Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Meka Vineyard - Vineyard Conversion #P24-00065-ECPA

Forecast
P24-00065-ECPAState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Meka Vineyard Conversion project (P24-00065-ECPA) involves the development of 26.0 gross acres of new vineyard, with 19.8 net planted acres, located at 4473 Atlas Peak Road in Yountville, California. Managed by the Napa County Planning, Building, and Environmental Services department, the scope of work includes clearing non-native grassland, toyon chaparral, and black oak woodland, as well as earthmoving and the installation of agricultural infrastructure, including two 50,000-gallon water storage tanks and various erosion control measures. The project is designed to be completed in a single phase, with construction activities scheduled between April and September, including a strict winterization deadline of September 15 to ensure all earth-disturbing activities and drainage improvements are complete. Environmental compliance is a central component of the contract, with a Mitigated Negative Declaration issued under CEQA indicating no significant environmental impacts provided specific mitigation measures are followed. These measures include pre-construction surveys for special-status birds and bats, habitat preservation for oak woodlands, and adherence to a detailed Agricultural Erosion Control Plan. Technical assessments have been conducted to ensure soil loss does not exceed pre-project levels, peak runoff remains stable, and water availability is sustainable via three developed springs and existing wells. Oversight is provided by a qualified professional who must conduct annual inspections prior to winter rains and certify the functionality of erosion control and sediment retention devices until final county acceptance.

General Info

Meka Vineyard project: 19.8 net acres of vineyard development in Yountville, California.

Place of Performance

Monticello Road (Highway 121), Yountville, CA, 94558

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts2 people available
OfficeN/A

Full Description

Show more
Project #: #P24-00065-ECPA The proposed project involves the clearing of vegetation (oak woodland/forest, chaparral, and non-native grassland, within the proposed project area (or clearing limits), earthmoving, and the installation and maintenance of erosion control measures and agricultural infrastructure, that includes two 50,000-gallon water storage tanks, in connection with the development of 26.0 gross acres of new vineyard (19.8 net planted acres) within an approximate 96.6-acre parcel.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Colgate Penstock Rebuild And Tunnel Repair Project
Solicitation # 11494
The Yuba County Water Agency is soliciting qualifications for the Colgate Penstock Rebuild and Tunnel Repair Project in Dobbins, California. This project utilizes a Construction Manager/General Contractor (CMGC) delivery method, encompassing both preconstruction and construction services. The scope is divided into two primary components: the New Colgate Tunnel Project, which involves localized demolition, concrete repair, and anchor installation, and the Colgate Penstock Rebuild Project, which includes the installation of new penstock sections, foundation construction, excavation, and instrumentation. The project follows a phased timeline with design milestones reaching 100% completion by May 2027, with construction anticipated to begin in early fall 2027. The contract will be awarded on a best-value basis, with evaluation weights focusing heavily on project understanding and approach (20%) and constructability analysis methods (20%), followed by representative project experience (15%) and long-lead procurement strategies (10%). Applicants must demonstrate significant financial and operational capacity, including a minimum bonding capacity of $300 million and general liability insurance of at least $10 million per occurrence. All work must comply with California Department of Transportation Standard Specifications and prevailing wage requirements. Submissions must be submitted electronically via the Euna portal by December 17, 2026.
Yuba County Water Agency

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Norwich Waterfront Revitalization
Solicitation # 27-37
The Norwich Waterfront Revitalization project, managed by the City of Norwich, Connecticut, is a comprehensive construction effort with an anticipated duration of 270 days. The base bid scope includes the construction of a restroom and mechanical building, a combined splash pad and ice rink slab with utilities, a pre-engineered band shell with a concrete stage, and various site improvements such as concrete sidewalks, plazas, stairs, retaining walls, and bituminous concrete pavements. Additionally, the project covers essential storm, water, sewer, and electrical utilities, as well as landscaping. Bid alternates include the Rose Alley Pump Station force main replacement, West Main Street access, restroom building façade upgrades, a restaurant expansion at 150 Chelsea Harbor Drive, and boat launch removal and infill. The contract will be awarded to the lowest responsible and qualified bidder, with evaluation based on skill, ability, integrity, and past performance. For projects valued at $1,000,000 or more, contractors must be prequalified by the Connecticut Department of Administrative Services. Key financial and legal requirements include a 5% bid surety, and performance and payment bonds each equal to 100% of the total proposal price. The contractor must adhere to prevailing wage rates under C.G.S. § 31-53c and maintain commercial general liability insurance. Furthermore, the contract mandates a 25% set-aside for DAS-certified subcontractors, with a specific 6.25% goal for minority, women, and disabled-owned businesses. Proposals must be submitted via the City of Norwich Procurement portal by January 11, 2027.
DAS Procurement

POSTED

about 8 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Solicitation 2027-7110-114 is an Invitation for Bid issued by Isle of Wight County, Virginia, for the Phase 1 construction of Henry H. Bradby Park. Located on a 51.67-acre parcel in Smithfield, the project involves approximately 6.63 acres of land disturbance to develop parking facilities, walking trails, recreational facilities, and stormwater management infrastructure, while leaving 45.038 acres as undisturbed open space. The scope includes initial site preparation, clearing, demolition, grading, and landscaping. All work must comply with the 2018 Virginia Statewide Building Code, VDOT Road and Bridge Standards, and the Virginia Stormwater Management Handbook. The contract will be awarded as a firm-fixed-price agreement to the lowest responsive and responsible bidder, with federal funding from the National Park Service's Land and Water Conservation Fund strictly prohibiting post-bid negotiations. Due to this funding, the project must adhere to Build America, Buy America Act material sourcing restrictions and endangered species environmental windows. The performance period requires substantial completion within 300 days of the notice to proceed, with final completion due 45 days thereafter. Key administrative requirements include a 5 percent retainage on construction projects and the submission of bid, performance, and payment bonds for bids exceeding 500,000 dollars. Contractors must provide evidence of proper licensure, such as Class C certification for specific project values and master certifications for electrical, plumbing, and HVAC work. Payment is processed via Net 30 terms, preferably through Paymode Direct Deposit. The County also mandates compliance with various federal and state civil rights acts and safety standards, noting that safety violations may lead to immediate contract termination.
Parks & Recreation

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # 27032
The County of Greenville is soliciting proposals from qualified general contractors for site improvements at Northside Park in Taylors, South Carolina. The project is divided into Phase 1, Phase 2, and an Alternate Phase, focusing on the renovation of parking lots, access routes, and the expansion of athletic courts to include additional pickleball courts and a shaded plaza. The comprehensive scope of work includes demolition of existing pavement, fencing, and amenities; site work such as grading, stormwater treatment, and the installation of a 27 by 40 foot pavilion shade structure; and extensive landscaping including sod and tree planting. All work must adhere to ADA Title II guidelines and OSHA safety regulations. Proposals are due by November 25, 2026, and will be evaluated on a 100-point scale across five equally weighted categories: responsiveness, experience, references, pricing, and project approach. The anticipated notice to proceed is December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Selected contractors must provide a bid bond and a performance and payment bond for the total contract price. Payment is based on monthly invoicing with a 30-day term, and the County will withhold 10 percent of payments until satisfactory project completion. Liquidated damages of 250 dollars per day will be assessed if work exceeds 90 calendar days from the notice to proceed.
PARKS ADMINISTRATION

POSTED

about 9 hours ago

DEADLINE

in 9 days
View Details

More opportunities from California → Napa County

Same awarding agency

NAICS: 541620
SLED
Napa County Regional Climate Action and Adaptation PlanThe Napa County Regional Climate Action and Adaptation Plan is a coordinated regional initiative led by Napa County in partnership with the cities of American Canyon, Calistoga, Napa, St. Helena, and the Town of Yountville, aimed at reducing greenhouse gas emissions and enhancing climate resilience across the county. The plan targets key emission sources including vehicle travel, electricity use, natural gas consumption, and local land use practices, with measurable strategies organized across sectors such as energy, transportation, waste, and land use. Implementation timelines span from near-term actions starting in 2026 to long-term goals extending through 2045, with annualized cost estimates ranging from $386,085 in 2030 to $718,500 by 2045, reflecting projected investments in emissions reduction and adaptation measures. The plan includes specific project actions with clear performance targets and financial projections, though it does not conform to traditional federal procurement structures or include standard FAR clauses, contract line items, or formal bid evaluation criteria. The plan requires rigorous environmental compliance under CEQA, Cal/OSHA, CALGreen, and state and federal endangered species protections, with mandatory biological surveys, qualified biologist oversight, and habitat conservation measures. Construction and project activities must adhere to strict protocols including equipment decontamination to prevent invasive species spread, use of certified weed-free materials, installation of tire track stations, and implementation of spill prevention plans. All personnel must undergo environmental training, and work may be halted immediately if special-status species are detected. Mitigation efforts must include permanent conservation of affected lands via easements, and coordination with CDFW and USFWS is required for any project impacting protected species or habitats. Submission of proposals is due by August 31, 2026, via email, postal mail, or through an online portal, with oversight coordinated by Jesse Gutierrez, Principal Planner – Sustainability at Napa County’s Department of Planning, Building and Environmental Services. While the initiative involves significant environmental and infrastructure investment, it is structured as a policy implementation framework rather than a competitive procurement, with no formal contracting officer, COR, COTR, payment office, or federal accounting identifiers designated.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Fulton Ranch Vineyard Agricultural Erosion Control Plan (ECPA) #P23-00326-ECPA
Solicitation # P26-00176-ECPA
The contract pertains to the implementation of an agricultural erosion control plan for the development of a 4.79-acre vineyard on three parcels within a larger 182.78-acre property in Calistoga, California, with approximately 3.66 net acres designated for planting in five distinct vineyard blocks. It authorizes land-disturbing activities on slopes exceeding 5%, including the clearing of oak woodland, Douglas fir forest, and ruderal vegetation within defined limits, as well as earthmoving, land contouring, and the installation and ongoing maintenance of erosion and runoff control measures necessary to support agricultural infrastructure. The project was approved by the Napa County PBES Director on July 14, 2026, and the associated plan is formally identified as ECPA #P23-00326-ECPA. The activity is governed under the jurisdiction of Napa County, with the place of performance specified as Calistoga, CA 94515, and the primary point of contact is Pamela Arifian, Planner III, who can be reached via email or phone for administrative and regulatory inquiries. Dirk Fulton, Manager and General Partner, is listed as a secondary contact, indicating direct ownership or operational involvement in the project. The plan is publicly accessible through the California Environmental Quality Act database via the linked online portal, ensuring transparency and compliance with state environmental standards. No set-aside or NAICS classification is applied, reflecting its status as a local agricultural development subject to county-level environmental review.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
1260 Shady Brook Vineyard Track I Agricultural Erosion Control Plan (ECPA) P25-00011-ECPA
Solicitation # P25-00011-ECPA
The project, identified as P25-00011-ECPA, involves the development of approximately 1.3 gross acres of vineyard within a 41.8-acre parcel located at 1260 Shady Brook Lane in Napa, California. Approved by Napa County on June 29, 2026, the scope of work includes land disturbing activities on slopes greater than 5%, the clearing of oak woodland and ruderal lands, earthmoving, land contouring, and the installation of agricultural infrastructure. The project is supported by a Mitigated Negative Declaration under CEQA, concluding that the development will not have a significant environmental effect provided specific mitigation measures are implemented. Key technical requirements include a soil loss analysis and hydrologic analysis to ensure that sediment delivery and peak runoff do not exceed pre-project levels. Environmental protections are central to the contract, requiring the preservation of oak woodlands, pre-construction surveys for Crotch's bumble bee between April and August, and the installation of protective fencing around Napa bluecurl and Green monardella populations. Additionally, a water availability analysis confirmed that groundwater demands for the vineyard are within the site's recharge capacity. The project is managed by Daniel and Deborah Chen and implemented by Applied Engineering, Inc., with oversight from the Napa County Planning, Building and Environmental Services Department.
Environmental Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541330
SLED
230 Long Ranch Road LLC Vineyard Development Agricultural Erosion Control Plan #P24-00114-ECPA
Solicitation # P24-00114-ECPA
The 230 Long Ranch Road LLC Vineyard Development project, identified by Agricultural Erosion Control Plan #P24-00114-ECPA, involves the development of a vineyard on a 48.42-acre property in St. Helena, California. Approved by the Napa County PBES Director on June 8, 2026, the scope of work includes clearing vegetation, earthmoving, and land contouring to develop approximately 14.8 to 18.8 gross acres of vineyard, consisting of four vineyard blocks with approximately 12.1 to 15.8 net planted acres. The project specifically addresses land disturbing activities on slopes greater than 5% and requires strict adherence to erosion control measures to ensure no net increase in soil loss or runoff. Environmental compliance is a central component of the contract, governed by the California Environmental Quality Act (CEQA). A Mitigated Negative Declaration was adopted following a public review period from November 27 to December 27, 2025. Key environmental mandates include the retention of at least 3.0 acres of chamise alliance habitat and the preservation of 4.1 acres of Scrub Interior Live Oak habitat. The project also requires preconstruction surveys for nesting birds, protection of special-status plant species, and a three-year monitoring period for any replaced vegetation. Technical adequacy has been verified by the Napa County Engineering Division, and the project is subject to a specific grading season from April 1 through September 15. Administration of the project is handled on a time and materials basis, with the Napa County Planning Division overseeing inspections of fencing and habitat preservation before earthmoving begins.
Engineering Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Crush Partners Vineyard Track I Agricultural Erosion Control Plan Application (ECPA) P25- 00003-ECPA
Solicitation # P25-00003-ECPA
The Crush Partners Vineyard project, identified by permit P25-00003-ECPA, involves the development of approximately 18.3 gross acres of vineyard within a 27.98-acre parcel located on Wooden Valley Road in Napa, California. The scope of work includes clearing grassland, earthmoving with approximately 1,000 cubic yards of cut and fill, and the installation of erosion and runoff control measures on slopes greater than 5 percent. The project consists of 7.8 acres of replanted existing vineyard and 7.8 acres of new vineyard, totaling approximately 15.6 net planted acres. Performance requirements include maintaining a permanent cover crop and vineyard avenues with a minimum vegetation cover density of 75 percent to prevent soil loss and manage peak storm flow. The project was approved by Napa County on August 3, 2026, following a Negative Declaration under CEQA indicating no significant environmental impacts. Key technical requirements include a 35-foot setback from ephemeral streams, adherence to a grading season from April 1 through September 15, and preconstruction nesting bird surveys between February 1 and August 31. The project is supported by comprehensive analyses, including a Water Availability Analysis for groundwater use, a Landslide Hazard Evaluation, and a Biological Resources Reconnaissance Survey to protect oak woodlands and special-status species. Administrative terms specify that the applicant, Rob Lloyd, is responsible for all county processing fees, with payments due within 30 days of billing.
Environmental Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
AXR Napa Valley Winery - Major Use Permit Modification, Variance, and Viewshed
Solicitation # P22-00417
The AXR Napa Valley Winery project, approved by the Napa County Planning Commission on June 3, 2026, involves a major modification to Winery Use Permits P08-00099 and P04-0541. The scope of work includes the construction of a 17,190 square foot type I wine cave and the conversion of several existing structures for tasting and hospitality purposes, including a 1,492 square foot barrel storage building, a 1,204 square foot outdoor crush/tank pad, and the 4,147 square foot main floor of the historic Hirsch residence for office and tasting room use. These modifications are intended to support an expanded marketing program and an increase in both employees and visitor traffic at the St. Helena, California location. Infrastructure improvements are a central component of the project, featuring water and wastewater system upgrades and the installation of a left turn lane and driveway modifications on Highway 29. To facilitate these improvements, the project includes a variance to the 600-foot winery setback from SR 29 for aboveground wastewater structures and an Administrative Viewshed Permit for cave portals and utility improvements on slopes between 15 and 18 percent. The project is governed by a Mitigated Negative Declaration, with specific mitigation measures and monitoring plans adopted as conditions for approval. Administrative oversight is managed by Hannah Spencer of the Napa County Planning, Building, and Environmental Services Department.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 111332
SLED
B&F Farms Vineyard Conversion $P25-00029-ECPA
Solicitation # P25-00029-ECPA
The project involves the conversion of approximately 120 acres in Yountville, California, into a vineyard, with 10.1 gross acres developed for planting and 7.4 net planted acres dedicated to vine cultivation. Activities include clearing diverse vegetation types such as non-native grassland, coyote brush scrub, coast live oak woodland, and knobcone pine forest, followed by earthmoving, installation of erosion and runoff controls, and development of agricultural irrigation infrastructure. All work is subject to strict seasonal limitations to protect sensitive species, particularly avoiding ground disturbance during the Northern Spotted Owl nesting season from February through July. Biological surveys for Clara Hunt’s milk-vetch and owl activity must be conducted by qualified biologists using protocols mandated by the California Department of Fish and Wildlife and the U.S. Fish and Wildlife Service, with reports submitted prior to any ground-disturbing activities. A 0.25-mile no-disturbance buffer must be maintained if active nests are detected, and an Incidental Take Permit under the California Endangered Species Act may be required if impacts to protected species cannot be fully avoided. The project is governed by California Environmental Quality Act (CEQA) compliance procedures and has been determined to proceed under a Mitigated Negative Declaration, contingent upon adherence to approved mitigation measures outlined in a Draft Mitigation Monitoring and Reporting Program. Regulatory oversight is administered by Napa County’s Department of Planning, Building, and Environmental Services, with Donald A. Barrella serving as the Principal Planner and primary point of contact. Compliance with the Migratory Bird Treaty Act, CDFW survey protocols, and potential Lake and Streambed Alteration Agreement requirements are mandatory. There is no formal federal contract structure, pricing data, or procurement evaluation criteria; instead, this is a local land-use permit requiring environmental mitigation and regulatory approvals. The project site is located in ZIP code 94558, and all submissions must be filed electronically through the CEQA Submit Portal or physically delivered to Napa County offices, with public review ending on May 29, 2026. No federal acquisition regulations, contract clauses, or financial terms apply, as this falls entirely under state and local environmental permitting authority.
Grape Vineyards

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Barnett Winery - Use Permit (P19-00125-UP), Viewshed Protection Program (P20-00121-VIEW), and Exception to the Road and Street Standards
Solicitation # P19-00125-UP
The Barnett Winery project seeks approval through Napa County to expand operations at its existing 20,000-gallon winery located at 4018/4070 Spring Mountain Road in Calistoga, California. The proposal includes remediation of unpermitted activities such as increased employee count, daily tours and tastings by appointment, marketing events, and on-premise outdoor wine consumption, which have triggered requirements for public water system upgrades, wastewater system improvements, and an exception to the Road and Street Standards for driveway modifications. Beyond compliance, the project proposes significant expansion: increasing annual wine production to 30,000 gallons, raising the full-time employee count to nine, intensifying visitor programs, constructing a new 1,700-square-foot hospitality building with a tasting room and office, adding parking spaces, installing a 12,000-gallon fire protection water tank, and implementing new landscaping, all subject to the stringent design and visual preservation requirements of the Viewshed Protection Program. Environmental compliance is central, with mandatory adherence to CEQA guidelines, implementation of a Mitigation Monitoring and Reporting Program, specific biological surveys to protect nesting raptors during seasonal restrictions, and strict control over stormwater, dust, and groundwater impacts in accordance with Napa County ordinances, California Fish and Game Code, and best management practices from CASQA and BAAD. The project has been processed under a land use permit framework rather than a traditional procurement contract, with no federal acquisition regulations, contract clauses, pricing structures, or procurement-specific terms such as LPTA or Best Value applied. Oversight is managed by Napa County’s Planning and Building Department, with Matt Ringel as the primary point of contact, and key approvals contingent upon engineering certification, environmental mitigation execution, and on-site compliance verification during construction and final inspection phases. All operations must align with existing groundwater protection standards, fire safety codes, and land use zoning restrictions, ensuring that growth is balanced with ecological and aesthetic preservation in the region.
Other Heavy and Civil Engineering Construction

POSTED

10 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS