Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Grove Basin Outlet Storm Drain Improvement Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Grove Basin Outlet Storm Drain Improvement Project, managed by the San Bernardino County Flood Control District, involves significant infrastructure upgrades to the storm drain system along Grove Avenue in San Bernardino County. The scope of work includes the installation of new 84-inch and 96-inch reinforced concrete pipe (RCP) from Edison Avenue to Chino Avenue, as well as the replacement of an existing 66-inch RCP with a larger 72-inch RCP extending from Chino Avenue to just south of the Grove Basin. The project encompasses a total pipeline length of 6,583 feet with a disturbance area width of 14 feet. In addition to pipeline work, the contract requires the replacement of existing structures, the removal of existing outlet structures, and the reconstruction of affected roadways and driveways. The project has been certified for compliance with the California Environmental Quality Act (CEQA), with a Notice of Determination stating that the improvements will not have significant environmental effects, thereby requiring no mitigation measures or monitoring plans. Performance is centered in Ontario, California, specifically along the Grove Avenue corridor. The San Bernardino County Flood Control District serves as the administering entity, with administrative oversight provided by the project contact Ayida Smith. While specific contract values, pricing schedules, and evaluation factors are not detailed in the available documentation, the project is categorized under NAICS code 237990 for heavy and civil engineering construction.

General Info

San Bernardino County storm drain upgrades including RCP pipe installation and roadway reconstruction.

Agency

California → San Bernardino Flood Control District

Place of Performance

Grove Avenue between East Riverside Drive to Edison Avenue, Ontario, CA, 91761

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino Flood Control District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Bernardino Flood Control District
Office AddressN/A

Full Description

Show more
The project is to install a new 84-inch reinforced concrete pipe (RCP) and 96-inch RCP from Edison Ave to Chino Ave. Replaced the existing 66-inch RCP with a 72-inch RCP from Chino Ave to just south of the Grove Basin. The project will replace existing structures, reconstruct the roadway and driveways, and remove existing outlet structures. The disturbance area width is 14 feet and a total pipeline length of 6,583 feet.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
W071 Endist Omaha

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS