MSR #21261608_1742457 -- (21261608) Replace Timber Piles and Waterfront Repairs, Pier C NBK Bremerton

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This forecast from Navfac Northwest involves critical waterfront repairs and the replacement of timber piles at Pier C in NBK Bremerton. The project is driven by inspection report CR-NAVFAC EXWC-CIOFP-1659, which identified severe structural issues necessitating a total prohibition of loading, lateral berthing, and mooring at the southern timber pier extension. To restore operational capacity, the contract requires the full replacement of the southern timber pier extension and all associated timber framing members. The scope of work includes specific technical requirements such as repairing 1,800 square feet of spalling concrete, replacing 250 linear feet of timber curbs, and installing 20 new timber fender piles. Additionally, the project involves the removal of sea life from electrical components. Classified under NAICS code 237990 for Other Heavy and Civil Engineering Construction, these efforts will be incorporated into Design Build Project 18145284 to ensure the structural integrity and safety of the facility.

General Info

Navfac Northwest contract for Pier C timber pile replacement and waterfront repairs at NBK Bremerton.

NAICS

237990-Other Heavy and Civil Engineering Construction

Place of Performance

NW: BREM PDC, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Northwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Magnitude Of Discrepancy: Reference: CR-NAVFAC EXWC-CIOFP-1659 - Repair “Operational Restrictions: It is recommended that all loading be prohibited from the southern timber pier extension, including lateral berthing and mooring loads.” “It is also recommended that the southern timber pier extension be replaced, including all of the timber framing members. Until repairs are completed, all loading should be prohibited in this area including mooring and berthing of vessels.” Incorporate results of CR-NAVFAC EXWC-CIOFP-1659 Inspection Report into Design Build Project 18145284 Spalling Concrete 1300 S/F 18145296 Timber Curbs 250 LF 18145297 Replace 20 each Timber Fender Pile 19484888 Remove Sea Life from Electrical 18145286 Repair Spalling Concrete 18145288 Repair Spalling Concrete 500 S/F FMS Mark Winger Sign up to see this detail

Similar Contracts

Same NAICS industry code

More opportunities from Department Of The Navy → Navfac Northwest

Same awarding agency

NAICS: 236220
Federal
MSR #23207821_1787796 -- (23207821) Repair Crane Track and Tunnel Arch Support DD1, PSNSThis project involves comprehensive seismic upgrades to the superstructure and substructure of a facility managed by Navfac Northwest, specifically focusing on the repair of crane tracks and tunnel arch support. The scope of work includes retrofitting building brace connections, modifying restrooms for American Barrier Act compliance, and updating heating and ventilation systems. Additionally, the project requires the removal and reinstallation of various architectural, electrical, and mechanical interferences, including plant equipment, shop tools, and storage racks. Electrical upgrades will be implemented to install a 480VAC three-phase grounded system and correct documented HDA safety hazard deficiencies across RAC 2, 3, and 4 categories. All work must comply with the Unified Facility Code, National Fire Protection Association, and International Building Code, while prioritizing energy efficiency and low life cycle costs. Because the machine shop is on the historical register, all modifications require review and concurrence from the State Historical Preservation Office to maintain the building's historical integrity. Station support will be provided through red badge escorts, outage coordination, hazardous material handling assistance, and a facility production process specialist to ensure seamless project execution.
Commercial and Institutional Building Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS