Replace Existing Chiller#2 System, Bldg. 2001, ENERGY2912I-Bangor (DBB-AE) 20996693
Active
FederalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Department Of The Navy → Navfac NorthwestView Agency
NAICS
N/A
Place of Performance
NW: BANGOR PDC, USASet-Aside
NONE
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyDepartment Of The Navy → Navfac Northwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available
Full Description
Show more
DELIVERABLE: CAT2, DBB-AE DESIGN PSC CODE: C1NB – ARCHITECT AND ENGINEERING – CONSTRUCTION MECHANICAL HEATING AND COOLING SYSTEMS CONSTR PSC CODE: Z2NB – REPAIR OR ALTERATION OF HHEATING AND COOLING PLANTS UNIFORMAT MASTER SYSYTEM: D30 – HVAC REQUESTED SCHEDULE: DESIGN - FY2024-Q4 / CONSTR. FY25-Q4 LOCATION: TRITRAFAC MECHANICAL PLANT, BLDG. 2001, NBK-BANGOR. ENERGY Notes: CNRNW-06209 1391: YES REQUIREMENT: Replace Existing Chiller (#2). Includes replacement of both Chiller#2 and Cooling Tower #2. Demo of existing unused systems and supporting components and equipment. Fully Integrate all newly replaced systems, components and equipment, mechanically, electrically, seismically, and communicatively. Ensure proper operation at time of project completion. ** A detailed Customer provided Scope of Work is located in the V-drive Project Folder. JUSTIFICATION: Existing Chiller is unreliable, leaks refrigerant, and not energy efficient. Existing Cooling Tower leaks water – profusely. The existing Cooling Tower system requires excessive make-up water to maintain appropriate sump levels. Intent for replacing these systems is to make the existing Chilled Water Plant more efficient, reliable, and to conserve water; as-well-as to make more reliable and unplanned outage less frequent, and to reduce costly ongoing repairs to the system. The original Cooling Towers were built with 1979 construction. NOTES: 1. Recommend that ET/CM establish a contractor laydown area/plan, prior to award and shall be written and identified in the SOW. 2. Chiller Asset # -- 2001-0-MEC-1565-40-1B. 3. Cooling Tower Asset # -- 2001-0-000-1565-30-1B 4. Supporting documents are located in the V-drive project folder, such as equipment FMMS Tags and equipment mechanical schedules. 5. If pictures are required, th ... NOTE: description has been truncated, please see Project Note for full description.