Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

MSR#37879461_1880385 -- (IH-DB_37879461) Construct Near Term Site Develop for Laydown, CAMWES, Bremerton

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac NorthwestView Agency

NAICS

N/A

Place of Performance

NW: BREM PDC, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Northwest
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Northwest
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
MPSR#: 37879461 Deliverable: DB-IH Requested Schedule (FY and Quarter): FY26/Q4 Priority: 3 IPL Type: CNIC-SPECPROJ CMP-OMN-II (May be NF) PSC Design: C1GD - Architect and Engineering- Construction: Open Storage Facilities PSC Construction: Y1GD - Construction of Open Storage Facilities FEAD Planning Support: ESAR, 1391, 1354 Environmental Support: CATEX, SHPO, Storm Water, Habitat, Wet Land Delineation. CIO Review: NA REIMB Labor: NA Requirement: Refer to attached maps, provided by customer for site details (located in V-drive project folder): a. Prepare laydown sites 1, 2, 3, 5, and 9 for various laydown activities, as shown on the attached graphic. Conduct storm water design. Conduct land clearing, soil erosion control, grading, grubbing, including existing roads. There are ~ 150K-sq. ft. of laydown surfaces and ~2.5K LF of roadway surfaces to prepare for various laydown activities. Site development element considerations include but are not limited to: • Stormwater Design • Subgrade preparation. • Stormwater Management • Gravel placement. • Soil and surface stabilization. • Surface grading. b. The construction contract cannot be awarded until the NEPA process is complete, including all necessary consultations. Environmental studies to support consultations and stormwater design are scheduled to complete early FY26, Q3 and can be referenced under eP# 1877866. c. Stormwater design elements required as part of the NBK MS4 Permit coverage area, to be determined at Final Design deliverable. Final Stormwater Design may suggest and require maximum filtration. d. Other site development elements required: • Surface grading to meet stormwater management requirements. • Final Stormwater ... NOTE: description has been truncated, please see Project Note for full description.

More opportunities from Department Of The Navy → Navfac Northwest

Same awarding agency