secondary quadplex for the main trunk line, and handle the demolition and disposal of old secondary cabling. Final deliverables include the verification of voltage and proper rotation within the buildings. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB, under NAICS code 237130. The response deadline is September 9, 2026. Bidders must be registered and active in SAM.gov and are required to separate labor and materials on their bids. The project is subject to Davis-Bacon wage standards, and the successful contractor must provide certified payroll documentation. Primary point of contact for this effort is Jennie Drumheller.
Adams & Associates Keystone Red Rock Job Corps

POSTED

about 15 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237130
New
SLED
CONTRACT : 26-333577; PHASE V COMMUNICATION FACILITIES REPLACEMENT: GROUP A ;CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION (CALFIRE);HUMBOLDT & SHASTA COUNTIES, CALIFORNIA
Solicitation # 0000040277
The State of California Department of General Services is soliciting bids for Contract 26-333577, Project No. 1512A, 1512B, and 1512E, regarding the Phase V Communication Facilities Replacement for the California Department of Forestry and Fire Protection (CALFIRE). The project involves the replacement of communication facilities at three sites: Pratt Mountain, Bunchgrass Mountain, and Mt. Pierce, located in Humboldt and Shasta Counties. The scope of work includes demolition, excavation, structural steel, fencing, cast-in-place concrete, CMU block wall vault construction, panelboards, switchgear, generators, and tower erection. The state has estimated the project cost at 20,739,900.00 dollars with a project term of 991 calendar days. Eligible bidders must hold a Class A or B license and attend mandatory pre-bid site inspection tours on September 16 and 17, 2026. Sealed bids are due by 2:00 PM on September 30, 2026, with a public bid opening scheduled for October 1, 2026. Awardees must provide payment and performance bonds totaling 100 percent of the contract price and submit Certificates of Reported Compliance for any fleet vehicles subject to California Air Resources Board regulations. The contractor is also responsible for adhering to all federal, state, and local health and safety mandates, with all associated costs being the responsibility of the contractor.
California Department of General Services

POSTED

2 days ago

DEADLINE

in 24 days
View Details