Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

NGIS - REPAIRS TO FUEL STORAGE TANKS AND SYSTEMS

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Europe Africa CentralView Agency

NAICS

N/A

Place of Performance

E: SOUDA BAY, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Europe Africa Central
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Europe Africa Central
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Numerous upgrades are required to the existing underground/aboveground storage tanks due to the issuance of the Environmental Final Governing Standards (FGS); including appropriate secondary containment, cathodic protection, and leak detection. Project will bring the tanks into compliance with the FGS requirements and reduce the risk of spills and releases to the environment. Building 48, BEQ (UST-048-01) Underground Storage Tank (UST), Diesel, 2,500 gallons The existing tank provides fuel for the heating boiler for Building 48. a) Provide corrosion protection for underground piping to include secondary containment and leak detection. b) Secure all fill-ports and install fill-port spill bucket. c) Install screen on tank vent pipe. d) Install isolation valves for line tightness testing. e) Tanks: Interstitial space monitors need to be repaired/replaced. f) High level alarms and level indicators need to be installed. Building 49, BEQ (UST-049-01) Underground Storage Tank (UST), Diesel, 4,000 gallons The existing tank provides fuel for the heating boiler for Building 48. a) Provide corrosion protection for underground piping to include secondary containment and leak detection. b) Secure all ports and install fill-port spill bucket. c) Install screen on tank vent pipe. e) Tanks: Interstitial space monitors need to be repaired/replaced. f) High level alarms and level indicators need to be installed. NGIS Fuel Tanks have contradicting data: Building 48 Building 49 Building 56 Experts can produce volumetric table for fuel tank, by using laser method or by filling the tank with water. This process is called calibration. Points to bring to your attention: - Both methods require the tank to be empty, before calibration. The contractor must have a vehicle that can pump the fuel out of the tank, s ... NOTE: description has been truncated, please see Project Note for full description.