Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This 8(a) set-aside forecast issued by Navfac Northwest for the Puget Sound Naval Shipyard IMF involves a design-bid-build architectural and engineering project at the TRF-Bangor facility. The scope of work includes replacing and upgrading the control console and all related sub-systems within the drydock pump room, as well as redesigning the facility sewer tanks to increase capacity and improve pumping efficiency from internal tanks to the external sewer system. Additionally, the project requires the design and installation of protective metal envelopes for two 15 by 10 foot entryways, featuring interior lighting and overhead access for lifting equipment. The project is scheduled for design in the second quarter of fiscal year 2026, with construction expected to begin in the first quarter of fiscal year 2028. Classified under NAICS code 237990, the work will be performed at the NW Bangor PDC. This effort is managed under the Department of the Navy for the Puget Sound Naval Shipyard IMF.

General Info

Navfac Northwest 8(a) project for pump room, sewer, and entryway upgrades at Bangor.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

NW: BANGOR PDC, USA

Set-Aside

8A

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Northwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
MPSR# 24869535 CAT-2 DBB-AE DESIGN: Q2 FY26; CONSTRUCTION: Q1 FY28 1. Replace and upgrade control console in the drydock pump room and all associated systems and sub-systems. 2. Redesign to increase capacity of facility sewer tanks. Improve volumes of pumping of sewer from internal tanks to external sewer system. 3. Design and install protective metal envelop for the two entryways. Envelope will have an overhead access to have the ability to lift equipment in or out of the facility from below. Install interior lighting. Each entryway is approximately 15 by 10 FT and with similar configuration. Command Name: Puget Sound Naval Shipyard IMF (TRF) UIC: N4523A

Similar Contracts

Same NAICS industry code

More opportunities from Department Of The Navy → Navfac Northwest

Same awarding agency

NAICS: 236220
Federal
MSR #23207821_1787796 -- (23207821) Repair Crane Track and Tunnel Arch Support DD1, PSNSThis project involves comprehensive seismic upgrades to the superstructure and substructure of a facility managed by Navfac Northwest, specifically focusing on the repair of crane tracks and tunnel arch support. The scope of work includes retrofitting building brace connections, modifying restrooms for American Barrier Act compliance, and updating heating and ventilation systems. Additionally, the project requires the removal and reinstallation of various architectural, electrical, and mechanical interferences, including plant equipment, shop tools, and storage racks. Electrical upgrades will be implemented to install a 480VAC three-phase grounded system and correct documented HDA safety hazard deficiencies across RAC 2, 3, and 4 categories. All work must comply with the Unified Facility Code, National Fire Protection Association, and International Building Code, while prioritizing energy efficiency and low life cycle costs. Because the machine shop is on the historical register, all modifications require review and concurrence from the State Historical Preservation Office to maintain the building's historical integrity. Station support will be provided through red badge escorts, outage coordination, hazardous material handling assistance, and a facility production process specialist to ensure seamless project execution.
Commercial and Institutional Building Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS